网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()
A
LDAP Authentication Module
B
Smart Assist for Active Directory
C
C-SPOC for user and password management
D
File Collections designating one node as the primary authentication node
参考答案
参考解析
解析:
暂无解析
更多 “单选题An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A LDAP Authentication ModuleB Smart Assist for Active DirectoryC C-SPOC for user and password managementD File Collections designating one node as the primary authentication node” 相关考题
考题
Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()
A. Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.B. Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.C. On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.D. On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
考题
In a JSRP cluster with two J6350 routers, the interface ge-7/0/0 belongs to which device? ()
A. This interface is a system-created interface.B. This interface belongs to NODE0 of the cluster.C. This interface belongs to NODE1 of the cluster.D. This interface will not exist because J6350 routers have only six slots.
考题
A new HACMP maintenance level has recently been released. An administrator is creating a project plan that is required for applying the updates for a three-node production cluster. To minimize downtime,what is the best way to accomplish the updates on all cluster nodes?() A、 Perform a graceful takeover one node at a time and apply the updates.B、 Perform the updates on all nodes simultaneously using C-SPOC utilities.C、 Perform the updates on node at a time with the cluster software active.D、 Perform a graceful stop of all cluster nodes and apply updates to all nodes.
考题
During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?() A、 All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B、 All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C、 All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D、 All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
考题
An administrator wants to install Web SMIT on a node that is not part of a cluster. Which PowerHA filesetprovides this function?()A、cluster.sysmgt.wsmB、cluster.es.client.wsmC、cluster.es.server.websmD、cluster.sysmgt.websm.rte
考题
During the initial cluster design,a disk heartbeat,Point-to-Point non-IP network is being planned as part of a three-node cluster implementation. The disk environment will use LVM mirroring for disk redundancy. The volume groups will be created as Enhanced Concurrent Capable. To facilitate disk heartbeating,how many disks per node and how many networks will be required?() A、 One disk per node,one networkB、 Two disks per node,one networkC、 Two disks per node,six networksD、 Two disks per node,three networks
考题
An administrator is planning a cluster running applications in 3 separate resource groups. RGA - Database 1 RGB - Web Server RGC - Database 2 Database 1 and Database 2 must be online before the Web Server. All resource groups have a Startup Policyof Online on Home Node Only. Which of the following will ensure that the resource groups are processed in the correct order?()A、Set the Serial Acquisition OrderB、Set the Parallel Acquisition OrderC、Configure Online on the Same Node DependencyD、Configure Online on Different Nodes Dependency
考题
An administrator runs clstat on a cluster node and receives the following response: ’Can not get Cluster Information.’ Which of the following daemons may need to be started in order to correct this problem?()A、 topsvcsB、 clinfoESC、 snmpinfoD、 clsmuxpdES
考题
An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A、There is a DARE lock in placeB、A PowerHA migration is in progressC、Cluster services is not active on the other nodeD、The other cluster node is running a different version of RSCT
考题
An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A、LDAP Authentication ModuleB、Smart Assist for Active DirectoryC、C-SPOC for user and password managementD、File Collections designating one node as the primary authentication node
考题
An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B、Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C、Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D、Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
An administrator wants to use the online planning worksheets as an aid to configuring a PowerHA cluster.Which PowerHA fileset would the administrator need to install in order to obtain this tool?()A、cluster.es.hawB、cluster.es.worksheetsC、cluster.es.tools.worksheetsD、cluster.es.server.worksheets
考题
During a planning session, it is determined that a three node cluster (Node ’A’, Node ’B’, and Node ’C’) will meet the customer’s application needs. Node ’B’ will be a hot-standby fallover node for both Node ’A’ and Node ’C’ resource groups. A serial network for this cluster will require which connections?() A、 A single serial network between Node ’A’ and Node ’B’ and Node ’C’B、 A point-to-point link between Node ’A’ and Node ’C’,and Node ’B’ and Node ’C’C、 A serial network between Node ’A’ and Node ’C’,and a serial network between Node ’B’ and Node ’C’D、 A point-to-point link between Node ’A’ and Node ’B’ Node ’B’ and Node ’C’ and Node ’A’ ad Node ’C’
考题
During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?() A、 None,everything can be done with the cluster active.B、 Minimal downtime will be required to import the volume groups.C、 Several hours are required for testing before final synchronization.D、 Minimal downtime will be required to connect and test the serial network.
考题
When does the Online Planning Worksheet tool run a validation?()A、When loading and activating a definition file into an inactive clusterB、When exporting a definition to a cluster node or saving a definition fileC、When importing a definition from an active cluster or saving a definition fileD、When loading a definition into an active cluster or synchronizing a definition file
考题
In a JSRP cluster with two J6350 routers, the interface ge-7/0/0 belongs to which device? ()A、This interface is a system-created interface.B、This interface belongs to NODE0 of the cluster.C、This interface belongs to NODE1 of the cluster.D、This interface will not exist because J6350 routers have only six slots.
考题
Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?() A、 Change the cluster to a rotating design.B、 Change the Cascading without Fallback flag to true.C、 Change the Inactive Takeover field to false in the cluster configuration.D、 Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
考题
单选题An administrator runs clstat on a cluster node and receives the following response: ’Can not get Cluster Information.’ Which of the following daemons may need to be started in order to correct this problem?()A
topsvcsB
clinfoESC
snmpinfoD
clsmuxpdES
考题
单选题An administrator is planning for a six node cluster but is concerned about the administration needed tomanage user accounts throughout the cluster. What PowerHA feature could the administrator use to reducethe administration overhead?()A
LDAP Authentication ModuleB
Smart Assist for Active DirectoryC
C-SPOC for user and password managementD
File Collections designating one node as the primary authentication node
考题
单选题A node in a three-node cluster was started, ad it acquired the following three cascading resourcegroups: ’rg1’, ’rg12’, and ’rg3’. The cluster design is to have ’rg1’ normally Node ’A’, ’rg2’ normally on Node ’B’, and rg3’ normally on Node ’C’. How can the administrator reposition the resource groups and correct the problem?()A
Change the cluster resource group definitions from cascading to rotating,synchronize the cluster,and restart HACMPB
Edit the /urs/es/sbin/utilities/clhosts file to reflect he desired node-to-resource group relationships and restart HACMPC
Use the clRGMove utility move rg2 o Node ’B’ and rg3 to Node ’C’,then start the cluster manager on Nodes ’B’ and ’C’ with the clstart utilityD
Disable Inactive Node Takeover,check the node priority list in the resource groups definitions,synchronize the cluster,and start HACMP on Nodes ’B’ and ’C’
考题
单选题An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A
There is a DARE lock in placeB
A PowerHA migration is in progressC
Cluster services is not active on the other nodeD
The other cluster node is running a different version of RSCT
考题
单选题Node ’C’ has just completed reintegration in a three-node cluster. The hacmp.out logifle displays The event node_up_complete for Node ’C’. The cluster administrator wishes to verify that the cluster is stable. In addition to reviewing the cluster log files,what utility should be run to verify the cluster state?()A
clstatB
clinfoC
cldiagD
clverify
考题
单选题During a cluster functionality test, and administrator performs a graceful stop for Node ’B’ in a three-node cluster. What is the expected state of the cluster after Node ’B’successfully completes?()A
All cluster resources halt on Node ’B’,and one or both surviving nodes will gracefully acquire the resources.B
All cluster processes halt on Node ’B’,the cluster resources remain active,and the remaining nodes take no action.C
All cluster processes stay active on Node ’B’,cluster resources are halted,and the remaining nodes take no action.D
All cluster resources will stop,cluster processes halt on Node ’B’,and the remaining cluster nodes take no action.
考题
单选题An administrator has a two node cluster, Node1 and Node2, running resource group rg1. The resource groupis active on Node1. The administrator stopped cluster services and unmanaged the resource group on Node1to work on a problem. Now the administrator needs to move rg1 to Node2. Which of the following will achievethis?()A
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Manually’ and select the destination ofNode2B
Perform a resource group move operation from Node1 to Node2 and select the option to ’Re-manageResource Groups’ set to ’Automatically’C
Perform a clstop on Node1 with option to move resource groups, this will release the resource group fromNode1 and accquire the resource group on Node2.D
Perform a clstart on Node1 with ’Manage Resource Groups’ set to ’Automatically’, then perform a resourcegroup move operation to move rg1 from Node1 to Node2
考题
单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()A
Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.B
Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.C
On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.D
On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
考题
单选题In a JSRP cluster with two J6350 routers, the interface ge-7/0/0 belongs to which device? ()A
This interface is a system-created interface.B
This interface belongs to NODE0 of the cluster.C
This interface belongs to NODE1 of the cluster.D
This interface will not exist because J6350 routers have only six slots.
考题
单选题Company.com has a two-node HACMP cluster with a single cascading resource group. Node ’A’ is the normal production node, and Node ’B’ is the standby node. One of the first steps in the HACMP test plan is to start the cluster and to verify that al elements for the resource group have been acquired. The administrator who is conducting the HACMP test starts the HACMP daemons on Node ’B’ with the ’smitty clstart" command. The administrator notices that Node ’B’ acquires the elements of the resource group, including a service IP labels,a shared volume group, and an application server that has been started. The expectation was that Node ’B’ would enter the cluster in a standby status, rather than acquiring production resources. What should the administrator do to correct this problem?()A
Change the cluster to a rotating design.B
Change the Cascading without Fallback flag to true.C
Change the Inactive Takeover field to false in the cluster configuration.D
Nothing should be done. This is the default behavior for cascading resource groups,and node ’A’ should have been started first.
考题
单选题During an internal IT organization planning session, it is decided that a new cluster node would Enhance the performance of a distributed corporate application. Planning details have been assigned to the administrator. System outages are limited to one weekend per month; therefore, availability will be a key issue in the planning process. How much cluster downtime will need to be allocated for adding a new node?()A
None,everything can be done with the cluster active.B
Minimal downtime will be required to import the volume groups.C
Several hours are required for testing before final synchronization.D
Minimal downtime will be required to connect and test the serial network.
热门标签
最新试卷