网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Due to lapse of time the risk in these areas to surface navigation is now considered ()than the ordinary risks of navigation,but a very real risk still exists with regard to anchoring,fishing or any form of submarine or seabed activity.
A

more serious

B

not less serious

C

more dangerous

D

no more dangerous


参考答案

参考解析
解析: 暂无解析
更多 “单选题Due to lapse of time the risk in these areas to surface navigation is now considered ()than the ordinary risks of navigation,but a very real risk still exists with regard to anchoring,fishing or any form of submarine or seabed activity.A more seriousB not less seriousC more dangerousD no more dangerous” 相关考题
考题 Which of the following areas are addressed in risk identification:A environmentalB technicalC legalD All of the above.E A and B only

考题 36 Which of the following areas are addressed in risk identification:A. environmentalB. technicalC. legalD. All of the above.E. A and B only

考题 3 Project tradeoffs are usually made by comparing _____ and constraints.A. Time, cost, and qualityB. Time, risk, and qualityC. Risk, quality, and manpower availabilityD. Cost, quality, and technical performanceE. Cost, quality, and risk

考题 ● Project tradeoffs are usually made by comparing _____ and constraints.A Time, cost, and qualityB Time, risk, and qualityC Risk, quality, and manpower availabilityD Cost, quality, and technical performanceE Cost, quality, and risk

考题 The surface of some areas consists______(large)of high mountains and deep valley.

考题 ______assesses the priority of identified ri sks using their probability of occurring,the corresponding impact on project objectives if the risks do occur,as well as other factors such as the time frame. and risk tolerance of the project constraints of cost,schedule,scope,and quality.A.Quantitative Risk AnalysisB.Qualitative Risk AnalysisC.Enterprise Environmental FactorsD.Risk Management Plan

考题 The most crucial time for project risk assessment is (75) .A.when a problem surfacesSXB The most crucial time for project risk assessment is (75) .A.when a problem surfacesB.during the planning phaseC.during the close-out phaseD.after the project schedule has been published

考题 Which two statements are true by default of a multilevel IS-IS network?() A. Level 1 only routers see routes contained in their area.B. Level 1 routers route towards Level 2 routers due to the attached bit.C. Level 2 routers route towards Level 1 routers due to the attached bit.D. Level 2 routers can see routes in other Level 2 areas and routes originated in Level 1 areas.

考题 Due to lapse of time the risk in these areas to surface navigation is now considered ______ than the ordinary risks of navigation,but a very real risk still exists with regard to anchoring,fishing or any form of submarine or seabed activity.A.more seriousB.not less seriousC.more dangerousD.no more dangerous

考题 Please return the notice to me ______ due time.A.atB.onC.ofD.in

考题 At the same time,it is ______ for you to signify your acknowledgement of the responsibility for the collision by signing the copies of this letter hereto attached and to return me two copies in due time.A.essentialB.importantC.goodD.a better operation

考题 材料:Coastal conditionsThe area described in the volume presents the mariner with a generally adverse combination of navigational factors which are outline below.Local Topography.The Dover Strait is shallow and only is 18 miles wide at its narrowest point.Passage through the strait is further constricted by a series of narrow banks,running NE-SW.The seabed is also littered with wrecks.Natural Conditions.There are strong tidal streams in the strait.Sea level may differ from that predicted and in particular may be lower than expected due to negative tidal surges.The area is also subject to gales and poor visibility.Risk of Collision.There is a high risk of collision caused by the density of vessel traffic on passage through the strait,including deep-draught vessels,and crossing traffic,including ferries and high speed craft.Mine danger area There are two areas off the N coast of France,which remain dangerous because of mines lied in the war of 1939-1945.Due to the lapse of time the risk to surface navigation is now considered to be no more dangerous than that the ordinary risks of navigation but a very real risk still exists with regard to anchoring,fishing or any form. submarine or seabed activity.问题:The crossing traffic in the Dover Strait is probably running ________.A.NE-SWB.SE-NWC.N-SD.E-WIt is implied in the passage that ________.A.mine is not a danger to surface navigation in Dover StraitB.the width of Dover Strait is not so narrowC.the natural conditions in Dover Strait are too serousD.collision with deep-draught vessels or ferries or high speed craft in Dover Strait is hardly avoidableAccording to the passage,the risk of collision in the Dover Strait is caused by ________.A.gales and poor visibilityB.a series of narrow banksC.the density of vessel traffic on passage through the strait and crossing trafficD.a generally adverse combination of navigational factorsIt is inferred that ________.A.although the tidal streams in Dover Strait is strong,there were few ships sunk in itB.most of the wrecks in Dover Strait were deep-draught vessels,ferries and high speed craftC.the wrecks are not dangers to surface navigationD.there were many ships sunk in Dover Strait请帮忙给出每个问题的正确答案和分析,谢谢!

考题 A frontal thunderstorm is caused by ______.A.pronounced local heatingB.wind being pushed up a mountainC.a warm air mass rising over a cold air massD.an increased lapse rate caused by advection of warm surface air

考题 Some areas, () their severe weather conditions, are sparsely populated.A、due toB、but forC、in spite ofD、with regard to

考题 翻译:any lightrage at loading and discharging port to be at charterers’ risk and expenses and time used to count as laytime

考题 ()assesses the priority of identified risks using their probability of occurring, the corresponding impact on project objectives if the risks do occur, as well as other factors such as the time frame and risk tolerance of the project constraints of cost, schedule, scope, and quality.A、Quantitative Risk AnalysisB、Qualitative Risk AnalysisC、Enterprise Environmental FactorsD、Risk Management Plan

考题 For painting, the surface of a ship’s hull is divided into ()areas.A、twoB、threeC、fourD、five

考题 单选题A(n) () is a mechanical attack on the metal surface which may be due to a disturbance in the flow of the water over the blade of the propeller.A erosionB corrosionC pittingD dezincification

考题 单选题Ice blink is().A the dark appearance of the underside of a cloud layer due to reflection of a surface of open waterB the soft light appearance on the underside of a cloud layer due to reflection from a surface of open waterC the yellowish-white glare on the underside of a cloud layerD water sky

考题 单选题A frontal thunderstorm is caused by().A pronounced local heatingB wind being pushed up a mountainC a warm air mass rising over a cold air massD an increased lapse rate caused by advection of warm surface air

考题 单选题Please return the notice to me()due time.A atB onC ofD in

考题 单选题Swell is the rise and fall of the ocean’s surface due to().A fetchB distant windsC local stormsD the pull of the moon

考题 单选题If over a period of time, the oi1 film partially disappears, so that dry areas are formed on the cylinder wall, these areas and the piston surfaces will by frictional interaction, become finely scuffed and hardened, iegood mirror surface" will have deterioratedWhat condition of the piston rings can result in this phenomenon?()A micro-seizureB stickingC scratchedD breakage/collapse

考题 单选题The color of the signal flare sent up by a submarine about to surface due to an emergency condition within the submarine is().A greenB redC whiteD yellow

考题 单选题Surface irregularities, such as erosion and pitting on injection pump plungers, will()A increase ignition delayB affect fuel oil meteringC affect engine performance at low speedD only disappear due to fuel oil abrasion

考题 单选题Any action taken to avoid collision shall,if the circumstances of the case admit,().A be positiveB be positive and made in ample timeC be positive,made in ample time and with due regard to the observance of good seamanshipD be positive,made in ample time,with due regard to the observance of good seamanship and avoiding complying with local regulations

考题 单选题A katabatic wind blows().A up an incline due to surface heatingB in a circular patternC down an incline due to cooling of the airD horizontally between a high and a low pressure area