A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()
A
The memory is not seated correctly.
B
The network card is not configured correctly.
C
The server does not support 1024 MB of memory.
D
Master SDRAM ECC needs to be enabled in the CMOS.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()A The memory is not seated correctly.B The network card is not configured correctly.C The server does not support 1024 MB of memory.D Master SDRAM ECC needs to be enabled in the CMOS.” 相关考题
考题
单选题Team selection is not just a function of finding someone whos a technical or administrative expert. What will a project sponsor leading a high visibility project look for in a project manager?()A
Developing key personnelB
Leading technical specialistsC
Interfacing with customers / sponsorsD
Analyzing skills
考题
单选题Which factor has the greatest impact on the estimated per unit labor cost for a project?()A
Historical informationB
Use of outside vendorsC
Change control processesD
Human resource skill level requirements
考题
单选题A large corporation is concerned about the amount of time it takes to back up their main file server. They are also concerned that their IT technician frequently forgets to change the backup tapes, thereby leaving the company open to data loss. Which backup system would solve both problems?()A
RAIDB
tape libraryC
optical storageD
disk to disk to tape
考题
单选题Team member listing, scheduled tasks, and risk identification are part of the:()A
project plan.B
project charter.C
communication plan.D
WBS (Work Breakdown Structure).
考题
单选题Which type of server is responsible for resolving NetBIOS names?()A
mail serverB
DNS serverC
web serverD
WINS serverE
DHCP server
考题
单选题Which is the MOST effective method for generating support for your project plan?()A
Requiring stakeholders to sign-off on project plan componentsB
Requesting input from all stakeholders during the planning processC
Providing an open line of communication regarding the projectD
Clearly illustrating how the project relates to the company’s objectives
考题
单选题Which backup solution is the MOST appropriate for backing up a payload from a corporation with multiple servers and approximately 300 GB of data?()A
multiple AIT (Advanced Intelligent Tape) drives configured for each serverB
a standalone LTO (Linear Tape-Open) drive configured for all serversC
standalone DAT (Digital Audio Tape) drives configured for each serverD
a tape library unit with more then one DAT (Digital Audio Tape) drive configured for all serversE
a tape library unit with more the one SDLT (SuperDLT) drive configured for all servers
考题
单选题A company plans to upgrade a network server. Before proceeding with the upgrade, the HCL (Hardware Compatibility List) and hardware is checked and necessary backups and documentation are made. The existing 512 MB of SDRAM is replaced with 1024 MB. The 10 Mbps network card is replaced with a 10/100 PCI network card. When the server restarts, beeps sound and the server does not pass the POST. Which of the following is the MOST likely cause of the problem?()A
The memory is not seated correctly.B
The network card is not configured correctly.C
The server does not support 1024 MB of memory.D
Master SDRAM ECC needs to be enabled in the CMOS.
考题
单选题What is a reason for reviewing the user requirements document with the client?()A
To gain the client’s acceptance of the detailed designB
To verify mutual understanding of project resourcesC
To verify mutual understanding of the detailed project planD
To verify mutual understanding of targeted product performanceE
To verify mutual understanding of the tests that will be done after the product is completed
考题
单选题Which RAID standard combines data striping across drives with mirroring?()A
RAID 0+1B
RAID 1+5C
RAID 3D
Hybrid RAID 5+