网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()
A

Enable using active partition properties with DLPAR

B

Enter the activation key via the AIX 6.1 command line and reboot AIX

C

Enter the activation key via the HMC,power cycle the managed system and start the LPAR

D

Enter the activation key via the HMC,modify the partition profile and restart the LPAR


参考答案

参考解析
解析: 暂无解析
更多 “单选题After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()A Enable using active partition properties with DLPARB Enter the activation key via the AIX 6.1 command line and reboot AIXC Enter the activation key via the HMC,power cycle the managed system and start the LPARD Enter the activation key via the HMC,modify the partition profile and restart the LPAR” 相关考题
考题 What is the three main step of using the QoS feature with MQC command line interface?

考题 Simultaneous Multithreading (SMT) is enabled in a POWER6 VIO client running AIX 6.1.  Which command would be used to disable it after the next operating system reboot is performed?()A、 schedo -o smt=0 -pB、 smtctl -m off -w bootC、 chdev -l sys0 -a smt=offD、 echo 0  /proc/sys/smt_enable

考题 What tasks can only be performed in the default or admin VDC?()A、 EPLD upgrade, IOS ISSU, FCoE feature enablement, CoPP configuration, and rolling back a checkpointB、 EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and ACL capture enablementC、 EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration and SNMP configurationD、 EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and write erase

考题 The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()A、Run amepat now on all of the existing LPARs.B、Run amepat after consolidation on all LPARs.C、Run amepat now on all existing LPARs running on the POWER6 servers.D、Run amepat now on all existing LPARs running database applications.

考题 What operating system is required to support Active Memory Expansion?()A、AIX 6.1B、AIX 5.3C、Red Hat 10D、SUSE LINUX 11

考题 In order for DLPAR operations to be possible, the RMC daemons on the Hardware Management Console (HMC) must communicate with the RMC daemons on all of the LPARs involved. How can the RMC daemons be restarted on the HMC, causing the least disruption?()A、Run "/usr/sbin/rsct/bin/rmcctrl z" as hscroot. B、Reboot the HMC, either through the GUI or via the command line. C、Disable and re-enable RMC in the Firewall settings in the HMC GUI. D、Select the "Partition Communication" checkbox in the LAN Adapter dialogue box.

考题 On the wlse,which of the following tasks must be completed before interference detection can be enabled?()A、enable self-healing.B、configure location manager.C、conduct client walkabout.D、conduct radio scan.

考题 A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()A、Create a VIO serverB、Modify the LPAR profiles to add a Virtual Ethernet adapterC、Buy the Advanced Power Virtualization feature and enter a authorization code at the HMCD、Buy the Advanced Power Virtualization feature and enter a authorization code at the service processor menu

考题 After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()A、Enable using active partition properties with DLPARB、Enter the activation key via the AIX 6.1 command line and reboot AIXC、Enter the activation key via the HMC,power cycle the managed system and start the LPARD、Enter the activation key via the HMC,modify the partition profile and restart the LPAR

考题 A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%. Which of the following supports this requirement?()A、Active Memory ServerB、Active Memory SharingC、Active Memory PoolingD、Active Memory Expansion

考题 A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs.  During month-end processing one partition becomes memory constrained.      What can help overcome this situation?()A、Active Memory Sharing (AMS)B、Active Memory Expansion (AME)C、Integrated Virtual Memory (IVM)D、Memory Capacity on Demand (CoD)

考题 What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX6.1()? A、128 MBB、256 MBC、512 MBD、1024 MB

考题 Which of the following uses compression/decompression to increase the memory available for client workloads?()A、PowerVMB、VMControlC、Active Memory SharingD、Active Memory Expansion

考题 A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A、In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B、In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C、In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D、In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

考题 Simultaneous Multithreading (SMT) is enabled in a POWER6 VIO client running AIX 6.1. Which command would be used to disable it after the next operating system reboot is performed? itcert()A、 schedo -o smt=0 -p B、 smtctl -m off -w boot C、 chdev -l sys0 -a smt=off D、 echo 0  /proc/sys/smt_enable

考题 A server has been having a memory problem. What feature can be used to determine the failing memory module?()A、Reboot the serverB、RSA IIC、LightPath DiagnosticsD、ServerGuide

考题 单选题What operating system is required to support Active Memory Expansion?()A AIX 6.1B AIX 5.3C Red Hat 10D SUSE LINUX 11

考题 单选题Companycom has a 16 way 1.65 GHz p5 590 and wants to install a i5/OS partition on their server. The customer wants to keep installation costs to a minimum by sharing devices between all LPARs. Before the operating system can be installed in this partition, the customer was told that there are certain limitations that must be observed. What are these limitations?()A When the i5/OS partition is housed in the p5 590, the HMC allows seamless installation in a partition as long as the minimum one processor, 256 MB of memory, one Ethernet and one boot adapter/disk is available from internal hardware. B V5R3 and later releases of i5/OS can be installed on a POWER5 server partition. Only one processor can be assigned to the i5/OS. A special expansion tower must be ordered. This expansion tower and its devices can be shared with other OS partitions. C When the i5/OS partition is housed in the p5 590, the 5250 Twinaxial console must be used to set up the partition. Only one processor can be assigned to the i5/OS partition. A special expansion tower must be ordered to house the IOPs. Devices in the special expansion tower can be shared with other Linux partitions.  D V5R3 and later releases of i5/OS can be installed on IBM eServer p5 servers. i5/OS can run on two processors in the p5 590. A special expansion tower must be ordered. This expansion tower and its devices cannot be shared with other OS partitions. The iSeries expansion towers are seen by the IBM eServer p5 server as an I/O subsystem.

考题 单选题A p5 570 customer is currently running AIX 5.3. The customer now wants to add Virtual Ethernet to two of the LPARs. This will enable the application tier can communicate to the database tier without using an external Ethernet card. What is the best way to accomplish this task?()A Create a VIO serverB Modify the LPAR profiles to add a Virtual Ethernet adapterC Buy the Advanced Power Virtualization feature and enter a authorization code at the HMCD Buy the Advanced Power Virtualization feature and enter a authorization code at the service processor menu

考题 单选题An administrator finds a phone line but does not know where the line goes or if it is active. Whichof the following can be used to test if it is active?()A Butt setB Punch down toolC Cable testeD Cable stripper

考题 单选题What tasks can only be performed in the default or admin VDC?()A  EPLD upgrade, IOS ISSU, FCoE feature enablement, CoPP configuration, and rolling back a checkpointB  EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and ACL capture enablementC  EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration and SNMP configurationD  EPLD upgrade, Cisco IOS ISSU, FCoE feature enablement, CoPP configuration, and write erase

考题 单选题Simultaneous Multithreading (SMT) is enabled in a POWER6 VIO client running AIX 6.1. Which command would be used to disable it after the next operating system reboot is performed? itcert()A  schedo -o smt=0 -p B  smtctl -m off -w boot C  chdev -l sys0 -a smt=off D  echo 0  /proc/sys/smt_enable

考题 单选题After purchasing the Active Memory Expansion (AME) Enablement Feature,what tasks must be completed before AME can be used?()A Enable using active partition properties with DLPARB Enter the activation key via the AIX 6.1 command line and reboot AIXC Enter the activation key via the HMC,power cycle the managed system and start the LPARD Enter the activation key via the HMC,modify the partition profile and restart the LPAR

考题 单选题Simultaneous Multithreading (SMT) is enabled in a POWER6 VIO client running AIX 6.1.  Which command would be used to disable it after the next operating system reboot is performed?()A  schedo -o smt=0 -pB  smtctl -m off -w bootC  chdev -l sys0 -a smt=offD  echo 0  /proc/sys/smt_enable

考题 单选题A POWER6 595 LPAR has two dedicated processors. The LPAR is active and running AIX 6.1. What must be done to donate any unusedprocessing capacity to the shared processor pool?()A In the HMC Properties, select the options to allow processor sharing when the partition is inactive and active.B In the LPAR Properties, select the options to allow processor sharing when the partition is inactive and active.C In the LPAR Profile Properties, select the options to allow processor sharing when the partition is inactive and active.D In the 595 Managed System Properties, select the options to allow processor sharing when partitions are inactive and active.

考题 单选题What is the minimum amount of memory required for a new LPAR to be built via NIM on AIX 6.1?()A 128MB 256MC 512MD 1024M

考题 单选题A Power 720 has AIX 6.1 and Linux partitions.During normal workloads there is more than enough memory available to the LPARs.  During month-end processing one partition becomes memory constrained.      What can help overcome this situation?()A Active Memory Sharing (AMS)B Active Memory Expansion (AME)C Integrated Virtual Memory (IVM)D Memory Capacity on Demand (CoD)

考题 单选题The systems administrator of a large manufacturer has POWER5 and POWER6 servers, each with LPARs running AIX 6.1.  They are running several workloads including SAP, DNS, Oracle, DB2 and WebSphere Application Server, and plan to consolidate onto one POWER7 server.   How can the system administrator determine how much benefit Active Memory Expansion (AME) could provide for the consolidated system?()A Run amepat now on all of the existing LPARs.B Run amepat after consolidation on all LPARs.C Run amepat now on all existing LPARs running on the POWER6 servers.D Run amepat now on all existing LPARs running database applications.