网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order,  what will be the result? ()
A

 All LPARs will start except LPAR5.

B

 All LPARs will start with desired capacity.

C

 All LPARs will start but LPAR5 will have its minimum capacity assigned.

D

 All LPARs will start but LPAR5 will have less than its desired capacity.


参考答案

参考解析
解析: 暂无解析
更多 “单选题An administrator has installed 1 VIO Server and 5 client LPARs on a 16-core Power 570 with the following CPU requirements: Virtual Processors Processing Units Min Desired Max Min Desired Max VIOS1 1 2 4 0.1 1.0 2.0 LPAR1 4 4 4 4.0 4.0 4.0 LPAR2 2 5 8 1.0 5.0 6.0 LPAR3 1 3 4 0.1 0.3 1.0 LPAR4 3 6 9 0.5 3.0 6.0 LPAR5 1 3 6 1.0 3.0 .06 If the administrator activates the LPARs in the above order,  what will be the result? ()A  All LPARs will start except LPAR5.B  All LPARs will start with desired capacity.C  All LPARs will start but LPAR5 will have its minimum capacity assigned.D  All LPARs will start but LPAR5 will have less than its desired capacity.” 相关考题
考题 单选题An administrator is creating a new logical partition (LPAR) with 6 virtual processors and 4 processing units. This LPAR must have the highest priority in the shared processor pool. Which weight should be assigned to this LPAR?()A  0B  1C  255D  256

考题 单选题Which of the following statements is true regarding implementing Live Partition Mobility on two existing POWER6 based systems? ()A  The systems must use internal storage for boot purposes.B  All virtualized Ethernet adapters must be numbered below 10.C  The mobile partition’s network and disk access must be virtualized.D  Each system must be controlled by a different Hardware Management Console (HMC).

考题 单选题An administrator has a Power 570 in default configuration with a 4 port 1 Gbps Integrated Virtual Ethernet (IVE) adapter. A new application requires that the MCS value for the first port group of the IVE adapter be set to 1. If this change is made, what is the maximum number of logical ports, across both port groups, that the IVE adapter can provide?()A  4 B  16 C  20 D  32

考题 单选题Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()A  Dynamic LPARB  Micro PartitionsC  Entitled capacityD  Multiple Shared Processor Pools

考题 单选题Which of the following interfaces is required to implement Workload Partition Mobility? ()A  Workload Partitions Manager for AIXB  Hardware Management Console (HMC) GUIC  Integrated Virtualization Manager (IVM)D  Advanced System Management Interface (ASMI)

考题 单选题Which one of these statements is true regarding hot pluggable PCIe and PCI-X slots in a Power 550?()A Cards can be added and then enabled via Hardware Management Console (HMC) GUI or command line. B The HMC allows access to the Advanced System Management Interface (ASMI), where the slots can be managed. C If the empty slot was already allocated to an LPAR, the LPAR can use the card after the cfgmgr script has been run. D The Hardware Management Console (HMC) GUI can guide a customer through the process of adding a card to an empty slot. 

考题 单选题Which IOS command does an administrator use to report a cross partition global view of system performance?()A cecstat -p itcert B iosperf -C C topas -cecdisp D topas_nmon -cec 

考题 单选题How would an administrator configure a VIO server to deny rsh connections from IP address 192.168.16.109?()A chnetsvc rsh -o deny=192.168.16.109 B chtcpip -s rsh -o deny=192.168.16.109 C cfgsec -level high -deny port=514 -address 192.168.16.109D viosecure -firewall deny -port 514 -address 192.168.16.109

考题 单选题What does the "allow performance information collection" button do in the Hardware Management Console (HMC) GUI? ()A  It allows you to get inter partition reports, or cross partition performance activity.B  It will allow IBM remote technical support to get performance information from the machine.C  It is effective only on POWER6 and when Live Partition Mobility operations are planned.D  It will start standard performance monitoring tools when an LPAR boots up, the output will be saved to the /etc/perf directory by default.