网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()
A
vmstat and iostat data from the older machines
B
The number of CPUs that were installed in the original machines
C
Data from Workload Estimator (WLE) and IBM Performance Management (PM)
D
Performance data that is collected from the new system after it has been put into production
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A vmstat and iostat data from the older machines B The number of CPUs that were installed in the original machines C Data from Workload Estimator (WLE) and IBM Performance Management (PM) D Performance data that is collected from the new system after it has been put into production” 相关考题
考题
A customer has many RS/6000s and POWER4 systems running different AIX applications. What should the customer do to best position themselves for the migration to POWER5?()A、Upgrade OS to AIX 5.2.B、Implement Micro-Partitioning.C、Upgrade HMC to support POWER5.D、Install Partition Load Manager.
考题
A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A、 PowerVM Lx86B、 PowerVM Express EditionC、 PowerVM Standard EditionD、 PowerVM Enterprise Edition
考题
A customer has ordered a rack, a p650, two p630s, and two p615s. During a conversation on installation planning, the pSeries technical specialist recognizes that the customer expects the rack to arrive as one unit. However, the specialist knows that the p650 will be racked, but the other systems will arrive separately. In fact, the other systems are CSU (Customer Set Up). Why should the specialist immediately inform the customer that additional racking is the customer’s responsibility?()A、Because additional systems would require more power receptaclesB、Because the customer may need to do additional facilities planningC、Because the customer needs additional funding to cover the servicesD、Because postponing the eventual discussion will likely lead to customer dissatisfaction
考题
Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A、POWER5 runs in an SMP mode as defaultB、POWER5 can run in a full system mode the same as the p690C、POWER5 can run in full system mode with the purchase of PLMD、POWER5 can run in a full system mode, but it is in LPAR mode
考题
A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A、The technical support specialist has completed a UNIX course at college.B、The technical specialist has supported several similar projects and has earned an IBM AIX certification.C、The technical support specialist’s company sells $3M of UNIX computer systems every year.D、The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
考题
What is a key advantage of the POWER5 technology over all other competitive offerings?()A、POWER5 supports multiple operating systems.B、POWER5 supports more nodes in a clustered environment.C、POWER5 hypervisor has significantly less overhead than hardware partitioning.D、POWER5 has greater granularity of resources such as memory, processors and I/O.
考题
A customer has 5 older POWER5 systems and they want to consolidate them onto a POWER6 system. What information is important to analyze when deciding how to design the new machine using the System Planning Tool?()A、 vmstat and iostat data from the older machines B、 The number of CPUs that were installed in the original machines C、 Data from Workload Estimator (WLE) and IBM Performance Management (PM) D、 Performance data that is collected from the new system after it has been put into production
考题
A customer plans to consolidate several systems onto POWER7. Their immediate requirement is to have a single Power 770, and they will buy a second Power 770 at a later stage. They want to keep their existing three POWER5 570s and three POWER6 520s which are all managed by an HMC (7310-CR3). Which of these statements is true and would minimize the cost?()A、All the machines can be connected to the existing HMC, as long as it is updated to code level 7.7.1 or laterB、The Power 770 requires an HMC (7042-CR5 or later), so they must buy one. All of the systems can be managed by this new HMCC、They should buy a new HMC for the Power 770 system, and leave the POWER5 and POWER6 based systems connected to the existing oneD、The Power 770 requires an HMC, so they should connect the Power 770 to the HMC and convert the POWER5 and POWER6 based servers to IVM
考题
A customer has a key application running in a logical partition on a POWER5 system. The customer wants the ability to run the application with minimal down time using Live Partition Mobility. Which of the following is the minimum PowerVM edition and hardware configuration that will support the customer requirement?()A、 PowerVM Standard Edition on POWER6 hardwareB、 PowerVM Standard Edition with POWER5 hardware C、 PowerVM Enterprise Edition with POWER6 hardwareD、 PowerVM Enterprise Edition with POWER5 hardware
考题
A customer has a new Power 720 with PowerVM Standard Edition. They plan to migrate their single-partition POWER5 550 to the new Power 720. How can the customer migrate from the POWER5 550 to the Power 720 with minimal effort and down time?()A、Perform Live Partition Mobility between the two systems.B、Move the boot disks from the old system to the new system.C、Use Tivoli Storage Manager to back up the POWER5 550 and restore on the Power 720.D、Upgrade AIX to the latest level on the POWER5 550 and clone using the mksysb command.
考题
A customer has recently acquired an XIV system which is up and running. The next phase of theirdata center refresh is to do a non-disruptive data migration off older EMC equipment and beginmanaging their entire environment which also includes HP and HDS storage subsystems. Whatsolution should the storage specialist propose?()A、 SAN Volume Controller B、 IBM Systems Director C、 Additional XIV system D、 Tivoli Storage Manager
考题
A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()A、the production environment does not require an outageB、the production environment requires an outage to install the SVCC、the production environment requires an outage to install the DS8700D、the production environment requires an outage to remove the EMC systems
考题
The customer has an older storage array and is looking to migrate data that currently exists onover 100 73 GB FC drives to a new IBM System Storage DS5020. The customer states that theyhave only 3 TB of data and wants to consolidate on to fewer higher capacity drives. There are sixapplication servers running multiple applications and operating systems utilizing the storagesystem. What would be the next step to accurately identify the new storage configuration?()A、initiate a Disk Magic studyB、initiate a Capacity Magic studyC、runiometer on the current environmentD、utilize the IBM Disk capacity planner toolkit
考题
A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A、A desk, as it not rack mountableB、Ethernet connections to the POWER5 systemsC、Serial connections to the POWER5 systemsD、USB connections for the keyboard and mouse
考题
A financial customer has three data centers that are four kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds. Which solution satisfies the customer’s recovery time objective()A、DS8700 systems at each site running Metro MirrorB、DS8700 systems at each site running Global MirrorC、DS5300 systems at each site running Global MirrorD、XIV systems at each site running Remote Mirroring
考题
A financial customer has three data centers that are approximately five kilometers apart. Their SAP application data needs to be kept synchronized within 10 milliseconds between the three sites. Which of the following solutions satisfies the customer's recovery time objective?()A、DS8700 systems at each site running Metro MirrorB、DS5300 systems at each site running Metro MirrorC、DS5100 systems at each site running Global MirrorD、XIV systems at each site running synchronous mirroring
考题
A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A、The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B、The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C、The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D、The POWER5 system supports more partitions and has the lowest partitioning overhead.
考题
单选题A customer’s data center has all POWER4+ systems, and they plan to add three new p5-570 systems. They will be purchasing a new 7310-CR2 HMC to support the POWER5 systems. What is a key requirement that they need to plan for with the new HMC?()A
A desk, as it not rack mountableB
Ethernet connections to the POWER5 systemsC
Serial connections to the POWER5 systemsD
USB connections for the keyboard and mouse
考题
单选题Companycom is currently using a p690 and has just ordered a p5 590. They prefer to run in full system partition mode, since their application will utilize all the resources in the machine, and they don't want the overhead of an LPAR. What is the best response to the customer about the POWER5 capabilities?()A
POWER5 runs in an SMP mode as defaultB
POWER5 can run in a full system mode the same as the p690C
POWER5 can run in full system mode with the purchase of PLMD
POWER5 can run in a full system mode, but it is in LPAR mode
考题
单选题A customer has ten RS/6000 Model M80, two pSeries 690 Model 681, five POWER5 510 and two POWER6 560 machines installed and running commercial applications. They want to do a server consolidation study in order to replace the existing systems with POWER7 systems. What performance metric is recommended when evaluating the replacement system?()A
IBM CPWB
IBM rPerfC
SPECint_rate2006D
IDEAS International RPE2
考题
单选题A customer has a mission-critical application with redundant fabrics. The customer plans to replace older EMC Symmetrix 8830 systems with an IBM System Storage DS8700 and an IBM SAN Volume Controller (SVC). Which statement best describes the way to minimize the impact of data migration on the production environment()A
the production environment does not require an outageB
the production environment requires an outage to install the SVCC
the production environment requires an outage to install the DS8700D
the production environment requires an outage to remove the EMC systems
考题
单选题A customer plans to consolidate to high-end enterprise level servers using multiple partitions. They are evaluating an IBM POWER5 solution for their server consolidation environment. Which of the following best describes the value of the IBM solution as compared with the competition?()A
The POWER5 system has greater memory and processor granularity and can also run both Linux and AIX at the same time in different LPARs.B
The POWER5 system supports more partitions, processors, and memory than any competitor’s solution.C
The POWER5 system has the lowest partitioning overhead and can also run both Linux and AIX at the same time in different LPARs.D
The POWER5 system supports more partitions and has the lowest partitioning overhead.
考题
单选题What is a key advantage of the POWER5 technology over all other competitive offerings?()A
POWER5 supports multiple operating systems.B
POWER5 supports more nodes in a clustered environment.C
POWER5 hypervisor has significantly less overhead than hardware partitioning.D
POWER5 has greater granularity of resources such as memory, processors and I/O.
考题
单选题A customer has a large UNIX environment and has engaged a pSeries technical specialist to work on a solution with them. Which of the following statements would best establish UNIX credibility with a knowledgeable customer?()A
The technical support specialist has completed a UNIX course at college.B
The technical specialist has supported several similar projects and has earned an IBM AIX certification.C
The technical support specialist’s company sells $3M of UNIX computer systems every year.D
The technical support specialist has sold and installed at least a dozen Apple and iSeries systems with POWER processors.
考题
单选题A new p5 customer has just installed a partitioned p5-550 alongside some older POWER4 servers. The pSeries technical specialist has received a call to say that the existing HMC (7315) cannot connect to the new server. How can the specialist help the customer?()A
Explain to the customer that they need an additional HMC for the POWER5 system.B
Obtain a PO from the customer to purchase additional serial connections to the HMC.C
Obtain a PO from the customer to purchase additional Ethernet connections to the HMC.D
Explain to the customer that they need a firmware update on the HMC to support both POWER4 and POWER5.
考题
单选题A customer has a mixed environment of AIX on POWER4 and POWER5, and x86 based systems running a supported distribution of Linux. There is a total of 7 partitions and three standalone x86 servers. The customer wants to consolidate their applications using a single 4-core POWER6 server. What is the minimum PowerVM edition that supports the customer requirement?()A
PowerVM Lx86B
PowerVM Express EditionC
PowerVM Standard EditionD
PowerVM Enterprise Edition
考题
单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A
Order a POWER5 HMCB
Connect to the existing HMCC
Install an 8-port asynchronous card in the managed server to connect to the existing HMCD
Install an additional network card to the existing HMC and connect to the POWER5 service processor
热门标签
最新试卷