网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()
A

Run a system WPAR and deploy the application.

B

Create a new LPAR and deploy the application.

C

Create an application WPAR to deploy the application.

D

Create an LPAR hosted by a VIO server and deploy the application.


参考答案

参考解析
解析: 暂无解析
更多 “单选题A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()A Run a system WPAR and deploy the application.B Create a new LPAR and deploy the application.C Create an application WPAR to deploy the application.D Create an LPAR hosted by a VIO server and deploy the application.” 相关考题
考题 A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change.How can this deployment be achieved with a minimum of effort and time?()A.Run a system WPAR and deploy the application.B.Create a new LPAR and deploy the application.C.Create an application WPAR to deploy the application.D.Create an LPAR hosted by a VIO server and deploy the application.

考题 How should you warm up a diesel engine that has not been run for some time?______.A.Run it at minimum speed for a period of timeB.Run it at half speed for a period of timeC.Bring it to top speed immediatelyD.Inject ether into the air intake

考题 Your network has 1,000 client computers that run Windows XP. You are planning to deploy Windows 7.  You plan to use the Microsoft Deployment Toolkit Lite Touch Installation deployment method to deploy the Windows 7 image.   You have the following requirements:   Migrate 20 computers at a time.  Ensure that you conserve network bandwidth.   You need to design a deployment strategy that meets the requirements.   What should you do?()A、Configure multicast transmission on the deployment point.B、Configure unicast transmission on the deployment point.C、Compress the contents of the distribution folder.D、Distribute the image by using Background Intelligent Transfer Service (BITS).

考题 Your company has 1,000 client computers. Each client computer has 1 GB of RAM. You are planning to deploy Windows 7 Enterprise.   You need to design a zero-touch deployment strategy to increase the number of client computers that can be imaged at one time.   What should you do?()A、Increase the amount of RAM on the client computers.B、Change from unicast to multicast deployment of images.C、Change from multicast to unicast deployment of images.D、Decrease the trivial file transfer protocol (TFTP) block size on the TFTP server.

考题 Your company has 1,000 client computers.  You are planning to deploy Windows 7 and a new line-of-business application.   You have the following requirements:   Install the application as part of the standard Windows 7 deployment. Use a single Windows 7 image for the deployment.  The application must be available for use on client computers that are not connected to the network.   You need to ensure that the application is installed on all new client computers.   What should you do?()A、Publish the application by using Group Policy Software Installation.B、Deploy the application by using Windows Server Update Services (WSUS).C、Service an online image of Windows 7 to add the new application.D、Service an offline image of Windows 7 to add the new application.

考题 You create Windows Forms applications by using the .NET Framework 3.5.You plan to deploy a new Windows Presentation Foundation (WPF) XAML browser application (XBAP).The deployment must meet the following requirements:  (1)shortcut is added to the Start menu   (2)The most recent version of the application is installed and executed on client computers   (3)Users can uninstall the application from the control panel    You need to identify a deployment technology that meets the specified requirements.You want to achieve this goal by using the minimum amount of development effort. Which deployment technology should you use?()A、XCOPYB、ClickOnceC、MicrosoftWindows InstallerD、Remote Desktop connections

考题 A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()A、Run a system WPAR and deploy the application.B、Create a new LPAR and deploy the application.C、Create an application WPAR to deploy the application.D、Create an LPAR hosted by a VIO server and deploy the application.

考题 A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()  A、Run a system WPAR and deploy the application.B、Create a new LPAR and deploy the application.C、Create an application WPAR to deploy the application.D、Create an LPAR hosted by a VIO server and deploy the application.

考题 You create Windows Forms applications by using the .NET Framework 3.5.You plan to deploy a new application.You need to ensure that on deployment, the application meets the following requirements:  (1)It is executed on the client computer   (2)It is removed from the client computer after the application is closed   (3)It is not displayed in theAdd/Remove programs panel on the client computer    What should you do?()A、Deploy the application to a central network server.Access the application by using the Remote Desktop Connection tool.B、Deploy the application by using the ClickOnce technology.Use the Mage exe tool to set the Online Only option in the deployment manifest.C、Deploy the application by using the ClickOnce technology.Set the Install attribute of the deployment tag to true in the deployment manifest.D、Deploy the application to a CDROM by using the ClickOnce technology.Execute the application from the CDROM

考题 Your network contains a single Active Directory domain. You have 100 servers that run Windows   Server 2008 R2 and 5,000 client computers that run Windows 7.  You plan to deploy applications to the client computers.   You need to recommend an application deployment strategy that meets the following requirements:   èApplications must be deployed only to client computers that meet the minimum hardware requirements.   èDeployments must be scheduled to occur outside business hours.   èDetailed reports on the success or failure of the application deployments must be provided.   What should you recommend?()A、Deploy applications by using Group Policy.B、Implement Windows Server Update Services (WSUS).C、Implement Microsoft System Center Operations Manager (SCOM) 2007 R2.D、Implement Microsoft System Center Configuration Manager (SCCM) 2007 R2.

考题 You create Windows Forms application by using the .Net FrameWork 3.5 You plan to deploy a new application to client computers that use the Windows Vista operating system. You need to ensure that the user can install the application without being prompted fore elevated permission.What should you do?()A、Sign the deployment manifest by using an Authenticode certificate.Publish the application to a CD-ROM.Install the application on each client computer from the CD-ROMB、Sign the deployment manifest by using an Authenticode certificate.Publish the application to a server on the network.Install the application on each client computer.C、Add the requestedExecutionLevel="highestAvailable" attribute to the deployment.Publish the application to a server on the network.Install the application on each client computer.D、Add the requestedExecutionLevel="requiresAdministrator" attribute to the deployment.Publish the application to a server on the network.Install the application on each client computer.

考题 Your network has 1,000 client computers that run Windows 7.   You plan to deploy a new application.   You need to ensure that the application deploys only during non-business hours.   What should you do?()A、Use Group Policy.B、Use Windows Deployment Services with a schedule cast.C、Use Microsoft System Center Configuration Manager.D、Use a logon script.

考题 Your network contains a single Active Directory site.   You plan to deploy 1,000 new computers that will run Windows 7 Enterprise. The new computers have Pre-boot Execution Environment (PXE) network adapters.   You need to plan the deployment of the new computers to meet the following requirements:  èSupport 50 simultaneous installations of Windows 7   èMinimize the impact of network operations during the deployment of the new computers   èMinimize the amount of time required to install Windows 7 on the new computers What should you include in your plan?()A、Deploy the Windows Deployment Services (WDS) server role. Configure the IP Helper tables on all  routers.  B、Deploy the Windows Deployment Services (WDS) server role. Configure each WDS server by using native mode.  C、Deploy the Windows Deployment Services (WDS) server role and the Transport Server feature.Configure the Transport Server to use a custom network profile.  D、Deploy the Windows Deployment Services (WDS) server role and the Transport Server feature. Configure the Transport Server to use a static multicast address range.

考题 Your company uses Windows Deployment Services (WDS) to deploy Windows 7. You create a new imageof Windows 7. You need to ensure that you can deploy the image by using WDS.  What should you do?()A、From the Windows Deployment Services snap-in, add a new install image.B、From the Windows Deployment Services snap-in, add a new boot image.C、Run Oscdimg.exe and specify the -boot parameter. Copy the image to C:///remoteinstall/boot.D、Run Imagex.exe and specify the /append parameter. Copy the image to C:///remoteinstall/images.

考题 All client computers in your network run Windows XP. Some of the computers are part of a secure network. Some of the computers connect to the network by using virtual private networking (VPN). You are planning to deploy Windows 7.   You have the following requirements:   Use a dedicated server for deployment.  Use a single operating system image for deployment.   Ensure that you can use removable media to deploy the image.   Ensure that you can select which applications are installed onto a client computer at the time of deployment.   You need to design a deployment strategy that meets the requirements.   What should you do?()A、 Using a Windows PE boot media, use ImageX to apply the image from a network share to the client computers.B、 Use System Center Configuration Manager 2007 R2 to perform a zero-touch installation.C、 Use the Microsoft Deployment Toolkit to perform a lite-touch installation.D、 Use Windows Deployment Services on a network server to deploy Windows 7 by using an install image.

考题 You work as the enterprise exchange administrator at Xxx .The Xxx network consists of a domain named xxx .The Xxx network has a client computer named XXX-WS662 that has Microsoft Windows 7 installed.How can you proceed with the deployment of management tools for Exchange 2010 on XXX-EX02?()A、You should run the Test-ServiceHealth cmdlet.B、You should deploy Microsoft .NET Framework 3.5.1.C、You should run the ACLDIAG and the scanforfeature command.D、You should deploy Internet Information Services (IIS) 6.0 Management console.E、You should run the wuauclt.exe /detectnow command.

考题 You are creating a Windows Forms Application by using the .NET Framework 3.5.You plan to deploy a new Applciation.You need to ensure that on deployment, the application meets the following requirements;    (1)It is executed on the client computer.   (2)It is removed from the client computer after the application closed.   (3)It is not displayed in the Add/Remove programs panel on the client computer.     What sould you do?()A、Deploy the application to a central network server.- Access the application by using hte Remote Desktop Connection tool.B、Deploy the application by using the ClickOnce technology.- Use the Mage.exe tool to set the Online Only option in the deployment manifest.C、Deploy the application by using the ClickOnce technologoy.- Set the Install attiribute of the deployment tag to true in the deployment manifest.D、Deploy the application to a CD-ROM by using the ClickOnce technology. - Execute the application from the CD-ROM.

考题 单选题You create Windows Forms application by using the .Net FrameWork 3.5 You plan to deploy a new application to client computers that use the Windows Vista operating system. You need to ensure that the user can install the application without being prompted fore elevated permission.What should you do?()A Sign the deployment manifest by using an Authenticode certificate.Publish the application to a CD-ROM.Install the application on each client computer from the CD-ROMB Sign the deployment manifest by using an Authenticode certificate.Publish the application to a server on the network.Install the application on each client computer.C Add the requestedExecutionLevel=highestAvailable attribute to the deployment.Publish the application to a server on the network.Install the application on each client computer.D Add the requestedExecutionLevel=requiresAdministrator attribute to the deployment.Publish the application to a server on the network.Install the application on each client computer.

考题 单选题A client has a temporary deployment of a new static application that needs to run for a short period of time and is not going to change. How can this deployment be achieved with a minimum of effort and time?()A Run a system WPAR and deploy the application.B Create a new LPAR and deploy the application.C Create an application WPAR to deploy the application.D Create an LPAR hosted by a VIO server and deploy the application.

考题 单选题Your company’s network has client computers that run Windows 7.   A software vendor releases version 2 of an application that your company uses.  Your company currently uses version 1.  Version 1 and version 2 are not compatible. You plan to deploy version 2 of the application.   You have the following requirements:Users must be able to run both versions of the application on their computers.   Version 2 must be available when a client computer is not connected to the network.  You need to plan a software deployment process that meets the requirements.   What should you do?()A  Deploy version 2 of the application by using Microsoft Application Virtualization (App-V). B  Deploy version 2 of the application as a Remote Desktop Services RemoteApp.C  Deploy version 2 of the application by using a Group Policy Software Installation policy.D  Deploy version 2 of the application by using a Microsoft System Center Configuration Manager package.

考题 单选题You create Windows Forms applications by using the .NET Framework 3.5.You plan to deploy a new Windows Presentation Foundation (WPF) XAML browser application (XBAP).The deployment must meet the following requirements:  (1)shortcut is added to the Start menu   (2)The most recent version of the application is installed and executed on client computers   (3)Users can uninstall the application from the control panel    You need to identify a deployment technology that meets the specified requirements.You want to achieve this goal by using the minimum amount of development effort. Which deployment technology should you use?()A XCOPYB ClickOnceC MicrosoftWindows InstallerD Remote Desktop connections

考题 单选题Your network has 1,000 client computers that run Windows XP. You are planning to deploy Windows 7.  You plan to use the Microsoft Deployment Toolkit Lite Touch Installation deployment method to deploy the Windows 7 image.   You have the following requirements:   Migrate 20 computers at a time.  Ensure that you conserve network bandwidth.   You need to design a deployment strategy that meets the requirements.   What should you do?()A Configure multicast transmission on the deployment point.B Configure unicast transmission on the deployment point.C Compress the contents of the distribution folder.D Distribute the image by using Background Intelligent Transfer Service (BITS).

考题 单选题Your network has 1,000 client computers that run Windows 7.   You plan to deploy a new application.   You need to ensure that the application deploys only during non-business hours.   What should you do?()A Use Group Policy.B Use Windows Deployment Services with a schedule cast.C Use Microsoft System Center Configuration Manager.D Use a logon script.

考题 单选题Your company has 1,000 client computers. Each client computer has 1 GB of RAM. You are planning to deploy Windows 7 Enterprise.   You need to design a zero-touch deployment strategy to increase the number of client computers that can be imaged at one time.   What should you do?()A Increase the amount of RAM on the client computers.B Change from unicast to multicast deployment of images.C Change from multicast to unicast deployment of images.D Decrease the trivial file transfer protocol (TFTP) block size on the TFTP server.

考题 单选题How should you warm up a diesel engine that has not been run for some time? ()A Run it at minimum speed for a period of timeB Run it at half speed for a period of timeC Bring it to top speed immediatelyD Inject ether into the air intake

考题 单选题All client computers in your network run Windows XP. Some of the computers are part of a secure network. Some of the computers connect to the network by using virtual private networking (VPN). You are planning to deploy Windows 7.   You have the following requirements:   Use a dedicated server for deployment.  Use a single operating system image for deployment.   Ensure that you can use removable media to deploy the image.   Ensure that you can select which applications are installed onto a client computer at the time of deployment.   You need to design a deployment strategy that meets the requirements.   What should you do?()A  Using a Windows PE boot media, use ImageX to apply the image from a network share to the client computers.B  Use System Center Configuration Manager 2007 R2 to perform a zero-touch installation.C  Use the Microsoft Deployment Toolkit to perform a lite-touch installation.D  Use Windows Deployment Services on a network server to deploy Windows 7 by using an install image.

考题 多选题You work as the enterprise exchange administrator at Xxx .The Xxx network consists of a domain named xxx .The Xxx network has a client computer named XXX-WS662 that has Microsoft Windows 7 installed.How can you proceed with the deployment of management tools for Exchange 2010 on XXX-EX02?()AYou should run the Test-ServiceHealth cmdlet.BYou should deploy Microsoft .NET Framework 3.5.1.CYou should run the ACLDIAG and the scanforfeature command.DYou should deploy Internet Information Services (IIS) 6.0 Management console.EYou should run the wuauclt.exe /detectnow command.