网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

起锚,留一节在水里。()

  • A、Heave up the cable and leave one shackle in water.
  • B、Weigh anchor and leave one shackle in water.
  • C、Lower the cable and leave one shackle in water.
  • D、Drop anchor and leave one shackle in water.

参考答案

更多 “起锚,留一节在水里。()A、Heave up the cable and leave one shackle in water.B、Weigh anchor and leave one shackle in water.C、Lower the cable and leave one shackle in water.D、Drop anchor and leave one shackle in water.” 相关考题
考题 靠10m水深的泊位时,用于制速拖锚的出链长度一般为______。A.1 shackle左右B.2 shackle左右C.3 shackle左右D.4 shackle左右

考题 The fluke angle of an anchor system is the angle between the ______.A.flukes and the shankB.shank and the sea bottomC.mooring line and the sea bottomD.flukes and the shackle

考题 What is the most important difference between the bow type anchor shackle and the D-type anchor shackle?A.The bow type shackle provides a superior connectionB.The D-type shackle is weaker than the bow typeC.The bow type shackle is weaker than the D-typeD.The D-type shackle provides an inferior connection

考题 Which two components pass through the shank of an LWT anchor?A.Anchor shackle and stockB.Tripping palm and flukesC.Crown and chocksD.Swivel and stabilizer bar

考题 You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun's chair.The proper way to do this is to ride down the stay on a riding shackle ______.A.with the pin of the shackle riding on the stayB.with the pin of the shackle through the chair's bridle eyeC.with a hook attaching the chair to the riding shackleD.connected to a second shackle on the chair

考题 The safest device used to secure the end of the pendant wire when it is initially passed to the anchor handling vessel is a ______.A.Pelican hookB.Hydraulic deck stopperC.Connecting linkD.Shackle

考题 ______port anchor,one shackle in water.A.ThrowB.Heave inC.Cut offD.Let go

考题 One Friday, we were packing to leave for a weekend away__________my daughter hearedcries for help.A.after B.while C.since D.when

考题 When does the next bus leave for Glasgow? ()AI‘ve never been there.BThe next one is faster.CThey leave every hour.DThe city is far away.

考题 Port anchor is ready and one shackle on deck. ()A、左锚已经在甲板上准备好。B、左锚已备好,一节在甲板。C、备左锚,将放在甲板上。D、左锚一节锚链已经在甲板上准备好。

考题 ()port anchor, one shackle in water.A、Heave inB、Cast offC、Let goD、Heave away

考题 单选题Fracture damage to the end links of the anchor cable,or to the jews’ harp may be eliminated by().A using a small diameter connecting shackleB ensuring the swivel is well lubricated and free to turnC installing the connecting shackle with the bow towards the anchorD securing a piece of wood to the jews' harp

考题 单选题A common means of connecting shots of anchor chain in the field is to use a().A sprocketB Kenter linkC swivelD end shackle

考题 单选题If you find this item too difficult to work out, it is _____ to leave as it is and move to the next one.A advisableB changeableC variableD adaptable

考题 单选题You are preparing to slush a stay on your vessel by lowering yourself down the stay in a bosun’s chair.The proper way to do this is to ride down the stay on a riding shackle().A with the pin of the shackle riding on the stayB with the pin of the shackle through the chair's bridle eyeC with a hook attaching the chair to the riding shackleD connected to a second shackle on the chair

考题 单选题When does the next bus leave for Glasgow? ()A I‘ve never been there.B The next one is faster.C They leave every hour.D The city is far away.

考题 单选题Port anchor is ready and one shackle on deck. ()A 左锚已经在甲板上准备好。B 左锚已备好,一节在甲板。C 备左锚,将放在甲板上。D 左锚一节锚链已经在甲板上准备好。

考题 单选题An advantage with one of the education projects is that the managersA are usually good teachersB rarely leave the companyC can continue their careers

考题 单选题Weigh anchor and()(留)one shackle in water.A stayB keepC leaveD have

考题 单选题You are preparing to lubricate standing rigging on your vessel.When rigging a bosun’s chair on a stay with a shackle,().A Connect the shackle to the bosun's chair with a hookB Never allow the shackle pin to ride on the stayC Run the gantline through the shackle and then make fast to the bosun's chairD Tie the bitter end of the gantline to the shackle before shackling it to the bosun's chair

考题 单选题起锚,留一节在水里。()A Heave up the cable and leave one shackle in water.B Weigh anchor and leave one shackle in water.C Lower the cable and leave one shackle in water.D Drop anchor and leave one shackle in water.

考题 单选题What is the bow type anchor shackle primarily used for().A Chain to chain connectionsB Chain to anchor connectionsC Kenter link to anchor connectionsD Wire rope connections

考题 单选题()port anchor,one shackle in water.A ThrowB Heave inC Cast offD Let go

考题 单选题()port anchor, one shackle in water.A Heave inB Cast offC Let goD Heave away

考题 单选题How are lifelines attached to a life float?()A By servingB By splicing one end of the line around the apparatusC Securely attached around the outside in bights no longer than three feetD With an approved safety hook or shackle

考题 单选题The fluke angle of an anchor system is the angle between the().A flukes and the shankB shank and the sea bottomC mooring line and the sea bottomD flukes and the shackle

考题 单选题Which two components pass through the shank of an LWT anchor?()A Anchor shackle and stockB Tripping palm and flukesC Crown and chocksD Swivel and stabilizer bar