单选题
What’s the strongest differentiator between 2U servers offered by IBM, HP, and Dell?()
A

DIMM slots

B

hot swappable fans

C

hot swappable hard drives

D

none of the above


参考答案

参考解析
解析: 暂无解析
更多 “单选题What’s the strongest differentiator between 2U servers offered by IBM, HP, and Dell?()A DIMM slotsB hot swappable fansC hot swappable hard drivesD none of the above” 相关考题
考题 同反复无常的人没法相处。It’s hard to get along with a man blowing hot and cold.() 此题为判断题(对,错)。

考题 After installing a new hard drive into a server for the purpose of mirroring the data from the first drive to the second one, the server displays an “operating system not found” error. Which of the following should the technician do to boot the server from the original drive?()A、Replace the second drive with a hot swappable one.B、Swap the drive boot order in the BIOSC、Make the second disk active under the disk management tool.D、Rebuild the array using the hardware RAID tool at boot.

考题 Which of the following can be hot-swappable?()A、Hard driveB、Tape driveC、Floppy driveD、DVD-RW

考题 An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. The administrator powers up the server, during POST the RAID controller is recognized but none of the drive lights flash. Which of the following should the administrator do FIRST to troubleshoot the problem?()A、Check the backplane cabling.B、Check the server BIOS.C、Update the RAID controller firmware.D、Install the latest hard drive firmware

考题 While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module.  Which of the following is the most appropriate response?()A、The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.B、The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.C、The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.D、The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.

考题 Which of the following Blade servers offer hot swap internal hard drives?()A、HS21B、HS22C、HS22VD、HX5

考题 Which of the following is an example of a hot swappable component on a laptop?()A、Internal wireless adapterB、CPUC、PCMCIA cardD、RAM

考题 While discussing the specifications of replacement servers, the administrator’s manager asks what can be done to avoid the down time associated with failed hard drives on the servers.  Which of the following should the administrator recommend?()A、Mirror all disks to avoid replacementB、Purchase servers with hot swappable drives configured in a RAIDC、Purchase servers with duplicate drives configured as RAID 0D、Perform timely backups

考题 Which of the following are storage technologies that can be hot swappable?()A、SCSIB、SASC、ATAD、IDEE、CMOS

考题 A user states that they unplugged their mouse to clean the roller ball, but after plugging it back in the mouse no longer functions. Which of the following is the MOST likely cause of this issue?()A、The mouse has a PS/2 connector which is not hot-swappable.B、The mouse roller ball is now too smooth to gain traction.C、The mouse was broken before the user unplugged to clean it.D、The mouse has a USB connector that is not getting enough power.

考题 A Dell customer decided to use IBM Director and xSeries to manage their servers.  They purchased 10 IBM x336 servers and they already have 75 various Dell servers.  Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()A、Verify that the Dell systems have TCP/IP enabledB、Verify that the systems are running the IBM Director AgentC、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliantD、Verify that the Dell systems have at least a 1GB of memory installedE、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers

考题 One of your best customers has limited funding and is interested in the ability to increase a system’s computing power as needed.  Which of the following System x server attributes should the Sales Specialist promote?()A、Ability to hot-plug additional processors on demandB、Low cost of System x servers makes scaling out an optionC、"Pay as you Grow" scalability of the IBM System x3950 serverD、Integration of System x servers with the existing servers using an interconnect

考题 What’s the strongest differentiator between 2U servers offered by IBM, HP, and Dell?()A、DIMM slotsB、hot swappable fansC、hot swappable hard drivesD、none of the above

考题 When selling against competition, which of the following focus on the iDataPlex value proposition?()A、Large selection of proven applications B、Standard rack mounting C、Flexible configurations ready for integration and testing at the customers data center D、Easy maintenance through individual hot-swappable nodes

考题 单选题While discussing the specifications of replacement servers, the administrator’s manager asks what can be done to avoid the down time associated with failed hard drives on the servers.  Which of the following should the administrator recommend?()A Mirror all disks to avoid replacementB Purchase servers with hot swappable drives configured in a RAIDC Purchase servers with duplicate drives configured as RAID 0D Perform timely backups

考题 单选题What’s the strongest differentiator between 2U servers offered by IBM, HP, and Dell?()A DIMM slotsB hot swappable fansC hot swappable hard drivesD none of the above

考题 多选题Which of the following are storage technologies that can be hot swappable?()ASCSIBSASCATADIDEECMOS

考题 单选题Which of the following Blade servers offer hot swap internal hard drives?()A HS21B HS22C HS22VD HX5

考题 单选题When selling against competition, which of the following focus on the iDataPlex value proposition?()A Large selection of proven applications B Standard rack mounting C Flexible configurations ready for integration and testing at the customers data center D Easy maintenance through individual hot-swappable nodes

考题 单选题An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. The administrator powers up the server, during POST the RAID controller is recognized but none of the drive lights flash. Which of the following should the administrator do FIRST to troubleshoot the problem?()A Check the backplane cabling.B Check the server BIOS.C Update the RAID controller firmware.D Install the latest hard drive firmware

考题 单选题After installing a new hard drive into a server for the purpose of mirroring the data from the first drive to the second one, the server displays an “operating system not found” error. Which of the following should the technician do to boot the server from the original drive?()A Replace the second drive with a hot swappable one.B Swap the drive boot order in the BIOSC Make the second disk active under the disk management tool.D Rebuild the array using the hardware RAID tool at boot.

考题 单选题A user states that they unplugged their mouse to clean the roller ball, but after plugging it back in the mouse no longer functions. Which of the following is the MOST likely cause of this issue?()A The mouse has a PS/2 connector which is not hot-swappable.B The mouse roller ball is now too smooth to gain traction.C The mouse was broken before the user unplugged to clean it.D The mouse has a USB connector that is not getting enough power.

考题 单选题Which of the following is an example of a hot swappable component on a laptop?()A Internal wireless adapterB CPUC PCMCIA cardD RAM

考题 单选题One of your best customers has limited funding and is interested in the ability to increase a system’s computing power as needed.  Which of the following System x server attributes should the Sales Specialist promote?()A Ability to hot-plug additional processors on demandB Low cost of System x servers makes scaling out an optionC Pay as you Grow scalability of the IBM System x3950 serverD Integration of System x servers with the existing servers using an interconnect

考题 单选题A customer has received a quotation from Dell for Intel-based 1U servers.  What is the first step in submitting your quotation? ()A Try to sell IBM X-Architecture technology to the customer and explain its benefits.B Take the customer to the Dell Web site for determining a similar server configuration.C Submit a special bid to receive additional discount on 1U servers.D Design a comparable solution while highlighting IBM advantages.

考题 单选题Which of the following can be hot-swappable?()A Hard driveB Tape driveC Floppy driveD DVD-RW

考题 单选题An administrator has just upgraded a server from non-hot plug storage to all hot plug storage. Theadministrator powers up the server, during POST the RAID controller is recognized but none of the drivelights flash.  Which of the following should the administrator do FIRST to trouble shoot the problem?()A  Check the backplane cabling.B  Check the server BIOS.C  Update the RAID controller firmware.D  Install the latest hard drive firmware.

考题 单选题While explaining to a customer the fault tolerant benefits of x445 they ask what happens if they implement memory mirroring and a DIMM fails in the SMP expansion module.  Which of the following is the most appropriate response?()A The DIMM is taken off line, and fault tolerance is available on the other DIMMs only.B The memory bank is taken offline and rebuilt with the online hot spare and then brought back on line.C The memory bank containing the failed DIMM is taken off line, and the system is no longer fault tolerant until replaced.D The DIMM is taken offline, and the online hot spare is initiated and the system remains fault tolerant.