网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
The last deliverable at the Close Out meeting is:()
A
source code.
B
passwords.
C
lessons learned.
D
test results.
参考答案
参考解析
解析:
暂无解析
更多 “单选题The last deliverable at the Close Out meeting is:()A source code.B passwords.C lessons learned.D test results.” 相关考题
考题
多选题A customer wants to increase the performance of an existing server. They are running a very network intensive application and feel that increasing the bandwidth to the network will fix their problem. They are running two 24-port autosensing 10/100 hubs, tied together with a standard Ethernet crossover cable in port 24. The server is running IPX. After adding a second network card and plugging one card into each hub, they have not seen any performance improvement. Which two are likely reasons why implementing network adapter teaming has not improved performance?()AAdapter teaming is designed to work with switches.BAdapter teaming only functions with gigabit network cards.CAdapter teaming only provides fault tolerance, not additional bandwidth.DAdapter teaming only works with IPX when using switches and network cards with special features that support teaming.
考题
单选题Who is responsible for authorizing closure of the project?()A
Project ManagerB
StakeholderC
CustomerD
Executive Sponsor
考题
单选题If the organizational spending plan has allocated $100,000 for a project, and the high level budget estimate for that project is $200,000; which of the following is accurate?()A
The high level budget estimates are inaccurateB
The organizational spending plan is inaccurateC
The budget is not aligned with the spending plan of the organizationD
The detailed bottom up budget will need to be adjusted
考题
单选题Which action increases server availability?()A
configuring a second network card with a different IP addressB
replacing the existing 100 Mbps NIC with a gigabit Ethernet NICC
using adapter teaming and configuring the second network card with the same IP address as the first network cardD
installing a dual-port network card that can handle the future growth and setting one NIC to 10 Mbps and one NIC to 100 Mbps
考题
单选题Click the Exhibit button. From a local machine, connectivity with a server named server1.comptia.org is checked. It cannot be reached, but it can be accessed via the IP address. Which of the following is the MOST common cause of this error?()A
The server is down.B
The DNS server is down.C
The local DNS cache is full.D
The local DNS client is stopped.E
The local DNS cache is corrupted.
考题
单选题A technician needs to install the first SCSI controller in an application server. The SCSI card is factory-configured with a SCSI ID of 1. Which SCSI ID should the technician configure the card before installation?()A
0B
1C
4D
7
考题
单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A
Historical informationB
Use of outside vendorsC
Change control processesD
Human resource skill level requirements
考题
单选题Within Information Technology projects, communications between the project manager and the project team members should take place:()A
by written and oral communication.B
via a weekly status report.C
through the formal chain of command.D
with approved template forms.
热门标签
最新试卷