网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.
A
hardware and software specification
B
system performance specification
C
formal requirements definition
D
general problem statement
参考答案
参考解析
解析:
解析: 初步调研阶段的许多活动在分析阶段仍然要做,但是会比以前更深入地做。在分析阶段,分析师一定要完全清楚最终蓝图并且开发出充分的关于业务环境知识和目前系统的知识以使一个有效的解决方案被提交和实施。除了当前系统的过程和数据的逻辑模型,这一阶段的产出物还包括建议系统的正式需求定义。 参考答案:5:C
更多 “单选题Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.A hardware and software specificationB system performance specificationC formal requirements definitionD general problem statement” 相关考题
考题
Scope Management:A.entails managing the project's work content.B.is a subset of configuration management and as such is performed by CM specialists.C.is concerned with naming all activities performed, the end products which results and the resources consumed.D.is not a concern of the project manager.E.None of the above.
考题
The review for the specification completeness is performed during which of the following cycles.A Award cyclesB requirements cycleC requisition cycleD solicitation cycleE contractual cycle
考题
● Scope Management:A entails managing the project's work content.B is a subset of configuration management and as such is performed by CM specialists.C is concerned with naming all activities performed, the end products which results and the resources consumed.D is not a concern of the project manager.E None of the above.
考题
The target language should be used not only during communicative activities, but also in explaining the activities to the students or in assigning homework.()
此题为判断题(对,错)。
考题
Define Activities is the process of identifying the specific actions to be performed to produce the (71).A.project elementsB.work draftsC.work packageD.project deliverables
考题
● Define Activities is the process of identifying the specific actions tobe performed to produce the (71).(71)A. project elementsB. work draftsC. work packageD. project deliverables
考题
● Many of the activities performed during the preliminary investigation are still being conducted in (71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the (72) and must develop enough knowledge about the (73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (74) for process and data of current system, the deliverable from this phase also includes the (75) for the proposed system.(71)A. analysis phaseB. design phaseC. implementation phaseD. maintenance phase(72)A. main symptomB. root problemC. final blueprintD. data specification(73)A. hardware environmentB. testing environmentC. software environmentD. business environment(74)A. logical modelsB. physical modelsC. design modelsD. implementation models(75)A. hardware and software specificationB. system performance specificationC. formal requirements definitionD. general problem statement
考题
What activities can you participate in during the trip?A Working as an advisory.B Learning German language.C Travelling with a guest familyD Enjoying sports and entertainments
考题
(b) Explain the principal audit procedures to be performed during the final audit in respect of the estimatedwarranty provision in the balance sheet of Island Co as at 30 November 2007. (5 marks)
考题
Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.A.analysis phaseB.design phaseC.implementation phaseD.maintenance phase
考题
As activities are usually carried __ during one’s spare time, leisure has the following functions: relaxation, recreation and entertainment, and personal development.
考题
Examine the following RMAN script:Which statement describes the purpose of the script?()
A. The data file is checked for physical corruption and backed up if found clean.B. The backup of data file 5 is performed and the interactive messages during the backup are suppressed.C. The existing backup for the data file is checked and the backup is performed if there are changes in the data file after the last backup.D. The backup of data file 5 is performed and all SQL statements that are executed during RMAN compilation and their results are displayed
考题
You want to analyze a SQL Tuning Set (STS) using SQL Performance Analyzer in a test database. Which two statements are true regarding the activities performed during the test execution of SQLs in a SQL Tuning Set?()A.Every SQL statement in the STS is considered only once for executionB.The SQL statements in the STS are executed concurrently to produce the execution plan and execution statisticsC.The execution plan and execution statistics are computed for each SQL statement in the STSD.The effects of DDL and DML are considered to produce the execution plan and execution statistics
考题
Examine the following RMAN script:RMAN run {debug on;allocate channel c1 type disk;backup datafile 5;}Which statement describes the purpose of the script?()
A. The data file is checked for physical corruption and backed up if found clean.B. The backup of data file 5 is performed and the interactive messages during the backup are suppressed.C. The existing backup for the data file is checked and the backup is performed if there are changes in the data file after the last backup.D. The backup of data file 5 is performed and all SQL statements that are executed during RMAN compilation and their results are displayed
考题
Many of the activities performed during the preliminary investigation are still being conducted in( ), but in much greater depth than before. During this phase, the analyst must become fully aware of the ( )and must develop enough knowledge about the ( ) and the existing systems to enable an effective solution to be proposed and implemented. Besides the (4)for process and data of current system, the deliverable from this phase also includes the ( )for the proposed system.
(4)应选( )。
A. logical moD.els
B. physical moD.els
C. D.esign moD.els
D.. implementation moD.els
考题
Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
考题
During the systems planning phase. a systems analyst conducts a(请作答此空)activity to study the systems request and recommend specific action. After obtaining an authonzation to proceed. the analyst interacts with( ) to gather facts about the problem of opportunity, project scope and constraints, project benefits, and estimated development time and costs. In many cases. thesystems request does not reveal the underying problem, but only a symptom. A popular technique for investigating causesand effects is called ( )The analyst has analyzed the problem or opportunity. defined the project scope and constraints, and performed ( )to evaluate project usability, costs, benefits, and time constraints. The end product of the activity is ( ) .The main content must include an estimate of time .staffing requrements, costs, benefits, and expected results for the next phase of the SDLCA.case study
B.requirements discovery
C.preliminary investigation
D.business understanding
考题
Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before. A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
考题
You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named DB1 in the instance. At present about 90 GB of data is stored in DB1. You made some rough calculations that every day about 1 GB of data is modified or inserted. You set the recovery model of DB1 to Simple. According to the company requirements, during business hours, data loss of more than 120 minutes worth of transactions is unacceptable. You have to choose a backup strategy which must comply with the following two requirements: Using as little disk space as possible Complying with the company requirements. So what action should you perform to achieve this goal?() A、A full database backup should be performed once daily. During business hour, a transaction log backup should be performed every two hours. B、A full database backup should be performed once daily C、A full database backup should be performed once daily. During business hours, a differential backup should be performed every two hours D、Perform a full database backup should be performed once every week. A differential backup should be performed once daily. During business hours a transaction log backup should be performed every two hours.
考题
单选题Define Activities is the process ofidentifying the specific actions to be performed toproduce the()A
projectelementsB
work draftsC
workpackageD
projectdeliverables
考题
多选题You want to analyze a SQL Tuning Set (STS) using SQL Performance Analyzer in a test database. Which two statements are true regarding the activities performed during the test execution of SQLs in a SQL Tuning Set?()AEvery SQL statement in the STS is considered only once for executionBThe SQL statements in the STS are executed concurrently to produce the execution plan and execution statisticsCThe execution plan and execution statistics are computed for each SQL statement in the STSDThe effects of DDL and DML are considered to produce the execution plan and execution statistics
考题
多选题Which two service components are performed during the wireless implement phase?()Aproject planningBconfiguration managementCwireless readiness assessmentDsystems acceptance testingEsite readiness specification
考题
单选题Examine the following RMAN script: RMAN run { debug on; allocate channel c1 type disk; backup datafile 5; } Which statement describes the purpose of the script?()A
The data file is checked for physical corruption and backed up if found clean.B
The backup of data file 5 is performed and the interactive messages during the backup are suppressed.C
The existing backup for the data file is checked and the backup is performed if there are changes in the data file after the last backup.D
The backup of data file 5 is performed and all SQL statements that are executed during RMAN compilation and their results are displayed
考题
单选题Which of the following is true?A
Both parents and students think school holidays are perfect.B
Parents can take care of their young children during all the holidays.C
Students enjoy taking part in different kinds of activities during the holidays.D
Students don’t like to have school trips to foreign countries during the holidays.
考题
单选题Many companies provide their employees _____ free lunch during the weekdays.A
byB
withC
toD
for
考题
单选题Located in Manhattan, many sightseers like to visit the Empire State building, a massive skyscraper constructed during the Great Depression.A
many sightseers like to visit the Empire State building, a massive skyscraper constructed during the Great DepressionB
the Empire state building, a massive skyscraper constructed during the Great Depression many sightseers like to visitC
and constructed during the Great Depression, many tourists like. to visit the Empire State BuildingD
the Empire State Building is a massive skyscraper, constructed during the Great Depression, that many sightseers like to visitE
a massive skyscraper constructed during the Great Depression, the Empire state Building, is a place that sightseers like to visit
考题
单选题Many of the activities performed during the preliminary investigation are still being conducted in(1),but in much greater depth than before. During this phase, the analyst must become fully aware of the(2)and must develop enough knowledge about the(3)and the existing systems to enable an effective solution to be proposed and implemented. Besides the(4)for process and data of current system, the deliverable from this phase also includes the(5)for the proposed system.A
logical modelsB
physical modelsC
design modelsD
implementation models