网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
In order to raise the efficiency of the water supply, measures should be taken to _____.
A
centralize the management of water resources
B
increase the sense of responsibility of agencies at all levels
C
guarantee full protection of the environment
D
encourage local and regional control of water resources
参考答案
参考解析
解析:
推断题。本题询问提高供水效率的方式。文章最后说,国家建立中心权力机构来协调关于水的方针政策,与A项的“水资源的集中管理”是一致的,故A为答案。
推断题。本题询问提高供水效率的方式。文章最后说,国家建立中心权力机构来协调关于水的方针政策,与A项的“水资源的集中管理”是一致的,故A为答案。
更多 “单选题In order to raise the efficiency of the water supply, measures should be taken to _____.A centralize the management of water resourcesB increase the sense of responsibility of agencies at all levelsC guarantee full protection of the environmentD encourage local and regional control of water resources” 相关考题
考题
The text is mainly about .A.water supply and increasing populationB.water use management and agricultureC.water redistribution and wildlife protectionD.water shornages and environmental protection.
考题
One of the reasons that causes oil flowed from sludge outlet of a self-cleaning purifier isA.seal water supply be cut offB.make-up water supply be cut offC.oil outlet valve closed or not open sufficientlyD.the flow rate of oil is too much
考题
The Dixie PIT program was introduced in order to_ _.A.raise money for school affairsB.do some research on nutritionC.develop students' practical skillsD.supply teachers with drinks
考题
The blowers of an inert gas generation system aboard a tanker,will be automatically secured if ______.A.Normal water supply at the water seal is lostB.The temperature of the inert gas being delivered to the cargo tanks is more than 150℉C.The cooling water supply to the scrubbers is lostD.All of the above
考题
Supply chain management consists of firms collaborating to leverage strategic positioning and to improve operating efficiency.
考题
单选题If separating effect is not good, which measure should be taken ()A
working at intervals and properly heatingB
warming up to 70℃, increase water supply flowC
improving impulse of water supplyD
reducing water supply flow
考题
单选题When distilling sea water the cooling water discharging from the distiller is fed back to evaporator as feed water ().A
to decrease scale formationB
for better cooling effectC
for more economical purposeD
to raise vacuum
考题
单选题A water pump can not supply water after startingIt may be caused by ().A
closed discharge valveB
broken pipe lineC
worn shaftD
both A and B
考题
单选题Increased air () will raise scavenge efficiency and allow a greater mass of air to be compressed; more fuel may now be burned giving an increased power.A
specific volumeB
densityC
viscosityD
calorific value
考题
单选题When distilling salt water the cooling water discharging from the distiller is fed back to evaporator as feed water ().A
to cut down the amount of cooling water neededB
to prevent an excess amount of cooling water from being discharged to the bilgesC
to supply hot water to the evaporator for more economical operationD
None of the above is tree
考题
单选题The fuel from the bunker tanks must be treated by before entering the service tanks(), from where the fuel enters()A
centrifugal separators; the engine cylinderB
oily water separators; the engine cylinderC
oily water separators; the fuel supply systemD
centrifuges; the fuel supply system
考题
单选题An oil water monitor is required in order to measure ().A
the oil content in waterB
the water content in fuel oilC
the water level in bilge wellD
the oil level in bilge well
考题
单选题One of the reasons that cause oil flowed from sludge outlet of a self-cleaning separator is()A
seal water supply be cut offB
make up water supply be cut offC
oil outlet valve closed or not open sufficientlyD
the flow rate of oily water is too much
考题
单选题One of the reasons that causes oil flowed from sludge outlet of a self-cleaning purifier is ()A
seal water supply be cut offB
make-up water supply be cut offC
oil outlet valve closed or not open sufficientlyD
the flow rate of oil is too much
考题
判断题Supply chain management consists of firms collaborating to leverage strategic positioning and to improve operating efficiency.A
对B
错
考题
单选题If separating effect is not good, we can improve it by ()A
flushing separator with hot waterB
increasing water supply flowC
heat oily water properlyD
opening manual oil discharge value
考题
单选题The blowers of an inert gas generation system aboard a tanker,will be automatically secured if().A
normal water supply at the water seal is lostB
the temperature of the inert gas being delivered to the cargo tanks is more than 150°FC
the cooling water supply to the scrubbers is lostD
all of the above
热门标签
最新试卷