网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

吊杆停用时,稳索必须要收起来。()

  • A、When the derrick is stopped, the guy must be stowed.
  • B、When the derrick is stopped, the guy must be topped.
  • C、When the derrick is stopped, the guy must be lowered.
  • D、When the guy is stopped, the derrick must be stowed.

参考答案

更多 “吊杆停用时,稳索必须要收起来。()A、When the derrick is stopped, the guy must be stowed.B、When the derrick is stopped, the guy must be topped.C、When the derrick is stopped, the guy must be lowered.D、When the guy is stopped, the derrick must be stowed.” 相关考题
考题 They stopped () when it rained. A、playingB、playC、played

考题 He stopped_____ homework when dinner was ready.A. to doB. doC. doing

考题 The girl stopped ___________ when her mum came in.A. cryingB. to cryC. cry

考题 The preventer guy,as used on a conventional yard and stay rig,______.A.Is rigged at an angle of 70° to 90° from the guy it assistsB.Takes the strain imposed on the schooner guy when burtoning cargoC.Is rigged when lifting cargo that exceeds the SWL of a single whipD.Should take the strain if the regular guy parts

考题 When the derrick changes its ()(角度), its lifting capacity changes correspondingly.A、angelB、lengthC、heightD、angle

考题 起货机出故障时,水手要去叫电工来修理。()A、When the windlass is in trouble, the sailor must go and call the electrician to repair it.B、When the derrick is in trouble, the sailor must go and call the electrician to repair it.C、When the winch is in trouble, the sailor must go and call the electrician to repair it.D、When the winch is in trouble, the sailor must go and call the carpenter to repair it.

考题 The ()(吊杆托架) supports the derrick.A、derrick boom restB、derrick headC、derrick mastD、derrick guy

考题 The parts of the derrick are: derrick boom rest, gooseneck, center guy, stay, topping lift, topping lift block and so on.()A、吊杆的部件有:吊杆支架、鹅颈头、中心稳索、支索、千斤索和千斤索滑车组等。B、吊杆的部件有:鹅颈头、中心稳索、千斤索、侧稳索、千斤索滑车组和支索等。C、吊杆的部件有:中心稳索、侧稳索、吊杆支架、鹅颈头、千斤索、和千斤索滑车组等。D、吊杆的部件有:侧稳索、中心稳索、鹅颈头、吊杆支架、千斤索、和千斤索滑车组等。

考题 When the weather becomes bad, the hatch covers will be ().A、closedB、openedC、handledD、stopped

考题 When the derrick is stopped, the guy must be ()(收好).A、taken inB、slacked offC、adjustedD、stowed

考题 ()do you want the derrick adjusted?A、WhatB、WhereC、HowD、When

考题 请调高一下吊杆。()A、Lower the derrick, please.B、Top the derrick, please.C、Swing the derrick, please.D、Adjust the derrick, please.

考题 Could you show me ()to operate the derrick?A、whichB、whatC、howD、when

考题 Before the operation of the derrick, check all ()(索具)closely and everything must be in good condition.A、blocksB、goosenecksC、tackleD、guys

考题 Release the ()(制动器)when letting go the anchor.A、stopperB、brakeC、lockerD、derrick

考题 When the derrick is topped, the guys must be ().A、slacked offB、send awayC、taken inD、send out

考题 不要随意地移动稳索。()A、Don’t shift the guy as you like.B、Don’t shift the stay as you like.C、Don’t move the derrick as you like.D、Don’t move the crane as you like.

考题 单选题During an engine room watch if immediate action is necessary to ensure safety of the ship its machinery and crew ()A the chief engineer must be informed at firstB the captain must be informed at firstC it must be taken by the duty engineerD the generator engine must be stopped

考题 单选题The preventer guy,as used on a conventional yard and stay rig,().A is rigged at an angle of 70°to 90°from the guy it assistsB takes the strain imposed on the schooner guy when burtoning cargoC is rigged when lifting cargo that exceeds the SWL of a single whipD should take the strain if the regular guy parts

考题 单选题When the derrick is topped, the guy must be ()(放松).A slacked offB sent awayC sent outD taken in

考题 单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().A dockB holdC pedestalD machinery space

考题 单选题When the derrick is stopped, the guy must be().A take inB slacked offC stowedD taken

考题 单选题(), the engine must be stopped immediately.A Should knocking occurB If knocking occurC Should if knocking occursD If occur knocking

考题 单选题In a married falls rig at the after end of a hatch,a boom is rigged in a fore and aft line through its heel.Stresses on the outboard guy will be LEAST if the guy is made fast at a point().A Abreast the heelB At right angles to the boom when viewed from aboveC Aft of the heelD Forward of the spiderband

考题 单选题The ()(吊杆托架) supports the derrick.A derrick boom restB derrick headC derrick mastD derrick guy

考题 单选题In a married falls rig at the after end of a hatch , a boom is rigged in a fore and aft line through its heel . Stresses on the outboard guy will be least if the guy is made fast at a point().A abreast the heelB at right angles to the boom when viewed from aboveC aft of the heelD forward of the spiderband

考题 单选题吊杆停用时,稳索必须要收起来。()A When the derrick is stopped, the guy must be stowed.B When the derrick is stopped, the guy must be topped.C When the derrick is stopped, the guy must be lowered.D When the guy is stopped, the derrick must be stowed.