网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()
A
the space for the upgrade to a DS8700
B
the space on the left of the DS8000 for an expansion frame
C
the space on the right of the DS8000 for an expansion frame
D
the space to install additional DDMs in the base frame
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()A the space for the upgrade to a DS8700B the space on the left of the DS8000 for an expansion frameC the space on the right of the DS8000 for an expansion frameD the space to install additional DDMs in the base frame” 相关考题
考题
A customer would like to convert their existing IBM System Storage DS8100 to a DS8700 to gain more capacity. During the TDA review the impact on the running production environment during conversion is discussed. Which of the following must be considered?()A. DS8000 model conversions are generally non-disruptiveB. a model conversion from DS8100 to DS8700 is disruptiveC. the DS8100 base frame needs to be sent back to the factory for upgradeD. during model conversion the logical configuration can be kept, but the system must be rebooted
考题
A bank has requested proposals for a storage solution to implement disaster recovery processes for their IBM System z configured with Linux, IBM System p configured with AIX, and Microsoft Windows environments. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, and FlashCopy. Floor space is limited.What hardware platform provides this native support?()A. IBM XIV Storage SystemB. IBM System Storage DS5300C. IBM System Storage DS8800D. IBM System Storage DS5020 with SVC
考题
A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()A、Two IBM System Storage DS8100 systemsB、One IBM System Storage DS8300 with two LPARsC、Two IBM System Storage DS6800 systems in a single rackD、One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows
考题
A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A、MRPDPlus toolB、Inventory ServicesC、PCRS6000 Portable ConfiguratorD、eConfig - IBM Configurator for e-Business
考题
An IBM Business Partner suggests an IBM System Storage DS8000 to a customer with a SAN that is now configured with an EMC Symmetrix subsystem disk. The customer wants to determine if new HBAs and software upgrades are needed on the servers if the EMC storage is replaced by the DS8000 What document must be carefully read to help address the customer’s concerns()A、IBM System Storage DS8000: Host Systems Attachment GuideB、DS8000 Interoperability MatrixC、IBM System Storage DS8000: Introduction and Planning GuideD、IBM System Storage Solution Handbook
考题
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?
考题
A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers. What is the best document the Business Partner can suggest to accomplish this requirement()A、the IBM System Storage DS8000 Interoperability MatrixB、the IBM System Storage DS8000 Introduction and Planning GuideC、the IBM System Storage DS8000 Host System Attachment GuideD、the IBM System Storage DS8000 User’s Guide
考题
A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()A、the space for the upgrade to a DS8700B、the space on the left of the DS8000 for an expansion frameC、the space on the right of the DS8000 for an expansion frameD、the space to install additional DDMs in the base frame
考题
A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()A、use Storage Manager to export the system profileB、create a configuration ineConfig and provide proof of purchaseC、use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configurationD、have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration
考题
A mainframe customer wants to add additional disk capacity to an IBM System Storage DS8100to accommodate a projected workload increase. They ask the storage specialist to assess theimpact of the additional capacity on the DS8100 without other upgrades. Which tool bestassesses the impact of the upgrade on response times?()A、Capacity MagicB、TPC for DiskC、RMF disk reportsD、Disk Magic
考题
An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()A、purchasing customerB、IBM Installation Readiness TeamC、IBM Customer EngineerD、IBM Business Partner
考题
A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw capacity. They are convinced that 450 GB is the optimum size for their business applications. There is limited space available for additional machines in the data center. Which solution meets best this requirement()A、DS8700 system with three framesB、DS8800 system with threeframeC、DS8700 system with two framesD、DS8800 system with two frames
考题
A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution best meets the specified requirements()A、two IBM System Storage DS8100 systemsB、one IBM System Storage DS8300 with LPARC、two IBM System Storage DS6800 systems in a single rackD、one IBM System Storage DS6800
考题
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs
考题
A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()A、during the Technical Delivery and AssessmentB、during installation of the equipmentC、prior to delivery of the XIVD、during the solution proposal
考题
单选题A mainframe customer wants to add additional disk capacity to an IBM System Storage DS8100to accommodate a projected workload increase. They ask the storage specialist to assess theimpact of the additional capacity on the DS8100 without other upgrades. Which tool bestassesses the impact of the upgrade on response times?()A
Capacity MagicB
TPC for DiskC
RMF disk reportsD
Disk Magic
考题
单选题A bank has requested proposals for a storage solution to upgrade their disaster recovery processes for their IBM System z, UNIX, and Microsoft Windows environment. The solution must simulate a multi-site environment and provide the customer the ability to evaluate Metro Mirror, Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution best meets the specified requirements()A
two IBM System Storage DS8100 systemsB
one IBM System Storage DS8300 with LPARC
two IBM System Storage DS6800 systems in a single rackD
one IBM System Storage DS6800
考题
单选题A customer has an IBM System Storage DS5000 and needs to add more disk drives to the unit.There is no record of the configuration for this machine. How can the configuration be retrieved soan upgrade can be configured?()A
use Storage Manager to export the system profileB
create a configuration ineConfig and provide proof of purchaseC
use the IBM Standalone Systems Configuration Tool (SSCT) to recreate the configurationD
have the customer contact the IBM AAS coordinator to retrieve a copy of the originalconfiguration
考题
单选题A customer has an existing SP system and needs to add cards to some of the nodes. Which of the following applications must be used to configure the upgrade?()A
MRPDPlus toolB
Inventory ServicesC
PCRS6000 Portable ConfiguratorD
eConfig - IBM Configurator for e-Business
考题
单选题A Business Partner has proposed an IBM System Storage DS8700 that will have several AIX, Windows, and Sun Solaris servers attached via SAN. The customer has asked for detailed documentation on the steps needed to install the latest adapter drivers. What is the best document the Business Partner can suggest to accomplish this requirement()A
the IBM System Storage DS8000 Interoperability MatrixB
the IBM System Storage DS8000 Introduction and Planning GuideC
the IBM System Storage DS8000 Host System Attachment GuideD
the IBM System Storage DS8000 User’s Guide
考题
单选题An IBM Business Partner sells an IBM System Storage DS8700 to a customer. Who is responsible for the installation and set up of the storage server()A
purchasing customerB
IBM Installation Readiness TeamC
IBM Customer EngineerD
IBM Business Partner
考题
单选题A customer would like to implement an IBM System Storage DS8000 solution that requires 225 TB raw capacity. They are convinced that 450 GB is the optimum size for their business applications. There is limited space available for additional machines in the data center. Which solution meets best this requirement()A
DS8700 system with three framesB
DS8800 system with threeframeC
DS8700 system with two framesD
DS8800 system with two frames
考题
单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A
What are Disaster RecoveryplansB
What are plans for datamigrationC
What storage system space isavailableD
DoesiSCSI meet the needs
考题
单选题A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A
What are the plans for Disaster Recovery? B
What are the plans for data migration? C
Would iSCSI meet your needs? D
How much space is available in the current storage systems?
考题
单选题A customer would like to convert their existing IBM System Storage DS8100 to a DS8700 to gain more capacity. During the TDA review the impact on the running production environment during conversion is discussed. Which of the following must be considered?()A
DS8000 model conversions are generally non-disruptiveB
a model conversion from DS8100 to DS8700 is disruptiveC
the DS8100 base frame needs to be sent back to the factory for upgradeD
during model conversion the logical configuration can be kept, but the system must be rebooted
考题
单选题A customer has an IBM System Storage DS8100 with 128 DDMs and needs to add additional capacity. What must be verified by the Business Partner during the visit to the computer room()A
the space for the upgrade to a DS8700B
the space on the left of the DS8000 for an expansion frameC
the space on the right of the DS8000 for an expansion frameD
the space to install additional DDMs in the base frame
考题
单选题A Business Partner is proposing the installation an IBM XIV Storage System at a customer location. What is the best time to discuss floor space requirements for the solution()A
during the Technical Delivery and AssessmentB
during installation of the equipmentC
prior to delivery of the XIVD
during the solution proposal
考题
单选题A bank has requested proposals for a storage solution to upgrade their disaster recoveryprocesses for their System z, UNIX, and Microsoft Windows environment. The solution mustsimulate a multi-site environment and provide the customer the ability to explore Metro Mirror,Global Mirror, Global Mirror for z/OS, and FlashCopy. Floor space is limited. Which solution bestmeets the specified requirements?()A
Two IBM System Storage DS8100 systemsB
One IBM System Storage DS8300 with two LPARsC
Two IBM System Storage DS6800 systems in a single rackD
One IBM System Storage DS6800 for System z, and SVC for UNIX and Windows
热门标签
最新试卷