单选题
Before the oily water is installed on board ships, it must have ()
A
IOPP
B
type approval certificate
C
cargo ship safety equipment certificate
D
cargo ship safety certificate
参考答案
参考解析
解析:
暂无解析
更多 “单选题Before the oily water is installed on board ships, it must have ()A IOPPB type approval certificateC cargo ship safety equipment certificateD cargo ship safety certificate” 相关考题
考题
During the PSC inspection, under the provision of SOLAS74, which one may not be regarded as clear grounds for ships' detainment?A.excess amount of oily-water mixtures in bilgesB.insulation of piping including exhaust pipes in engine room contaminated by oilC.improper operation of bilge pumping arrangementsD.paint peeling off the uptake
考题
When started, a complete oily water separating unit is first filled ______. The oily water mixture is then pumped through the inlet pipe into the coarse separating compartment.A.with dirty waterB.with clean waterC.by oily waterD.by mixed water
考题
A certificated lifeboatman assigned to command the lifeboat must ______.A.be the first individual to board the craftB.drain the hydraulic pressure before lowering the craftC.have a list of the persons assigned to the liftboatD.all of the above
考题
Under regulation 6(2) of MARPOL Annex VI, ships constructed before 19 May 2005 shall be issued with the IAPP Certificate no later than the first scheduled dry docking after 19 May 2005, but in no case later than 19 May 2008. Ships flying the flag of a State which is not a Party to MARPOL Annex VI and which do not carry an IAPP Certificate after the above dates should be treated in accordance with chapter 3 of these Guidelines. Which deficiency listed below may not cause the detention of the vessel by PSC inspection?()A、Absence of valid IAPP Certificate, EIAPP Certificates or Technical FilesB、A diesel engine, with a power output of more than 130 kW, which is installed on board a ship constructed on or after 1 January 2000, or a diesel engine having undergone a major conversion on or after 1 January 2000, which does not comply with the NOx Technical CodeC、the sulphur content of any fuel oil being used on board exceeds 4.5% m/mD、An incinerator installed on board the ship before 1 January 2000 does not comply with requirements contained in appendix IV to the Annex, or the standard specifications for shipboard incinerators developed by the Organization (resolutions MEPC.76(40) and MEPC.93(45))
考题
An administrator has just finished physically replacing the system board in a Windows domain controller. Which of the following must be done before booting the server back into Windows?()A、Update the time and date in the BIOS.B、Update the firmware on the SCSI controller.C、Update the firmware to the latest version.D、Configure IPMI on the new board.
考题
单选题Placing a filter on the () of an oily water separator will "polish" the discharge but overloading must be avoided.A
suction sideB
discharge sideC
by-pass pipeD
sampling pipe
考题
单选题Which of the equipment listed is most effective in processing bilge slops for overboard discharge?()A
100PPM oily water separatorB
Assembling the lube oil purifier as a separator and aligning bilge overboardC
A 15PPM oily water separatorD
A magnetic duplex strainer
考题
单选题Before loading bulk grain,bilge wells must be covered to().A
add strength to the bilge well strainerB
permit rapid flow of water to the bilge wellsC
prevent cargo sifting into the bilge wellsD
prevent oil,water,or other liquid from reaching the cargo
考题
单选题Upon arrival at a port, a vessel is not allowed () her ballast water, tanker washings or bilge water and other oily water at will.A
to dischargeB
to be dischargedC
dischargingD
being discharged
考题
单选题A new ocean going ship of 2000 gross tons having an inoperative oily water separator may dispose of its bilge slops by ().A
holding its slops onboard until they can be pumped into the city sewer systemB
circulating them through the lube oil purifier to remove water and debrisC
holding its slops onboard until they can be discharged to a shore side reception facilityD
pumping them into a settling tank for separation before pumping the oily water residue overboard
考题
单选题An administrator must verify all filesets are completely installed before an upgrade. Which of the following commands will perform this task()A
Islpp -vB
Ippchk -vC
installp -vD
instfix -v
考题
单选题Bottom blow valves are installed on auxiliary water-tube boilers to ()A
remove suspended and precipitated solids from the boiler waterB
completely drain the boiler in an emergency situationC
prevent hardened scale deposits in the water drumD
remove floating impurities from the oily water surface
考题
单选题Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include().A
approved oily-water separating equipmentB
a fixed or portable containment system at the shore connectionC
a spare pump in case the main pump is inoperativeD
at least one outlet accessible from the weather deck
考题
单选题Which of the following is wrong about operation of oily water separator?()A
filled with clean water before operationB
keep air cushion in oil collecting space during runningC
check oil level during runningD
clean inner separator with low pressure stream
考题
单选题Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include().A
approved oil-water separating equipmentB
a fixed or portable containment system at the shore connectionC
a spare pump in case the main pump is inoperativeD
at least one outlet accessible from the weather deck
考题
单选题Under regulation 6(2) of MARPOL Annex VI, ships constructed before 19 May 2005 shall be issued with the IAPP Certificate no later than the first scheduled dry docking after 19 May 2005, but in no case later than 19 May 2008. Ships flying the flag of a State which is not a Party to MARPOL Annex VI and which do not carry an IAPP Certificate after the above dates should be treated in accordance with chapter 3 of these Guidelines. Which deficiency listed below may not cause the detention of the vessel by PSC inspection?()A
Absence of valid IAPP Certificate, EIAPP Certificates or Technical FilesB
A diesel engine, with a power output of more than 130 kW, which is installed on board a ship constructed on or after 1 January 2000, or a diesel engine having undergone a major conversion on or after 1 January 2000, which does not comply with the NOx Technical CodeC
the sulphur content of any fuel oil being used on board exceeds 4.5% m/mD
An incinerator installed on board the ship before 1 January 2000 does not comply with requirements contained in appendix IV to the Annex, or the standard specifications for shipboard incinerators developed by the Organization (resolutions MEPC.76(40) and MEPC.93(45))
考题
单选题A certificated lifeboatman assigned to command the lifeboat must().A
be the first individual to board the craftB
drain the hydraulic pressure before lowering the craftC
have a list of the persons assigned to the lifeboatD
All of the above
考题
单选题During inspection of oil and oily mixtures from machinery spaces, which of the following factors should be taken into account by the PSCO? ()A
The quantity of oil residues generatedB
The capacity of sludge and bilge water holding tankC
The capacity of the oily water separatorD
All of the above
考题
单选题The fuel from the bunker tanks must be treated by before entering the service tanks(), from where the fuel enters()A
centrifugal separators; the engine cylinderB
oily water separators; the engine cylinderC
oily water separators; the fuel supply systemD
centrifuges; the fuel supply system
考题
单选题Before the oily water separator put into operation, it should be ()A
filled with bilge waterB
filled with oilC
filled with clean waterD
be emptied
考题
单选题When started, a complete oily water separating unit is first filled ()The oily water mixture is then pumped through the inlet pipe into the coarse separating compartment.A
with dirty waterB
with clean waterC
by oily waterD
by mixed water
考题
单选题The time of discharging oil is short, but oily water separator discharges oil frequentlyThe possible reason is ()A
the sensor of low oil level is fully covered by sludgeB
the coarse strainer before the pump in suction system is cloggedC
the screw pump is worn seriously and volumetric efficiency is decreasedD
bilge suction value is clogged
考题
单选题During the PSC inspection, under the provisions of SOLAS 74, which one may not be regarded as clear grounds for ships’ detainment?()A
excess amount of oily-water mixtures in bilgesB
insulation of piping including exhaust pipes in engine room contaminated by oilC
improper operation of bilge pumping arrangementsD
there were an actual emergency
考题
单选题()are used to ensure that ships don’t discharge oil when pumping out oily water from any oil contaminated space.A
BoilerB
IncineratorC
Oily water separatorD
Sewage treatment unit
考题
单选题When water is used to fight a fire on board a ship,the effect of the weight of the water must be taken into account. How much sea water will increase the weight displacement by one ton?()A
64 cubic feetB
35 cubic feetC
100 gallonsD
500 liters
考题
单选题In which case is the IOPP Certificate of an inspected vessel NOT invalidated? ()A
The required oily-water separator malfunctionsB
The ship is transferred to Liberian registryC
An annual survey is conducted fifteen months after the date of certificate issuanceD
A 15 ppm oily-water separator is replaced by a 100 ppm oily-water separator
热门标签
最新试卷