网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
An organization currently uses Veritas Volume Manager (VxVM) and is integrating PowerHA. Which of thefollowing describes how PowerHA supports Veritas volume groups?()
A
PowerHA only manages VxVM volume groups by using customized pre- and post-event scripts
B
PowerHA is tightly coupled with AIX LVM. All volumes groups must be converted to AIX LVM
C
PowerHA supports VxVM as an OEM volume group type. PowerHA manages the volume group with a limited suite of management tasks
D
PowerHA supports VxVM as an OEM volume group type. All cluster operations applicable with AIX LVM are also applicable with VxVM
参考答案
参考解析
解析:
暂无解析
更多 “单选题An organization currently uses Veritas Volume Manager (VxVM) and is integrating PowerHA. Which of thefollowing describes how PowerHA supports Veritas volume groups?()A PowerHA only manages VxVM volume groups by using customized pre- and post-event scriptsB PowerHA is tightly coupled with AIX LVM. All volumes groups must be converted to AIX LVMC PowerHA supports VxVM as an OEM volume group type. PowerHA manages the volume group with a limited suite of management tasksD PowerHA supports VxVM as an OEM volume group type. All cluster operations applicable with AIX LVM are also applicable with VxVM” 相关考题
考题
单选题When using IPAT via Aliasing, what is the default distribution preference for the placement of the service IPlabels?()A
CollocationB
Anti-CollocationC
Collocation with persistentD
Anti-Collocation with persistent
考题
单选题A customer is planning a PowerHA cluster split across two sites. The sites are located 10km apart. There is aDS8000 storage array at each site with SAN connectivity between the two arrays. There are only enough IPinterfaces for one IP network in this cluster. How can they ensure that disk data is automatically mirrored and synchronized between sites?()A
Purchase PowerHA/XD licenseB
Purchase PowerHA with GLVM licenseC
Implement PowerHA with split-site LVMD
Implement PowerHA with cross-site LVM
考题
单选题An administrator has a 2 node cluster running PowerHA version 5.5. They remove a resource group from theactive cluster configuration. When performing a verify and synchronize of the cluster, the administrator getsthe following error: "migcheck[471]: cl_connect() error, nodename=Node1, rc=-1 cldare: A communication error prevents obtaining the VRMF from remote nodes. A DARE event cannot be run until this is corrected. Please ensureclcomd is running." What is the most likely cause of this error?()A
There is a DARE lock in placeB
A PowerHA migration is in progressC
Cluster services is not active on the other nodeD
The other cluster node is running a different version of RSCT
考题
单选题Which of the following commands will allow an administrator to determine if the IBM RSCT pre-requisitecomponents for clustering are installed at the correct version?()A
lppchk -v rsct.bundleB
lslpp -l bos.rsct.rteC
lslpp -l rsct.basic.rteD
lppchk -v cluster.es.server.rte
考题
单选题In a cluster using /etc/hosts for name resolution, which of the following describes the minimum requirementsfor the /etc/hosts file?()A
IP address and IP label of each service and boot interface in the clusterB
IP address and IP label of each service and boot interface in the cluster, loopback interface, and the hostname of the nodeC
IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, and the cluster gatewayD
IP address and IP label of each service and boot interface in the cluster, the loopbackinterface, the cluster gateway, and the subnet network addresses
考题
单选题An architect is configuring a PowerHA cluster in the following way:The cluster will consist of two nodes. Each node will have two boot interfaces configured as a single PowerHA network. The cluster is to have asingle resource group with a single service address.Heartbeating over aliased is not to be used. What is the minimum number of subnets required to implement this cluster?()A
1B
2C
3D
4
考题
单选题An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A
The administrator will need to perform an rg_move operationB
The administrator will need to un-manage and re-manage the resource groupC
The administrator will need to execute the new start script from the command lineD
The new start script will be executed as part of the DARE operation to synchronize the cluster
考题
单选题An administrator has integrated a new application into an existing resource group. An application server withstart and stop scripts was defined and added to the resource group definition. The cluster was thensynchronized. How can the new application be started with minimal downtime?()A
The administrator will need to perform an rg_move operationB
The administrator will need to un-manage and re-manage the resource groupC
The administrator will need to execute the new start script from the command lineD
The new start script will be executed as part of the DARE operation to synchronize the cluster
热门标签
最新试卷