网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
Heavy cargo might break ()cargo, so it can’t be stowed on top of it.
A

light

B

bulk

C

dangerous

D

wet


参考答案

参考解析
解析: 暂无解析
更多 “单选题Heavy cargo might break ()cargo, so it can’t be stowed on top of it.A lightB bulkC dangerousD wet” 相关考题
考题 Never______stowed like this.A.optional cargo should beB.should optional cargo beC.should be optional cargoD.optional cargo must be

考题 The Emergency Position Indicating Radiobeacon on a cargo vessel must be stowed ______.A.in an inside passagewayB.in an approved bracketC.so that it is accessible from the bridge of the vesselD.so that it will float free if the vessel sinks

考题 A Master should file a marine note of protest if ______.A.cargo was received at ship side which was damaged in land transitB.longshore labor went on strike in the port causing undue vessel delayC.portions of his vessel's cargo were illegally impounded in a foreign portD.the vessel encountered heavy weather which might have caused cargo damage

考题 Overcarriage is best prevented by ______.A.assuring heavy cargo is stowed low in the vesselB.checking the vessel's load line calculations carefullyC.inspection of the hold at completion of dischargeD.stowing the cargo which is to be discharged last on the bottom

考题 By the stowage factor,when given a certain volume of space,we know ______.A.The space of the shipB.The space of one holdC.What kind of cargo can be stowedD.How much cargo can be stowed

考题 干货通常被装载到货舱里。()A、Dry cargo is usually stowed in the hold.B、Dry cargo is usually stowed at the hatch.C、Wet cargo is usually stowed in the hold.

考题 Heavy cargo might break ()cargo, so it can’t be stowed on top of it.A、lightB、bulkC、dangerousD、wet

考题 重吊杆用于吊大的重件。()A、Heavy derrick is used for lifting large heavy cargo.B、Derrick is used for lifting large heavy cargo.C、Heavy derrick is used for lifting dry bulk cargo.D、Derrick is used for lifting dry bulk cargo.

考题 The ()(重吊杆) can lift heavy cargo.A、heavy cargo derrickB、heavy deckC、jumbo boomD、heavy block

考题 湿货要远离干货。()A、Wet cargo must be kept away from dry cargo.B、Heavy cargo must be kept away from dry cargo.C、Light cargo must be kept away from dry cargo.D、Wet cargo must be kept away from light cargo.

考题 Is this()longer or shorter?A、cargo wireB、wire cargoC、wire of cargoD、heavy cargo

考题 ()(湿货)must be kept away from dry cargo.A、Light cargoB、Wet cargoC、Heavy cargoD、Deck cargo

考题 ()(重)cargo might break fragile cargo.A、ContainerB、DangerousC、HeavyD、Light

考题 货钩()A、cargo chainB、cargo trayC、cargo hookD、can hook

考题 ()must be kept away from dry cargo.A、Light cargoB、Wet cargoC、Heavy cargoD、Bulk cargo

考题 单选题The ()(干货船 )can’t carry wet cargo.A liquid cargo shipB drummed cargoC dry cargo shipD barge

考题 单选题The ()(重吊杆) can lift heavy cargo.A heavy cargo derrickB heavy deckC jumbo boomD heavy block

考题 单选题The ship is now too much listing to portside. Which is the best way to keep the vessel upright?().A Put all the remaining cargo on starboard sideB Put light cargo on starboardside and heavy cargo on port sideC Put light cargo on port side and heavy cargo on starboard sideD A,B,C are all correct

考题 单选题A cargo of refrigerated fruit is packed in crates with transverse members dividing the crate in two equal parts. Which statement is TRUE?()A The cargo block should be tightly packed if the cargo is suitably chilled upon delivery to the vesselB Both sides of each crate must be checked for the temperature and the appearance of the fruitC The cargo block should be stowed with air channels built throughout the stowed cargoD The crates should NEVER be stowed brick fashion

考题 单选题重吊杆用于吊大的重件。()A Heavy derrick is used for lifting large heavy cargo.B Derrick is used for lifting large heavy cargo.C Heavy derrick is used for lifting dry bulk cargo.D Derrick is used for lifting dry bulk cargo.

考题 单选题By the stowage factor, when given a certain volume of space, we know().A the space of the shipB the space of one holdC what kind of cargo can be stowedD how much cargo can be stowed

考题 单选题Never()stowed like this.A optional cargo should beB should optional cargo beC should be optional cargoD should optional cargo

考题 单选题干货通常被装载到货舱里。()A Dry cargo is usually stowed in the hold.B Dry cargo is usually stowed at the hatch.C Wet cargo is usually stowed in the hold.

考题 单选题The jumbo boom can ().A lift heavy cargoB load and unloadC join ropes togetherD lift light cargo

考题 单选题Which statement is TRUE concerning the tandem working arrangement of pedestal cranes when completing a quad lift? ()A The discharge is slow due to the size of the cargo and all the cranes working togetherB The cargo discharge can be accomplished with controlled pendulationC The cargo discharge can be performed in port or at anchorD The cranes enable the handling of heavy cargos without shoreside assistance

考题 单选题0vercarring is best prevented by().A assuring heavy cargo is stowed low in the vesselB checking the vessel's load line calculations carefullyC inspection of the hold at completion of dischargeD stowing the cargo which is to be discharge last on the bottom

考题 单选题Overcarriage is best prevented by().A assuring heavy cargo is stowed low in the vesselB checking the vessel's load line calculations carefullyC inspection of the hold at completion of dischargeD stowing the cargo which is to be discharged last on the bottom

考题 单选题Strong smelling cargo should be stowed()the cargo absorbing foreign smell.A together withB on top ofC underneathD away from