网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
The ()of the derrick is out of order.
- A、black
- B、back
- C、block
- D、broken
参考答案
更多 “The ()of the derrick is out of order.A、blackB、backC、blockD、broken” 相关考题
考题
The net productivity per gang-hour can be improved through a decrease of ______.A.cranes/derricksB.crane/derrick cyclesC.crane/derrick cycle timeD.weight per package
考题
把吊杆甩向码头。()A、Please swing the derrick to wharf side.B、Just go down the derrick , please.C、Just a moment , please.D、Please swing the derrick to inboard.
考题
请修理一下受损吊杆。()A、Please have the damaged derrick readjusted.B、Please have the damaged derrick repaired.C、Please have the damaged derrick painted.D、Please have the damaged derrick brushed.
考题
Our heavy derrick has been ()(不用)for a long time.A、out of orderB、out of dateC、out of dangerD、out of use
考题
请把吊杆甩到舱口上方好吗?()A、Will you please swing the heavy derrick over the hatch?B、Will you please swing the derrick over the hatch?C、Will you please lower the derrick over the hatch?D、Will you please top the heavy derrick over the hatch?
考题
The ()(吊杆托架) supports the derrick.A、derrick boom restB、derrick headC、derrick mastD、derrick guy
考题
This ()was repaired in Singapore.A、damaged derrickB、damaging derrickC、derrick to be damagedD、derrick
考题
重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.
考题
这个吊杆的安全工作负荷是6吨。()A、The SWL of the derrick is five tons.B、The SWL of the heavy derrick is six tons.C、The SWL of the derrick is six tons.D、The SWL of the crane is six tons.
考题
When the derrick is topped, the guys must be ().A、slacked offB、send awayC、taken inD、send out
考题
这个鹅颈头弯了。()A、This gooseneck is bent.B、This derrick is bent.C、This winch is in trouble.D、This block is worn out.
考题
单选题这个吊杆的安全工作负荷是6吨。()A
The SWL of the derrick is five tons.B
The SWL of the heavy derrick is six tons.C
The SWL of the derrick is six tons.D
The SWL of the crane is six tons.
考题
单选题The net productivity per gang-hour can be improved through a decrease of().A
Cranes/derricksB
Crane/derrick cyclesC
Crane/derrick cycle timeD
Weight per package
考题
单选题The main function of the drawworks on a ship is to().A
transport tubulars from the pipe racks to the derrick floorB
maintain constant tension on the marine riserC
store and secure the excess drill lineD
lower and hoist the drill string into and out of the drilled hole
考题
单选题这个鹅颈头弯了。()A
This gooseneck is bent.B
This derrick is bent.C
This winch is in trouble.D
This block is worn out.
考题
单选题When the union purchase derrick is operated, one derrick is positioned over the quayside and the other almost vertically over the ().A
dockB
holdC
pedestalD
machinery space
考题
单选题请调高一下吊杆。()A
Lower the derrick, please.B
Top the derrick, please.C
Swing the derrick, please.D
Adjust the derrick, please.
考题
单选题A warp end may be fitted for operating the derrick topping wire which adjusts the derrick ().A
lengthB
slackC
heightD
rotation direction
考题
单选题我们的重吊杆已经长时间不用了。()A
Our derrick has been out of use for a long time.B
Our heavy derrick has been out of use for a long time.C
Our crane has been out of use for a long time.D
Our winch has been out of use for a long time.
考题
单选题() may be fitted for operating the derrick topping lift (the wire which adjusts the derrick height).A
A capstanB
A holdC
A warp endD
A mooring drum
考题
单选题Our heavy derrick has been out of use.()A
我们的重吊已经失控了。B
我们的重吊出故障了。C
我们的重吊已经不用了。D
我们的重吊过期了。
考题
单选题The bees()out o ftheir hive.A
flockedB
swarmedC
packedD
crowded
热门标签
最新试卷