A ()can give power to hoist or lower cargo.
A
cargo winch
B
lift winch
C
derrick
D
crane
参考答案
参考解析
解析:
暂无解析
更多 “单选题A ()can give power to hoist or lower cargo.A cargo winchB lift winchC derrickD crane” 相关考题
考题
Before lift up the patient with hoist, make sure . ()
A. the hoist and sling are in good conditionB. give explanation to the patientC. practice the equipment before liftingD. choose the right size for the patient
考题
Which statement is FALSE regarding the operation of a crane ________.A.The crane jib is raised and lowered by the luffing winchB.The cargo block is raised and lowered by the hoisting winchC.The cargo block is raised and lowered by the luffing winchD.None of the above
考题
If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur ________.A.A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB.An electromagnetic brake will hold the load where it is suspendedC.The load will fall rapidly to the deck unless the foot brake is engagedD.The load will slowly lower to the deck under control of the drag of the winch motor
考题
The jumbo boom can ().A、lift heavy cargoB、load and unloadC、join ropes togetherD、lift light cargo
考题
The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A、重吊杆吊重货和集装箱货。B、龙门吊能起吊重件货,重吊杆能起吊集装箱。C、重吊杆能起吊重件货,龙门吊能起吊集装箱。D、龙门吊吊重货和集装箱货。
考题
The ()(浮吊) can float on water used to load and unload the cargo.A、floating craneB、jumbo boomC、union purchaseD、crane
考题
单选题Stress on the topping lift of a swinging boom can be reduced by().A
rigging a back stayB
raising the boomC
increasing the mechanical advantage of the cargo purchaseD
taking all slack out of the preventer
考题
单选题The jumbo boom can lift heavy cargo, the gantry crane can hoist containers.()A
重吊杆吊重货和集装箱货。B
龙门吊能起吊重件货,重吊杆能起吊集装箱。C
重吊杆能起吊重件货,龙门吊能起吊集装箱。D
龙门吊吊重货和集装箱货。
考题
单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()A
The discharge is slow due to the size of the cargo and all the cranes working togetherB
The cargo discharge can be accomplished with controlled pendulationC
The cargo discharge can be performed in port or at anchorD
The cranes enable the handling of heavy cargos without shoreside assistance
考题
单选题In a general cargo crane, () is fitted to raise or lower the jib.A
the slewing motorB
the luffing motorC
the hoisting motorD
none of the above
考题
单选题The ()(重吊杆) can lift heavy cargo.A
heavy cargo derrickB
heavy deckC
jumbo boomD
heavy block
考题
单选题It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.A
possibleB
impossibleC
properD
improper
考题
单选题In a general cargo crane, () is fitted to lift the cargo load.A
the slewing motorB
the luffing motorC
the hoisting motorD
none of the above
考题
单选题If an electric cargo winch is being used to lift a draft of cargo and the engine room loses all power,which will occur?()A
A pawl,forced by a spring mechanism,will engage the teeth of the bull gear and hold the loadB
An electromagnetic brake will hold the load where it is suspendedC
The load will fall rapidly to the deck unless the foot brake is engagedD
The load will slowly lower to the deck under control of the drag of the winch motor