网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
污水井()
- A、bilge well
- B、bilge water
- C、fresh water
- D、sea water
参考答案
更多 “污水井()A、bilge wellB、bilge waterC、fresh waterD、sea water” 相关考题
考题
()must be familiar with these requirements of bilge water management, particularly those directly involved with such operations involving bilge water.
A.All responsible personnelB.All the crew served in engine roomC.The masterD.The chief engineer
考题
When the ships is going to enter into the harborA.change from heavy fuel oil to diesel oil for main engineB.pumping out bilge waterC.change sea chest form high level one to lower level oneD.test emergency generator
考题
Cylinders of marine diesel engines are normally cooled by ___ .A.sea waterB.fine mineral oilC.sanitary waterD.fresh water
考题
When is the density of the water required to be logged in the logbook of a ship?A.Any time the vessel moves from water of one density into waters of a different densityB.Prior to getting underway when the vessel is floating in fresh or brackish waterC.Only when the vessel moves from fresh water into salt waterD.The density of the water is not required to be logged in the unofficial logbook
考题
What is the BEST conductor of electricity?A.Carbon dioxideB.Distilled waterC.Fresh waterD.Salt water
考题
During the towing of a survival craft,a lookout should be on station to ______.A.release the towline in an emergencyB.help the helmsman steerC.look for food and waterD.check the water level in the bilge
考题
Topside area from deep loadline to bulwark to be thoroughly washed down with ______.A.highly pressure fresh waterB.high pressured fresh waterC.highly pressured fresh waterD.high pressure fresh water
考题
After being launched from a vessel, totally enclosed survival craft which have been afloat over a long period require ______.A.frequent opening of hatches to permit entry of fresh airB.regular checks of bilge levelsC.use of ear plugs to dampen engine noiseD.frequent flushing of the water spray system with fresh water
考题
Before loading bulk grain, bilge wells must be covered to ______.A.add strength to the bilge well strainerB.permit rapid flow of water to the bilge wellsC.prevent cargo sifting into the bilge wellsD.prevent oil, water, or other liquid from reaching the cargo
考题
I AM MAKING WATER means ______.A.My vessel is leakingB.My vessel is producing fresh waterC.My vessel is producing sea waterD.Sea water is de-salted on board my vessel
考题
After leaving the port, we used ()to clean the empty holds and decks.A、fresh waterB、sea waterC、both A and BD、ballast water
考题
淡水注入管()A、fresh water filling pipeB、sea water filling pipeC、ballast water filling pipeD、bilge water filling pipe
考题
饮用水注入管()A、fresh water filling pipeB、bilge water filling pipeC、drinking water filling pipeD、sea water filling pipe
考题
单选题Before loading bulk grain, bilge wells must be covered to().A
add strength to the bilge well strainerB
permit rapid flow of water to the bilge wellsC
prevent cargo sifting into the bilge wellsD
preven oil, water , or other liquid from reaching the cargo
考题
单选题An oil water monitor is required in order to measure ().A
the oil content in waterB
the water content in fuel oilC
the water level in bilge wellD
the oil level in bilge well
考题
单选题If water is rising in the bilge of a lifeboat,you should FIRST().A
abandon the survival craftB
check for cracks in the hullC
shift all personnel to the sternD
check the bilge drain plug
考题
单选题After being launched from a vessel,totally enclosed survival craft which have been afloat over a long period require().A
frequent opening of hatches to permit entry of fresh airB
regular checks of bilge levelsC
use of ear plugs to dampen engine noiseD
frequent flushing of the water spray system with fresh water
考题
单选题You are unable to pump out the aft starboard engine room bilge well that is fouled, with one foot of water over the top of the bilge well, what actionshould be carried out?()A
Send the wiper into the well with only a scoop and pailB
Remove the bilge manifold valve and attempt to back flush the lineC
Simultaneously operate all available bilge pumpsD
It is only necessary to transfer half the contents of a drum of degreaser into the bilge well
考题
单选题Which of the following operations must be entered on the Oil Record Book Part Ⅰ? () Ⅰ.Routine discharge at sea of bilge water containing oil from the machinery spaces Ⅱ.Bunkering of fuel oilA
Ⅰ onlyB
Ⅱ onlyC
both Ⅰ and ⅡD
neither Ⅰ nor Ⅱ
考题
单选题The fresh water generator produces fresh water ().A
by cooling sea waterB
by heating sea waterC
by evaporation of sea waterD
by purifying sea water
热门标签
最新试卷