网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Two mooring lines may be placed on the same bollard and either one cast off first if().
A
the eye of the second line is dipped
B
the mooring lines are doubled
C
the bollard has two horns
D
one of the lines is a breast line
参考答案
参考解析
解析:
暂无解析
更多 “单选题Two mooring lines may be placed on the same bollard and either one cast off first if().A the eye of the second line is dippedB the mooring lines are doubledC the bollard has two hornsD one of the lines is a breast line” 相关考题
考题
The best method for tying two lines of the same size together is by using a ______.A.becket bendB.two bowlinesC.single carrick bendD.square knot
考题
A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ______.A.fixB.running fixC.estimated positionD.dead-reckoning position
考题
A storm is forecast for the area where your vessel is moored. For its safety you should put ______.A.more slack in the mooring linesB.a strain on the mooring linesC.chafing gear on the mooring linesD.grease on the mooring lines
考题
Tensile stress is a result of two forces acting in ______.A.opposite directions on the same line,tending to pull the material apartB.opposite directions on the same line,tending to compress the objectC.opposite directions along parallel linesD.the same direction along parallel lines
考题
If two mooring lines are to be placed on the same bollard,which method is BEST?______.A.Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB.It makes no difference how the lines are placedC.Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD.Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
考题
Each line has a large eye splice at the end. The eye is placed over a ()(系缆桩) .A、bitB、guardC、quayD、bollard
考题
You should (松)()the mooring lines at the same time when the wind is big.A、fastenB、slackC、fastD、slacken
考题
The ()(系泊缆绳)consist of a head line ,two breast lines, two spring lines and a stern line.A、moor linesB、mooring linesC、unmoor linesD、unmooring lines
考题
Each line has a large eye splice at the end. The eye is placed over a ().A、bitB、guardC、quayD、bollard
考题
及时调整缆绳。()A、Adjust the mooring lines on time.B、Adjust the mooring lines in time.C、Adjust the mooring lines quickly.D、Adjust the mooring lines slowly.
考题
单选题During storm conditions on a vessel,the mooring tensions should be adjusted so that().A
all mooring lines have a different tensionB
the leeward lines have higher tension than the windward linesC
the maximum tension of the most heavily loaded line does not exceed the safe working loadD
all horizontal tension forces on the windward lines are no greater than the vertical tension forces
考题
单选题What is likely to occur when you are surging synthetic mooring lines on the gypsyhead during mooring operations?()A
The lines may jam and then jump off the gypsyheadB
If there is sudden strain on the line,the man tending the line may be pulled into the gypsyheadC
The lines' surging may cause the vessel to surgeD
The heat generated may cause the lines to temporarily fuse to the gypsyhead
考题
单选题Tensile stress is a result of two forces acting in().A
opposite directions on the same line,tending to pull the material apartB
opposite directions on the same line,tending to compress the objectC
opposite directions along parallel linesD
the same direction along parallel lines
考题
单选题A Chinese stopper (two lines) will hold best when you().A
fasten the bitter ends to the mooring line with half hitchesB
twist the ends together and hold them in the direction of the pullC
twist the ends together and hold them in the direction opposite to the pullD
twist the ends together and hold them at right angles to the mooring line
考题
单选题A position that is obtained by using two or more intersecting lines of position taken at nearly the same time,is a(n) ().A
fixB
running fixC
estimated positionD
dead-reckoning position
考题
单选题You should slack the mooring lines ()when the wind is big.A
at the same timeB
on timeC
in timeD
at times
考题
单选题Get ready the mooring machinery, mooring lines and the gangway for ().A
loading cargoB
arrival in portC
departure from portD
unloading cargo
考题
单选题You should ()the mooring lines at the same time when the wind is big.A
fastenB
slackC
fastD
slacken
考题
单选题If two mooring lines are to be placed on the same bollard,which method is BEST?().A
Place the eye from the forward line on the bollard and then place the eye from the second line directly over the firstB
It makes no difference how the lines are placedC
Place the eye from either line on the bollard,and then bring the eye of the other line up through the eye of the first,and place it on the bollardD
Place both eyes on the bollard,in any manner,but lead both lines to the same winch head on the vessel and secure them on the winch
考题
单选题The best method for tying two lines of the same size together is by using a().A
becket bendB
two bowlinesC
single carrick bendD
square knot
考题
单选题A storm is forecast for the area where your vessel is moored. For its safety you should put ().A
more slack in the mooring linesB
a strain on the mooring linesC
chafing gear on the mooring linesD
grease on the mooring lines
考题
单选题Mooring with two bow anchors has which major advantage over anchoring with one bow anchor? ().A
The vessel will not reverse direction in a tidal currentB
The radius of the vessel's swing will be shortenedC
A mooring approach may be made from any directionD
The vessel will not swing with a change in wind
考题
单选题Which statement is TRUE about placing the eyes of two mooring lines on the same bollard?()A
Put one line at the low point and one at the high point of the bollard so they don't touchB
Take the eye of the second line up through the eye of the first line before putting the second line on the bollardC
Never put two mooring lines on the same bollardD
The mooring line forward should be put on the bollard first
考题
单选题The ARPA may swap targets when automatically tracking if two targets().A
are tracked on reciprocal bearingsB
are tracked at the same rangeC
are tracked on the same bearingD
pass close together
考题
单选题In a storm,the leeward lines of a ship’s mooring system will().A
pull the unit in the same direction that the weather is pushing itB
pull the unit in the opposite direction that the weather is pushing itC
tend to keep the unit on its original location over the well headD
affect the unit's draft and inclination as maximum mooring tensions are reached
热门标签
最新试卷