网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()
A

Physically press the appropriate button on the system.

B

Physically disconnect and reconnect the power cable on the system.

C

Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

D

Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.


参考答案

参考解析
解析: 暂无解析
更多 “单选题Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()A Physically press the appropriate button on the system.B Physically disconnect and reconnect the power cable on the system.C Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.D Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.” 相关考题
考题 Which of the following information would be on a system classification list?() A. Disk drive sizeB. IP addressC. Acceptable outage timeD. Operating system version

考题 There is a power outage and all servers are shut down properly by the uninterruptible power supply (UPS) software. When one of the servers starts up it displays a logical drive failed error. This server has two processors, 16GB of memory, and a RAID 5 array with 10 drives.Which of the following is the MOST likely cause?()A. A failed RAID controllerB. Two failed processorsC. Two failed sticks of memoryD. Two failed drives

考题 Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?() A. There is a fire hazard potential if a power outage occurs.B. The last system plugged into the UPS will not be provided any power.C. The UPS will draw more power from the circuit to compensate.D. The runtime of the UPS will be insufficient if a power outage occurs.

考题 Which of the following is a situation where dual (redundant) HMCs are recommended?() A.When managing more than four VIO servers.B.When installed with Power 570 and larger hardware.C.When hosting both Linux and AIX on the same physical hardware.D.When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.

考题 You need to configure the power settings of your portable computer so that the display turns off when it is inactive and running on battery power. You also need to ensure that the power settings of the hard disk remain unaffected.What should you do?()A.AB.BC.CD.D

考题 A vessel proceeding to London,England,from New York makes an unscheduled call at the port of Hamilton,Bermuda.What term is used to denote the voluntary departure from the usual course?A.AlterationB.DeviationC.LibertyD.Unscheduled stop

考题 An administrator notes that after a recent power outage, some open files were corrupted on one affected file server. Which of the following items should the administrator consider to determine the cause of this corruption?()A、The server's memoryB、The server's RAID controller batteryC、The server's processorD、The server's NIC teaming configuration

考题 The system administrator did a new install of AIX on a server about a week ago. The system was not rebooted after the installation. CDE is running on this system as is TCPIP. The system administrator has started configuring the system percompany directives. The power cable was inadvertently disconnected from the wall causing the sever to lose power. Upon reboot, the system appears to hang during log in from the console or from Xterminals. Which of the following is the most probable cause?()A、It is a hardware problem caused by the power failure.B、There is a network problem, most probably with name resolution.C、Sine the system was never rebooted, devices are marked defined instead of available and need to be activated.D、Some filesets may be marked as broken and need to be reinstalled.

考题 Which of the following is MOST likely to occur if the temperature in the server room is cooled too quickly after a power outage?()A、Server forms condensationB、Server will not POSTC、Server’s services will not startD、Server response times are slow due to temperature change

考题 Which of the following information would be on a system classification list?()A、Disk drive sizeB、IP addressC、Acceptable outage timeD、Operating system version

考题 An administrator notes that after a recent power outage, some open files were corrupted on oneaffected file server. Which of the following items should the administrator consider to determine the cause of this corruption?()A、 The servers memoryB、 The servers RAID controller batteryC、 The servers processorD、 The servers NIC teaming configuration

考题 Which of the following tools can be used to identify the location of a network outage?()A、tracerouteB、netstatC、nslookupD、ping

考题 A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored?()A、Identify which systems are the most critical and bring them up by level of importance.B、Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C、Identify the least critical systems and then power those systems on first.D、Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

考题 There is a power outage and all servers are shut down properly by the uninterruptible power supply(UPS) software. When one of the servers starts up it displays a logical drive failed error. This server has two processors,16GB of memory, and a RAID 5 array with 10 drives.  Which of the following is the MOST likely cause?()A、 A failed RAID controllerB、 Two failed processorsC、 Two failed sticks of memoryD、 Two failed drives

考题 Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A、 There is a fire hazard potential if a power outage occurs.B、 The last system plugged into the UPS will not be provided any power.C、 The UPS will draw more power from the circuit to compensate.D、 The runtime of the UPS will be insufficient if a power outage occurs.

考题 A user states that whenever they try to launch a certain installed application, they hear unusual whirring/clicking sounds from their machine and the application never loads. Which of the following components would a technician MOST likely need to replace?()A、Hard Disk DriveB、Optical DriveC、Power Supply UnitD、Case Fan

考题 Following an unscheduled power outage, theadministrator needs to power up an IVM-managed system. For the given system,what is the first step in this process?()A、Physically press the appropriate button on the system.B、Physically disconnect and reconnect the power cable on the system.C、Log into the IVM using a Web Browser, select the managed-system and select the Power on option from the Operations menu.D、Log into the HMC using a Web Browser, select the managed-system and select the Power on option from the Operations menu.

考题 Which of the following is a situation where dual (redundant) HMCs are recommended()? A、When managing more than four VIO servers.B、When installed with Power 570 and larger hardware.C、When hosting both Linux and AIX on the same physical hardware.D、When unexpected outage on a single HMC would prove an untenable risk for the hosted LPARs.

考题 Company.com recently experienced an unanticipated system outage when the VIO server was upgraded. The current p5-570 has six Micro-Partitions and a VIO server partition. How can a similar outage be avoided in the future?()A、Use DLPAR to avoid an outage.B、Deploy a redundant VIO server in the POWER5 system.C、Add additional Host Bus Adapters and Network adapters to the VIO server.D、Implement a standby server and move all partitions to it before applying future updates.

考题 Company.com is ordering a new p5-570 and planning for the option of using Capacity on  Demand to activate additional resources in the future. Which of the following is a prerequisite to support the addition of CPUs or memory without an outage?()A、Use Micro-PartitioningB、Configure a Virtual I/O ServerC、Configure dynamic logical partitionsD、Activate Advanced POWER Virtualization

考题 A recent power outage disrupted customer operations in one of the two campus centers. Thecustomer has already started to develop a strategy for consolidation of the data centers andremote backup at a colocation facility, but current and near-term budgets are focused only oncapacity growth at lowest cost. Which of the following capabilities might be immediately attractiveto the customer?()A、 DS8700 with remote mirroring B、 V7000 with Easy Tier and SSD C、 SVC VDisk mirroring with stretch clusters D、 UPS power backup to the racks with current storage controllers

考题 You need to configure the power settings of your portable computer so that the display turns off when it is inactive and running on battery power. You also need to ensure that the power settings of the hard disk remain unaffected.  What should you do?()A、Change the advanced power settings of the Balanced power plan.B、Configure the portable computer to use the Power saver power plan.C、Configure the portable computer to use the High performance power plan.D、Restore the Power Saver power plan to the default settings.

考题 单选题A data center has had a power outage. Which of the following should the administrator do FIRST once the power is restored? ()A  Identify which systems are the most critical and bring them up by level of importance.B  Retrieve the latest backup tapes for immediate system restore using the GFS rotation.C  Identify the least critical systems and then power those systems on first.D  Determine the cause of the power outage and install UPS systems to prevent its reoccurrence.

考题 单选题Which of the following information would be on a system classification list? ()A  Disk drive sizeB  IP addressC  Acceptable outage timeD  Operating system version

考题 单选题A recent power outage disrupted customer operations in one of the two campus centers. Thecustomer has already started to develop a strategy for consolidation of the data centers andremote backup at a colocation facility, but current and near-term budgets are focused only oncapacity growth at lowest cost. Which of the following capabilities might be immediately attractiveto the customer?()A  DS8700 with remote mirroring B  V7000 with Easy Tier and SSD C  SVC VDisk mirroring with stretch clusters D  UPS power backup to the racks with current storage controllers

考题 多选题Which of the following are attributes of a hardware-based RAID controller?()ABacks up dataBLess expensive than software RAIDCVendor neutral implementationDAccessible through a BIOS interfaceEMore host CPU usage than software RAIDFAccessible through a system utility after the OS has been loadedGMay retain data in the event of a power outage

考题 单选题Which of the following can occur if the maximum rated load is exceeded on an uninterruptible power supply (UPS)?()A There is a fire hazard potential if a power outage occurs.B The last system plugged into the UPS will not be provided any power.C The UPS will draw more power from the circuit to compensate.D The runtime of the UPS will be insufficient if a power outage occurs.

考题 单选题An administrator notes that after a recent power outage, some open files were corrupted on oneaffected file server. Which of the following items should the administrator consider to determine the cause of this corruption?()A  The servers memoryB  The servers RAID controller batteryC  The servers processorD  The servers NIC teaming configuration