Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()
A
An 8-port adapter to the HMC
B
A hub for the private network
C
An additional Ethernet card to the HMC
D
An additional Ethernet card for each partition
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A An 8-port adapter to the HMCB A hub for the private networkC An additional Ethernet card to the HMCD An additional Ethernet card for each partition” 相关考题
考题
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC.Which infrastructure is required for the new HMC?()A.An additional switch for the new HMCB.Asynchronous adapters on the new HMCC.The two 570 servers are directly connected to the new HMCD.One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
考题
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMc B、Asynchronous adapters on the new HMcC、The two 570 servers are directly connected to the new HMc D、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
考题
Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()A、A 24 way p5 595 with 3 LPARsB、A 24 way p5 595 with 2 LPARsC、One p5 570s 16 way and one p5 570 8 wayD、One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
考题
An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A、An additional switch for the new HMCB、Asynchronous adapters on the new HMCC、The two 570 servers are directly connected to the new HMCD、One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
考题
One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()A、Two p5 570 16 way 1.9 MHz machinesB、One p5 590 32 way 1.65 MHz machinesC、One p5 595 32 way 1.65 MHz machinesD、Two p5 570 16 way 1.65 MHz machines
考题
Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A、An 8-port adapter to the HMCB、A hub for the private networkC、An additional Ethernet card to the HMCD、An additional Ethernet card for each partition
考题
Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A、Free up one HMC and update the software for use with the p5 570B、Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC、Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D、Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A、The routes on the HMCB、The firewall setting of the LAN adapterC、The name resolution protocol on the p5 590 serverD、The subnet mask settings on the Ethernet adapters
考题
A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A、Implement a proxy server to provide multiple sources to one destination B、Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C、Purchase a network hub or switch so both p5 570s can connect to the single HMC D、Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
考题
A customer currently has five partitioned POWER4 systems and is adding new systems. When the pSeries technical specialist introduces the first p5 system with CoD into this environment, how should the HMC be handled?()A、Order a new HMC to support the p5 system.B、Attach the new p5 system to the existing HMC.C、Upgrade the existing HMC to accommodate both the POWER4 and p5 systems.D、Do nothing. This system does not require an HMC.
考题
Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A、4 processors 8GB of memoryB、5 processors 8GB of memoryC、4 processors 10GB of memoryD、5 processors 10GB of memory
考题
Which server houses the database partitions in the AIX BCU V2.1? ()A、 IBM System p5 570 B、 IBM System p5 575 C、 IBM System p5 590 D、 IBM System p5 595
考题
单选题Companycom purchased a new p5 570 without a HMC. The customer does not know how to power the full frame/system off since there does not appear to be an on/off button. What can be done to accomplish this task?()A
Telnet into the machine and do a shutdown -FrB
Log into ASMI as Administrator and use ASMI menusC
Log into the service processor using WebSM and use ASMI menusD
Use the off button which is located to the left below the LEDs
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMCB
Asynchronous adapters on the new HMCC
The two 570 servers are directly connected to the new HMCD
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMC
考题
单选题One of the key decision making factors in a very competitive opportunity will be cost. Companycom needs an aggregate rPerf rating of 120. What is the best solution?()A
Two p5 570 16 way 1.9 MHz machinesB
One p5 590 32 way 1.65 MHz machinesC
One p5 595 32 way 1.65 MHz machinesD
Two p5 570 16 way 1.65 MHz machines
考题
单选题A client has an existing p5 570 that is directly connected to a HMC. The customer will be purchasing another p5 570. Which of the following solutions would be appropriate to provide HMC connectivity to the second p5 570?()A
Implement a proxy server to provide multiple sources to one destination B
Purchase an additional Ethernet adapter for each p5 570 to provide connectivity between the two C
Purchase a network hub or switch so both p5 570s can connect to the single HMC D
Purchase an additional HMC since multiple HMC are required when more than one POWER5 Enterprise class server is used Purchase an additional HMC since multiple HMC? are required when more than one POWER5 Enterprise class server is used
考题
单选题Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A
APV, AIX5.2ML4B
AIX5.3 or i5/OSC
APV, i5/OS, AIX5.3D
APV, AIX5.3 or SuSE9
考题
单选题Companycom is planning on upgrading from a pSeries S85 running AIX 4.3.3 to a p5 570 with an HMC. The new server will run AIX 5L 5.2. What should be performed prior to the migration?()A
Verify the ISV application runs on AIX 5.2B
Power4 to POWER5 upgrades are not supported without a application recompileC
Check the placement and size of the boot logical volume and disk space requirements on the S85D
AIX 4.3.3 to AIX 5L 5.2 migrations are perfectly compatible so nothing needs to be checked
考题
单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A
Free up one HMC and update the software for use with the p5 570B
Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC
Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D
Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
单选题Which server houses the database partitions in the AIX BCU V2.1? ()A
IBM System p5 570 B
IBM System p5 575 C
IBM System p5 590 D
IBM System p5 595
考题
单选题Companycom recently ordered a p5 570 and an HMC. Prior to delivery, two additional p5 570 servers were added to the order. Upon installation, the system administrator noticed that they do not have a method to connect the p5 570 servers to the HMC. Which of the following will allow them to connect all servers to the HMC?()A
An 8-port adapter to the HMCB
A hub for the private networkC
An additional Ethernet card to the HMCD
An additional Ethernet card for each partition
考题
单选题Companycom has several CR3 HMCs managing their p690 servers. They have purchased a new p5 570 and would like to manage the new system with an existing HMC. What is required to support this environment?()A
Free up one HMC and update the software for use with the p5 570B
Connect the new p5 570 server to an existing HMC and manage the p690s and p5 570 from that HMCC
Order a new HMC to support the new p5 570 server since the CR3 HMC is not supported for a p5 570D
Backup the HMC to DVD-RAM and select HMC migrate to move all the profile data to the new HMC software
考题
单选题Companycom is buying an application solution that bases its software licensing on the number of CPUs per machine. They will be running two instances of this application and will require 8 CPUs each. A second application is priced based on CPUs per LPAR as well as the class of machine. That application will require 8 CPUs. What is the best hardware to propose to keep the software cost low?()A
A 24 way p5 595 with 3 LPARsB
A 24 way p5 595 with 2 LPARsC
One p5 570s 16 way and one p5 570 8 wayD
One p5 595 12 way active and 12 way inactive, and one p5 570 8 way
考题
单选题A system administrator is installing a p5 590 server with an HMC. After pulling the websm client down, it is not possible to connect to the HMC. The HMC can be pinged from the client. Which of the following settings should be verified next?()A
The routes on the HMCB
The firewall setting of the LAN adapterC
The name resolution protocol on the p5 590 serverD
The subnet mask settings on the Ethernet adapters
考题
单选题An administrator has an existing HMC and POWER6 570 connected to a network switch. The administrator is planning to install two POWER6 570s with a dedicated HMC. Which infrastructure is required for the new HMC?()A
An additional switch for the new HMc B
Asynchronous adapters on the new HMcC
The two 570 servers are directly connected to the new HMc D
One 570 is directly connected to the new HMC and the other is directly connected to the existing HMc
考题
单选题Companycom is migrating from a p690 to a p5 595 utilizing APV Virtual IO features. They have created their profiles for their two Virtual IO Servers. The first Virtual IO Server is installed and running. When trying to DLPAR the DVD/ROM the task fails on the HMC. What is the probable cause?()A
APV key is not registeredB
Networking and DNS are not configuredC
/etc/hosts table on HMC is not configuredD
Virtual IO Server dose not support DLPAR
考题
单选题Companycom wants to buy a new p5 570 running AIX 5.3. The applications require 4 processors and 8GB of memory. There is a requirement to have a Virtual IO Server. What is the smallest p5 570 that should be sold to this customer?()A
4 processors 8GB of memoryB
5 processors 8GB of memoryC
4 processors 10GB of memoryD
5 processors 10GB of memory