网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()

  • A、Disk Magic
  • B、TPC for Data
  • C、CLARiiON Procedure Generator
  • D、System Storage Interoperability Center

参考答案

更多 “ A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble. Which resource should be consulted while developing the solution options?()A、Disk MagicB、TPC for DataC、CLARiiON Procedure GeneratorD、System Storage Interoperability Center” 相关考题
考题 A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A. z/OS, DS8000, TSMB. TSM, LTO-5, VMwareC. System x, VMware, XIVD. System p, VMware, DS5000

考题 A customer has an existing high availability SAN environment with CLARiiON, which has been stable for 16 months. They have recently experienced several outages with their current storage systems. They need to purchase additional storage and have asked about tier 1 storage. They are concerned with connecting their existing storage and servers without trouble.Which resource should be consulted while developing the solution options?()A. Disk MagicB. TPC for DataC. CLARiiON Procedure GeneratorD. System Storage Interoperability Center

考题 A customer with a well-known brand wants to make sure they have a Green decision in their next IT infrastructure investment.   How can IBM Cool Blue help this customer? ()A、Providing tools to plan, monitor, manage, and reduce power consumption.B、Reducing cooling requirements by running CPUs at lower speeds.C、Using smart system design to create high-power servers.D、Adapting existing solutions like the Rear Door eXpander.

考题 A prospective customer has a SCSI installed. The new project requires a large high performance storage and tape network . The customer does not appear to understand the terminology and options of the fiber channel components of the solution. Further discussion confirms that the customers only has cursory knowledge of fiber channel and is not currently prepared to for the installation. What steps should be taken to make sure customer is satisfied with the solution? ()A、Suggest a cloud networkB、Direct the customer to redbooks and white papers on FC technologiesC、Work with business partner to include Lab Service engagement to setup FC environment and perform knowledge transferD、Switch project to iSCSI

考题 An existing IBM customer has some iSeries servers in their environment.  The customer is adding an x366 server with an RSA-II installed for their Microsoft Client/Server applications.  The customer wants to consolidate the storage and centralize the backup of the iSeries and xSeries platforms.  Which of the following will accomplish this?()A、Share the data over the Ethernet LAN.B、Install the IXA Adapter in the iSeries server.C、Install the IXA Adapter in the xSeries server.D、Attach both servers to an IXS switch.

考题 Machine policy templates can be assigned based on certain attributes of a machine. A customer  organizes their machines based on the following requirements:   The machines are all placed in specific Organizational Units in the Active Directory.   The customer has Citrix Servers, and they have a specific naming convention meant only for their Citrix Servers. The customer has DHCP enabled for all the client machines.   The customer has made it clear that they should not need to change anything in the existing infrastructure. Given these requirements, which single assignment attribute would be chosen for assigning machine policy templates?()A、HostnamesB、IP AddressesC、Machine Group TagD、Active Directory Groups

考题 The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A、x3950B、x3850C、x3650D、LS41

考题 A customer has a very large number of physical Windows-based servers and no centralized storage. Which technology solution will help the customer to reduce the footprint of their existing server estate?()A、z/OS, DS8000, TSMB、TSM, LTO-5, VMwareC、System x, VMware, XIVD、System p, VMware, DS5000

考题 A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

考题 A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()A、N7900 B、N6040 C、DS3300 D、DS3500

考题 A mainframe customer has requested a proposal to replace an existing storage system. Which information does Disk Magic provide?()A、logical volume sizesB、cache usage by applicationC、storage processor utilizationD、disk capacity needed forFlashCopy

考题 A retail customer installs a BladeCenter into an existing 10/100 Ethernet network. Due to cost considerations, the customer uses Copper Pass-thru Modules. After installing this solution, the customer finds that they have no network connectivity. Which is causing the problem of the following?()A、Copper Pass-thru Modules only support 1000Mb line speeds.B、Spanning Tree has been enabled on the Copper Pass-thru Module.C、The customer does not have the latest firmware loaded on the Copper Pass-thru Module.D、The customer is using LS21 Blades

考题 单选题The customer requests a proposal for three high-availability 4-socket servers with the capability to connect to their existing DS4000 storage server. The customer will make the decision based on the lowest initial purchase price.  Which of the following IBM System x solutions would be the most competitive?()A x3950B x3850C x3650D LS41

考题 单选题A manufacturing customer has an existing SAN for their AIX servers and they want to add theirWindows servers with file level access to their existing storage pool. Which of the following is thelowest cost solution?()A N7900 B N6040 C DS3300 D DS3500

考题 单选题A customer has an existing SP system and needs to add cards to some of the nodes.  Which of the following applications must be used to configure the upgrade?()A MRPDPlus toolB Inventory ServicesC PCRS6000 Portable ConfiguratorD eConfig - IBM Configurator for e-Business

考题 单选题A customer has an existing rack environment with 18 x365 and 2 x255 servers.  How can the customer monitor and manage the hardware even if the systems are shut down?()A Use PC Anywhere over the Ethernet LAN.B Use RDM and Aurema to manage the systems.C Connect high-speed modems to each of the systems’ serial ports to use IBM Director.D Interconnect the Remote Supervisor Adapters II (RSA II) in the x365 servers to the x255 servers.

考题 单选题A customer SAN environment has undergone significant growth over the past two years. They havealso suffered a high turnover rate with administrative personnel. The customer has asked a storage specialist for help in documenting and understanding their changing SAN environment. The ability to make configuration changes to devices would be a plus.    Which tool should the storage specialist suggest()A VisioB TPC Basic EditionC IBM Tivoli NetViewD Fabric Manager

考题 单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers.  The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server.  How can the specialist help the customer?()A Explain to the customer that they need an additional HMC for the POWER5 system.B Obtain a PO from the customer to purchase additional serial connections to the HMC.C Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.

考题 单选题One of your customers has decided to deploy location-based services in addition to existing wireless services. The customer requires that the additional access points to be deployed in monitor-only mode. The most likely reason for this requirement is that the customer has which of these existing wireless devices?()A 802.11b/g VoIPB Data CollectionC 802.11b and g clientsD RFID tags

考题 单选题What is the primary objective of the plan phase()A Assess the existing environments to determine if it can support the proposed system.B Identify the activities for installing and configuring the equipment at the customer sites.C Gather high-level solution requirements, and understand the customer business needs an the opportunity.D Prepare the activities for day-to-day support, management, and monitoring of the newly implemented system.

考题 单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A Order a POWER5 HMCB Connect to the existing HMCC Install an 8-port asynchronous card in the managed server to connect to the existing HMCD Install an additional network card to the existing HMC and connect to the POWER5 service processor

考题 多选题Your customer wants to build a network for a financial trading floor that has a requirement formultiple high-value transactions, which are also vital to the customer. What are the two mostcritical requirements?() (Choose two.)Ano single point of failureBtrading database server locationCredundant application servers locationDdeterministic response to all failuresEdetermine which protocol to use

考题 单选题One of your customers has decided to deploy location-based services in addition to existing wireless services. the customer requires that the additional access points to be deployed in  monitor-only modE. The most likely reason for this requirement is that the customer has which of these existing wireless devices?()A data collectionB 802.11b/g voipC 802.11b and g clientsD rfid tags

考题 单选题A customer has a requirement for a storage solution that meets the following criteria:       (1)Heterogeneous hosts attached       (2)Support for block I/O       (3)High Speed       (4)Scalable  Which solution would satisfy the customer’s requirement?()A SANB NASC SCSID iSCSI