A fully loaded motor-propelled lifeboat must be capable of attaining a speed of at least().
A
3 knots in smooth water
B
6 knots in smooth water
C
3 knots in rough water
D
6 knots in rough water
参考答案
参考解析
解析:
暂无解析
更多 “单选题A fully loaded motor-propelled lifeboat must be capable of attaining a speed of at least().A 3 knots in smooth waterB 6 knots in smooth waterC 3 knots in rough waterD 6 knots in rough water” 相关考题
考题
We prefer that the plan () before being put into execution.
A.is fully discussedB.must be fully discussedC.be fully discussedD.will be fully discussed
考题
All bus drivers must () their passengers'safety.
A、be responsible forB、be careful ofC、be capable ofD、be strive for
考题
Which statement is true about IBGP routers? ()
A. They must be fully meshedB. They can be in a different ASC . They do not need to be directly connectedD. They must be directly connected
考题
The phrase VESSEL IN BALLAST usually means________.A.the ship is fully loadedB.the ship loaded with waterC.a ship with cargoD.a ship with no cargo
考题
It has been decided that to be lawful merchandise, goods loaded under the charter-party must not only be such as can be loaded without breach of the law in force at the port of loading, but must also be such as can lawfully be carried and discharged at the ________ .A.port of dischargeB.port of sailingC.port of flagD.port of departure
考题
What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill?A.Which survival craft was used in the drillB.The number of each lifeboat not lowered during each drillC.Only the number of each motor propelled lifeboat that is loweredD.The length of time an oar propelled lifeboat is rowed
考题
The number of rowing oars that must be carried in a motor-propelled open lifeboat on a cargo vessel is ______.A.determined by the MasterB.specified by the Coast GuardC.specified by the manufacturerD.None
考题
If a container which has not been filled,packed,stuffed or loaded by the Carrier is delivered by the Carrier with the seal ______,such delivery shall be deemed as full and complete performance of the Carrier's obligation.A.IntactB.Properly usedC.PerfectD.Fully sized
考题
______ of the following statements is(are)correct regarding motor lifeboats on cargo vessels.① The motor of each lifeboat shall be operated in the ahead and astern position for a period of not more than 5 minutes once in each week;② The fuel tank of all motor-propelled lifeboats shall be emptied and the fuel changed at least once in every year.A.① onlyB.② onlyC.Both ① and ②D.Neither ① nor ②
考题
The governor brake shall be capable of controlling the speed of lowering a fully equipped lifeboat with its complement of persons on board at ______.A.safe speed only specifiedB.not less than 120 feet per minuteC.not more than 120 feet per minuteD.not more than 90 feet per minute
考题
Before leaving the harbour, all derricks must be ()properly.A、tightenedB、securedC、unfastenedD、loaded
考题
Which statement is true about IBGP routers? ()A、They must be fully meshedB、They can be in a different ASC、They must be directly connected
考题
Following a successful migration,it is highly recommended that concurrent Volume Groups be Converted to enhanced concurrent capable Volume Groups. In order to follow this recommendation,what step must be completed first?() A、 The Volume Groups must be changed with chvg -E vgname.B、 The Volume Groups must be a member of a resource group and must be varied on al nodes of the cluster.C、 The Volume Groups must be a member of a resource group and must be varied off all nodes of the cluster.D、 The Volume Grups cannot be changed to enhanced concurrent capable because they must be recreated with mkvg -C vgname.
考题
单选题According to the Code of Federal Regulations,on vessels other than river ferryboats and river vessels,how are periodic lifeboat weight tests required to be conducted?()A
The lifeboat is lowered to near the water,loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsB
The lifeboat is loaded with the allowed capacity,lowered into the water until afloat,then released from the fallsC
The lifeboat is lowered into the water until afloat,loaded with the allowed capacity,then released from the fallsD
The lifeboat is lowered to near the water,loaded with the allowed capacity,then released from the falls
考题
单选题The number of rowing oars that must be carried in a motor-propelled open lifeboat on a cargo vessel is().A
determined by the MasterB
specified by the Coast GuardC
specified by the manufacturerD
None
考题
单选题The governor brake shall be capable of controlling the speed of lowering a fully equipped lifeboat with its complement of persons on board at().A
safe speed only specifiedB
not less than 120 feet per minuteC
not more than 120 feet per minuteD
not more than 90 feet per minute
考题
单选题The less the surface of the ground yields to the weight of a fully-loaded truck ______ to the truck.A
the greater stress isB
greater is the stressC
the stress is greaterD
the greater the stress
考题
单选题When a ship is fully loaded, it needs to prevent the main engine to be().While a ship is fully empty, it needs to prevent the main engine to be().A
overspeed;overloadB
overload;overspeedC
over mechanical load;over thermal loadD
over torque;overspeed
考题
单选题What must the Master or person in charge of a ship enter in the logbook after conducting a boat drill? ()A
Which survival craft was used in the drillB
The number of each lifeboat not lowered during each drillC
Only the number of each motor propelled lifeboat that is loweredD
The length of time an oar propelled lifeboat is rowed
考题
单选题It should be apparent that little or nothing is gained by opening a drain at the same time as or after admitting steamThe above sentence probably means ().A
There is apparent condensate in pipingB
The steam is not discovered after admitting steamC
The condensate should be fully loaded in the piping as admitting steamD
The condensate should be fully drained from the piping while admitting steam
考题
单选题Which statement is true about IBGP routers? ()A
They must be fully meshedB
They can be in a different ASC
They must be directly connected
考题
单选题What must be configured prior to the first commit after factory defaults are loaded?()A
root authenticationB
default gatewayC
hostnameD
management services
考题
单选题Following a successful migration,it is highly recommended that concurrent Volume Groups be Converted to enhanced concurrent capable Volume Groups. In order to follow this recommendation,what step must be completed first?()A
The Volume Groups must be changed with chvg -E vgname.B
The Volume Groups must be a member of a resource group and must be varied on al nodes of the cluster.C
The Volume Groups must be a member of a resource group and must be varied off all nodes of the cluster.D
The Volume Grups cannot be changed to enhanced concurrent capable because they must be recreated with mkvg -C vgname.
考题
单选题Your tank vessel is fully loaded, and you find that she is down slightly by the head. To adjust the trim, you may().A
add ballast aftB
load more cargo aftC
shift cargo aftD
All of the above
考题
单选题Which statement concerning the handling characteristics of a fully loaded vessel as compared with those of a light vessel is FALSE?()A
A fully loaded vessel will be slower to respond to the enginesB
A fully loaded vessel will maintain her headway furtherC
A light vessel will be more affected by the windD
A light vessel lose more rudder effect in shallow water
考题
单选题What must be configured prior to the first commit after factory defaults are loaded?()A
root authenticationB
default gatewayC
host nameD
management services
考题
单选题What is required by regulations concerning the stowage of lifeboats on cargo vessels?()A
Each lifeboat must have a launching applianceB
Launching appliances must be of the gravity typeC
There may not be more than two launching appliances on the same deckD
All of the above