An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()
A

Verify uninterruptible power supply (UPS) load

B

Verify if server consumes 220V

C

Verify CPU load

D

Verify if server consumes 110V


参考答案

参考解析
解析: 暂无解析
更多 “单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A Verify uninterruptible power supply (UPS) loadB Verify if server consumes 220VC Verify CPU loadD Verify if server consumes 110V” 相关考题
考题 Which of the following is the MOST important physical consideration when deploying a new server?() A. Humidity monitors, Biometrics, and fire suppressionB. Cooling, rack space, and power requirementsC. Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD. Biometrics, fire suppression, and power requirements

考题 An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?() A. Verify uninterruptible power supply (UPS) loadB. Verify if server consumes 220VC. Verify CPU loadD. Verify if server consumes 110V

考题 Refer to the exhibit. The Route.com company is running EIGRP between all the r outers. Currently, if one of the LAN links (LAN1 or LAN2) at the headquarters flaps (goes up and down), the HQRTR1 and HQ - RTR2 routers will experience high CPU usage and have a long EIGRP convergence time. As the new network administrator, you are asked to investigate this situation and determine if there is a quick way to resolve this issue. Which is the most important thing that you can quickly verify first to resolve this issue?()A. Verify that the bandwidth setting on all WAN links is correct.B. Verify that the HQ - RTR1 and HQ - RTR2 routers are configured to send only a default route to all the spoke routers.C. Verify that the HQ - RTR1 and HQ - RTR2 routers are configured for EIGRP Nonstop Forwarding.D. Verify that all the spoke routers are co nfigured for autosummarization.E. Verify that all the spoke routers are configured as EIGRP stub.

考题 An administrator is in charge of several remote servers in Japan. Users call and complain they cannot connect to the company’s resources located on those servers. Which of the following commands would allow the administrator to verify the servers are running?()A、pingB、netstatC、nbtstatD、telnet

考题 Users report that they are unable to connect to a server. An administrator confirms that it is unreachable across the network. Other administrators have been working in the server room throughout the day.  Which of the following is the NEXT step the administrator should take?()A、 Verify the configuration of the connected port on the network switch.B、 Reboot the server.C、 Install a new NIC on the server.D、 Verify that network cables are connected.

考题 A VPN connection is not working correctly and the technician is unable to ping the VPN server. Which of the following actions should the technician do FIRST?()A、Call their local ISPB、Verify the IP information of the serverC、Check their local Internet connectionD、Verify the hostname of the server

考题 An  administrator  must  verify  all  filesets  are  completely  installed  before  an  upgrade.   Which  of  the following commands will perform this task()A、Islpp -vB、Ippchk -vC、installp -vD、instfix -v

考题 An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()A、HBA is compatible with the SAN fiber switch.B、Update the newly installed server with the latest KVM drivers.C、The UPS will continue to perform as expected with the additional load.D、Verify the server NIC is compatible with the NAS.

考题 After a server has been installed into a rack, an administrator must ensure which of the following?()A、Warm air flow is permitted through the front bezelB、The system is labeled so that it can be identifiedC、Verify the change control process can be implementedD、Determine the correct power requirements

考题 An administrator is overseeing the backup process and tapes utilized by a former employee.Which of the following is the BEST way for the administrator to proceed?()A、Utilize differential backups.B、Verify the tape drives are functional.C、Verify that the backups are functional.D、Utilize incremental backups.

考题 Which of the following is MOST useful in HVAC planning? ()A、 Uninterruptible Power Supply (UPS) loadB、 HumidityC、 AmperageD、 VoltageE、 Temperature

考题 An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A、 Verify uninterruptible power supply (UPS) loadB、 Verify if server consumes 220VC、 Verify CPU loadD、 Verify if server consumes 110V

考题 An administrator has a malfunctioning uninterruptible power supply (UPS). Which of the following is the MOST likely cause of the problem?()A、Battery needs to be replacedB、Light switch is turned offC、Smart cable is disconnectedD、UPS needs a firmware update

考题 Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A、 UPS form factorB、 Server form factorC、 Server power supplys wattage ratingD、 Desired runtime

考题 Which of the following is the MOST important physical consideration when deploying a new server?()A、 Humidity monitors, Biometrics, and fire suppressionB、 Cooling, rack space, and power requirements冷C、 Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、 Biometrics, fire suppression, and power requirements

考题 Which of the following is the MOST important physical consideration when deploying a new server?()A、Humidity monitors, Biometrics, and fire suppressionB、Cooling, rack space, and power requirementsC、Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD、Biometrics, fire suppression, and power requirements

考题 A Dell customer decided to use IBM Director and xSeries to manage their servers.  They purchased 10 IBM x336 servers and they already have 75 various Dell servers.  Which TWO steps need to be verified to be able to manage the mixed environment with IBM Director?()A、Verify that the Dell systems have TCP/IP enabledB、Verify that the systems are running the IBM Director AgentC、Verify that the managed systems are SMBIOS 2.1 and WfM 2.0 compliantD、Verify that the Dell systems have at least a 1GB of memory installedE、Install an SNMP agent on the Dell systems as IBM Director cannot manage Industry Standard non-IBM servers

考题 单选题An administrator will be performing a PowerHA upgrade on a cluster from version 5.3 to version 5.5. Which ofthe following tasks will verify a successful migration?()A Use the clstat command and verify the cluster is in a stable stateB After each node is upgraded, run a verification and synchronizationC After all nodes are upgraded, run a verification and synchronizationD Take a snapshot of each node and verify the configuration is the same

考题 单选题An  administrator  must  verify  all  filesets  are  completely  installed  before  an  upgrade.   Which  of  the following commands will perform this task()A Islpp -vB Ippchk -vC installp -vD instfix -v

考题 单选题An administrator will replace five current servers. Which of the following is the MOST important to review before installing new servers?()A  Verify uninterruptible power supply (UPS) loadB  Verify if server consumes 220VC  Verify CPU loadD  Verify if server consumes 110V

考题 单选题Which of the following is the MOST important physical consideration when deploying a new server?()A  Humidity monitors, Biometrics, and fire suppressionB  Cooling, rack space, and power requirements冷C  Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD  Biometrics, fire suppression, and power requirements

考题 单选题An administrator is in charge of several remote servers in Japan. Users call and complain they cannot connect to the company’s resources located on those servers. Which of the following commands would allow the administrator to verify the servers are running?()A pingB netstatC nbtstatD telnet

考题 单选题Users report that they are unable to connect to a server. An administrator confirms that it is unreachable across the network. Other administrators have been working in the server room throughout the day.  Which of the following is the NEXT step the administrator should take?()A  Verify the configuration of the connected port on the network switch.B  Reboot the server.C  Install a new NIC on the server.D  Verify that network cables are connected.

考题 单选题Which of the following is the BEST sequence to bare metal restore a server?()A Determine backups available, restore backups, and verify data.B Restore applications, restore data, and verify data.C Restore OS, restore system applications, and restore data.D Contact end users of outage, restore backup data, and verify data.

考题 单选题An administrator wants to rackmount a new server.  Power and network outlets are available and cooling in the room is adequate to support the additional server. The new server is identical to the other servers already installed.  Which of the following items should the administrator FIRST verify before installing the server?()A HBA is compatible with the SAN fiber switch.B Update the newly installed server with the latest KVM drivers.C The UPS will continue to perform as expected with the additional load.D Verify the server NIC is compatible with the NAS.

考题 单选题Which of the following factors is the MOST important to consider when choosing an uninterruptible power supply (UPS) for a single server? ()A  UPS form factorB  Server form factorC  Server power supplys wattage ratingD  Desired runtime

考题 单选题Which of the following is the MOST important physical consideration when deploying a new server?()A Humidity monitors, Biometrics, and fire suppressionB Cooling, rack space, and power requirementsC Service level agreements, uninterruptible power supply (UPS) deployment, and CCTVD Biometrics, fire suppression, and power requirements