网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
A banking customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (http) is being blocked, denying any http access to the AMM. Which of the following would facilitate remote communication with the AMM using a GUI interface?()
A

port 443 - SSL connection 

B

port 8080 ?http 

C

port 22 - SSH CLI 

D

port 427 - SLP connection


参考答案

参考解析
解析: 暂无解析
更多 “单选题A banking customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (http) is being blocked, denying any http access to the AMM. Which of the following would facilitate remote communication with the AMM using a GUI interface?()A port 443 - SSL connection B port 8080 ?http C port 22 - SSH CLI D port 427 - SLP connection” 相关考题
考题 Your company has computers in multiple locations that use IPv4 and IPv6. Each location is protected by a firewall that performs symmetric NAT. You need to allow peer-to-peer communication between all locations.What should you do?()A. Configure dynamic NAT on the firewall.B. Configure the firewall to allow the use of Teredo.C. Configure a link local IPv6 address for the internal interface of the firewall.D. Configure a global IPv6 address for the external interface of the firewall.

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A. operator trainingB. cache size of the two clustersC. fibre bandwidth capability between the sitesD. number of stacked tape drives attached to each cluster

考题 A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?() A.0B.1C.2D.4

考题 Refer to the exhibit. Which two of these are characteristics of a firewall running in transparent mode?() A. FWSM routes traffic between the VLANs.B. FWSM switches traffic between the VLANs.C. Transparent mode is often called bump-in-the-wire mode.D. Transparent mode firewall deployments are used most often in current designs.E. Traffic routed between VLANs is subject to state tracking and other firewall configurable options.

考题 Which three statements about firewall modes are correct? ()A、 A firewall in routed mode has one IP addressB、 A firewall in transparent mode has one IP addressC、 In routed mode, the firewall is considered to be a Layer 2 dewD、 In routed mode, the firewall is considered to be a Layer 3 deviceE、 In transparent mode, the firewall is considered to be a Layer 2 deviceF、 In transparent mode, the firewall is considered to be a Layer 3 device

考题 A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A、0B、1C、2D、4

考题 A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A、Did you add the redundant AMM?B、What is the processor wattage?C、Is the AMM firmware up to date?D、Is the HS22V memory configuration optimized?

考题 ()is software about the relation between the customer and the supplier in marketing.A、Customer Relationship ManagementB、Customer serviceC、Sales planningD、Distribution channel

考题 A customer has two single cluster IBM TS7700 Virtualization Engines at the same site. The customer wants to move one to a remote site and set up a grid configuration with the two clusters. The customer has fibre between the two sites. What is the most important factor to consider when planning the new configuration?()A、operator trainingB、cache size of the two clustersC、fibre bandwidth capability between the sitesD、number of stacked tape drives attached to each cluster

考题 ()is software about the relation between the customer the customer and the supplier in marketingA、Customer Relationship Management (CRM)B、Customer serviceC、Sales planningD、Distribution channel

考题 A customer states that it takes a while to refresh their display when multitasking and switching between windows, in Windows XP. Which of the following is the BEST way to shorten the delay and increase response time?()A、Tell the user to use Safe Mode.B、Disable the Windows Firewall Service.C、Turn off the System Restore.D、Change to Performance Mode.

考题 A customer has two sites located 500 kilometers apart. The customer has both a high-speedInternet link and dark fiber between the sites. The customer wants to utilize storage resources ateither site leveraging replication for disaster recovery implementations. The customer wants to linkthese two sites together. Which option provides the highest performance and is most reliable?()A、iFCP routerB、FCIP routerC、DWDM and CWDMD、LC multi-mode 50 micron fiber

考题 A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A、A DCE domainB、A Kerberos domainC、A PPP tunnel between the serversD、An IPSEC tunnel between the servers

考题 A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()A、The application server,firewall,and database server on the same VLANB、The application server and firewall on one VLAN,and the database server on a second VLANC、The application server on one VLAN,and the database server and firewall on a second VLAND、The application server and firewall on one VLAN,and the firewall and database server on a second VLAN

考题 our company has computers in multiple locations that use IPv4 and IPv6. Each location is protected by a firewall that performs symmetric NAT. You need to allow peer-to-peer communication between all locations. What should you do?()A、configure dynamic NAT on the firewall.B、configure the firewall to allow the use of teredo.C、Configure a link local IPv6 address for the internal interface of the firewall.D、Configure a global IPv6 address for the external interface of the firewall.

考题 Your company has computers in multiple locations that use IPv4 and IPv6. Each location is protected by a firewall that performs symmetric NAT. You need to allow peer-to-peer communication between all locations. What should you do? ()A、Configure dynamic NAT on the firewallB、Configure the firewall to allow the use of TeredoC、Configure a link local IPv6 address for the internal interface of the firewallD、Configure a global IPv6 address for the external interface of the firewall

考题 单选题A customer recently purchased an HS22 Blade to install into their existing BCH chassis. The customer installed the blade and it was not recognized. Which ofthe following is the first question for this customer?()A Did you add the redundant AMM?B What is the processor wattage?C Is the AMM firmware up to date?D Is the HS22V memory configuration optimized?

考题 单选题A customer has two separate storage networks and is planning to implement an SVC to provide for FlashCopy between the two networks. What is the minimum number of ISL ports required?()A 0B 1C 2D 4

考题 单选题A customer has a BladeCenter H chassis with a single AMM.  The AMM is defective. Which of the following is the method to backup the existing AMM so the new AMM automaticlally picks up the configuration? ()A Back up the AMM configuration to a file B Back up the AMM configuration to the chassis C Back up the AMM using IBM Systems Director D Back up the AMM using Tivoli Storage Manager

考题 单选题A banking customer has a firewall between their AMM and the remote console which is used to configure the chassis and blades. Due to security concerns, port 80 (http) is being blocked, denying any http access to the AMM. Which of the following would facilitate remote communication with the AMM using a GUI interface?()A port 443 - SSL connection B port 8080 ?http C port 22 - SSH CLI D port 427 - SLP connection

考题 单选题A University customer has a BladeCenter H fully populated with LS21 Blades, a single AMM, and four power modules. The BladeCenter has been running flawlessly for three months. One day an administrator discovers that they cannot view video on blades 9-12 either locally or remotely even though they still appear to be running. The video works on all of the other blades. Which of the following is the cause of the video problem?()A A power module has failed and there is not enough power to see video on all blades.B MUX 3 on theBladeCenter backplane has failed.C A firmware update is required on the AMM.D A second AMM is required to view video on blades 9-14.

考题 单选题A manufacturing customer has an IBM BladeCenter H chassis with four, HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration:  (1)two Brocade 20-Port SAN Switch Modules  (2)two Nortel Networks 1/10 GB Uplink ESM  (3)a redundant AMM  What is the minimum number of power supplies needed for this configuration to have full redundancy?()A 4B 3C 2D 8

考题 多选题Which three statements about firewall modes are correct? ()AA firewall in routed mode has one IP addressBA firewall in transparent mode has one IP addressCIn routed mode, the firewall is considered to be a Layer 2 dewDIn routed mode, the firewall is considered to be a Layer 3 deviceEIn transparent mode, the firewall is considered to be a Layer 2 deviceFIn transparent mode, the firewall is considered to be a Layer 3 device

考题 单选题A customer has two locations that host their pSeries servers.  Traffic is being routed through the public Internet.  The customer needs to exchange confidential financial data between the servers.  Which of the following solutions should the pSeries technical specialist propose to the customer to secure the data?()A A DCE domainB A Kerberos domainC A PPP tunnel between the serversD An IPSEC tunnel between the servers

考题 单选题A banking customer has two Ethernet Switch Modules installed in an IBM BCE chassis. The modules were configured identically. The Ethernet module in bay 1 was accidentally reset to factory defaults. Which solution returns the module to the customer-specific configuration? ()A Restore the configuration from NVRAM using the Switch Module Web interface B Back up the configuration of the Ethernet module in bay 1 and restore it to the Ethernet module in bay 2 using the AMM C Swap the modules, which will automatically resynch the settings stored in the Advanced Management Module D Back up the configuration from Ethernet module in bay 2 and restore it to the module in Bay 1 using the switch CLI or Web interface

考题 单选题The customer would like to replicate their data from site A to site B. This distance is approximately325 meters between the sites. The customer has a DS5000 with 6 DS EXP5000 expansionshelves that hold approximately 40 TB of data. Which method of replication would be supported?()A HACMP-XDB SnapMirrorC SyncMirrorD Enhanced Remote Mirroring

考题 单选题A user has an application server LPAR with a physical Ethernet adapter. They want to have a database LPAR also connected to the application LPAR via virtual Ethernet. Their security policies require a firewall between the application LPAR and database LPAR. Which of the following virtual Ethernet configurations satisfies the customer’s requirements?()A The application server,firewall,and database server on the same VLANB The application server and firewall on one VLAN,and the database server on a second VLANC The application server on one VLAN,and the database server and firewall on a second VLAND The application server and firewall on one VLAN,and the firewall and database server on a second VLAN

考题 单选题MRK Consulting Ltd has been operating in the global market since 1988. We have successfully placed hundreds of IT Banking professionals in leading companies in the Finance, Banking and IT industries.A MRK is a leading company in Finance and IT Industries.B There are many IT and Banking talents working with MRK.C MRK has helped many people found good jobs.