网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()
A
Include a new HMC in the order to connect to the p5 595
B
Include a pair of new HMCs in the order to connect to the p5 595
C
Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilities
D
Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
参考答案
参考解析
解析:
暂无解析
更多 “单选题Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A Include a new HMC in the order to connect to the p5 595B Include a pair of new HMCs in the order to connect to the p5 595C Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities” 相关考题
考题
Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A、APV, AIX5.2ML4B、AIX5.3 or i5/OSC、APV, i5/OS, AIX5.3D、APV, AIX5.3 or SuSE9
考题
A healthcare provider has two applications that they need to redundantly protect in a SAN environment. Their patient record application runs on Oracle 11i and consists of many small, randomly accessed files. The database is kept on three clustered Sun servers and currently uses 30 TB of data space. Their imaging application that retains and manages x-rays, consists of Filenet, CommonStore, and TSM running on an IBM Power750 server, and is currently using 65 TB of data space. Which of the following disk solutions meets the customer’s requirement()A、IBM System Storage DS8700 2 wayB、IBM System Storage DCS9900C、IBM System Storage DS8700 4 wayD、IBM XIV Storage System
考题
A small business currently has four separate servers, three of which perform low-overhead tasks with small memory footprints. How could the company BEST reduce power consumption among these four servers, while not sacrificing functionality?()A、Enable each server’s Cool ’n’ Quiet and/or SpeedStep functionality so that processing power is conserved.B、Enforce auto-shutdown routines on all four servers for after-hours power saving while the office is closed.C、Consolidate the four servers onto the best two,combining them logically by tasks and memory consumption.D、Consolidate the four servers onto the most powerful machine using virtualization.
考题
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
考题
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
考题
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers.Which of the following would be most appropriate to ask first?()A、What are the plans for Disaster Recovery? B、What are the plans for data migration? C、Would iSCSI meet your needs? D、How much space is available in the current storage systems?
考题
A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A、The p5-570 Express can support DDR2 memory.B、The p650 and p5-570 Express provide faster processors.C、The p5-570 Express is limited to eight 1.5GHz processors.D、Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
Companycom currently has three p650 servers in their environment and they are implementing a p5 595. The p650 servers are running in an SMP environment, but are connected to a pair of HMCs. In order to follow best practices in the enterprise server environment and maintain HMC connectivity to the p650s, what else will needs to be ordered in addition to the p5 595?()A、Include a new HMC in the order to connect to the p5 595B、Include a pair of new HMCs in the order to connect to the p5 595C、Include a media set for POWER5 HMC in the order to upgrade one of the existing HMC’s to POWER5 capabilitiesD、Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC to POWER5 capabilities Include a media set for POWER5 HMC in the order to upgrade both of the existing HMC? To POWER5 capabilities
考题
A customer is buying 10 new Power 720 servers and will integrate them into their existing data center which also has two Power 595s and five Power 750s, taking the total number of systems to 17. All currently installed systems are managed by a single HMC.All the machines will have dual VIO Servers for redundancy, and 10 client LPARs. How can they manage the new machines for the least cost?()A、Purchase a second HMC and use this to manage the new servers.B、Connect all of the new servers to the existing private HMC network.C、Configure a second private network on their existing HMC for the new servers.D、Connect 9 of the new servers to the existing HMC and use Integrated Virtualization Manager on the 10th.
考题
During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?() A、 Only one application server per resource group can be monitored.B、 Process monitoring is part of RSCT and requires no special scripts.C、 Any application can be monitored as long as it has an application server.D、 Having all application servers in one resource group improves recovery time.
考题
A space-constrained customer is currently running AIX 5.2 on a number of p650 servers and a pair of new p5-550 servers. They have four identical new applications each requiring a minimum of seven processors and 96GB of memory. Which solution would best meet the customer’s requirements?()A、Two p670 serversB、Four p650 serversC、Two p5-570 serversD、Four p5-550 servers
考题
A customer currently has a large group of older 1U servers. Each dedicated to aunique application. Quick provisioning of the servers is important to the customer. Which of the following approaches addresses this situation?()A、VirtualizationB、Replace each server with energy efficient serversC、Upgrade in place to improve performanceD、Implement BladeCenter
考题
A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A、Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB、Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC、Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD、Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
考题
A customer has the following non-virtualized servers: - three Exchange servers, each with 2.8 TB database - five System i Domino servers, each with 2 TB database - 20 TB usable capacitySun/SAP cluster - 70 TB usable capacity of System p requirement - annual growth rate of 12 TB usable capacity per year What is the most cost-effective solution for three years()A、IBM System Storage DS5020 with 300 GB drivesB、IBM System Storage DS5300 with 300 GB drivesC、IBM System Storage DS8700 with 300 GB drivesD、IBM System Storage DS5020 with 1 TB SATA drives
考题
A company has recently placed an order for a POWER4+ p650 server. Their facilities manager has approached the pSeries technical specialist to gather information on the correct power receptacle for thenew server. They have requested a picture of the power cord plug to show to their electrician. Where would the pSeries technical specialist find the required information?()A、Sales ManualB、Announcement LetterC、POWER4+ p650 Specification SheetD、Site and Hardware Planning Information Manual
考题
Companycom has a requirement for an LPAR in their p5 595 to run SUSE Linux. They also require an adapter that is not currently supported in Linux. Which of the following would be the best solution to recommend?()A、Assign the adapter to an IO Hosting partitionB、Use AIX 5L affinity to move the application from SUSE to AIXC、Use AIX 5.3 drivers to install the adapter in the Linux LPARD、Assign the adapter to an AIX 5.3 partition running Linux Affinity
考题
A customer has a combination of fifteen Windows file servers with direct attached storage and three Power Systems with AIX database servers SAN attached to a DS4700. They would like to upgrade and plan for 40 TB capacity. The customer needs to move to a more scalable storage system to include all servers. Which of the following would be most appropriate to ask first?()A、What are Disaster RecoveryplansB、What are plans for datamigrationC、What storage system space isavailableD、DoesiSCSI meet the needs
考题
A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()A、A DS4300 Turbo with Fibre Attached Tape LibraryB、A DS4500 with EXP700’s and Fibre Attached Tape LibraryC、A DS4500 with EXP710’s and Fibre Attached Tape LibraryD、A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
考题
You are the network administrator for TestKing. All network servers run Windows Server 2003. You administer a server named TestKing76. You need to configure TestKing76 to function as a streaming media server for TestKing.com's content team. The content team wants TestKing76 to provide the fastest performance and the most available space possible. Redundancy is not import. TestKing76 currently has three identical, unpartitioned hard disks available. You need to configure the disks to meet the content team's requirements. What should you do?()A、Create a simple volume on disk and then expand it to the other two disks.B、Create a mirrored volume that uses two of the disks.C、Create a RAID-5 volume that uses all three disks.D、Create a striped volume that uses all three disks.
考题
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A
An IBM BladeCenter H chassis for the JS22 Blade serversB
A concurrent KVM daughter cardC
A pair of IBM BladeCenter Power SuppliesD
A second Management Module
考题
单选题A customer requires an 8-way 16GB AIX system. They are evaluating the following three systems: ? p5-570 ? p5-570 Express ? p650 The pSeries technical specialist has been asked to explain the pros and cons of the three solutions. What information will help the customer decide on the best solution for their environment?()A
The p5-570 Express can support DDR2 memory.B
The p650 and p5-570 Express provide faster processors.C
The p5-570 Express is limited to eight 1.5GHz processors.D
Neither the p5-570 nor the p5-570 Express supports Capacity on Demand.
考题
单选题Companycom has a requirement to consolidate six web application servers. There is unused capacity of 2 CPUs on their new p5 570. Which operating systems and or features are required?()A
APV, AIX5.2ML4B
AIX5.3 or i5/OSC
APV, i5/OS, AIX5.3D
APV, AIX5.3 or SuSE9
考题
单选题Companycom has a p690 and currently has eight LPARs. They have purchased a p5 590 and wish to migrate their eight LPARs to the new server. The LPARs are running either AIX 5.2 or AIX 5.3 with the current maintenance. What is the LEAST disruptive method for this activity?()A
New install of AIXB
Migrate the 7040-61DC
Utilize alt_disk_installD
Use the enterprise back up strategy
考题
单选题A customer has a p650 on order and plans to put it in a current OEM rack. They are concerned that the p650 power supply may demand more current than the OEM PDU can provide. Which planning guide specification would provide the necessary requirements?()A
VoltageB
FrequencyC
Power Source Loading (max)D
Power Source Loading (typical)
考题
单选题A banking customer has the following requirements for an IBM BladeCenter solution with high speed fibre channel: (1)four 4-socket Microsoft SQL servers with two hot swap SAS drives (2)two physical Microsoft Active Directory Servers (3)twenty-two physical Citrix servers (4)three physical Web servers (5)one physical vCenter server (6)eight vSphere hosts Which configuration minimally satisfies these requirements?()A
Three IBMBladeCenter S chassis, three Brocade Fibre modules, six Ethernet modulesB
Three IBMBladeCenter E chassis, three Brocade Fibre modules, six Ethernet modulesC
Four IBMBladeCenter H chassis, four QLogic Fibre Channel modules, eight Ethernet modulesD
Three IBMBladeCenter H chassis, three QLogic Fibre Channel modules, six Ethernet modules
考题
多选题Identify three situations in which you would NOT be able to drop a tablespace. ()Awhen the tablespace is onlineBwhen the tablespace has segments with data in itCwhen the tablespace is a default permanent tablespace for the databaseDwhen the tablespace contains a table that is currently being used by transactionsEwhen the tablespace contains undo data that is needed to rollback an uncommitted transaction
考题
单选题A customer has six Windows 2003 servers, three RedHat Linux servers, and three Netware servers. The current environment is direct attached storage. The customer needs a 2Gb Fibre solution that can scale up to 64 partitions over the next three years and provide connectivity to all three platforms. The customer also needs a fibre attached backup solution. Which of the following solutions has the best combination of price and performance?()A
A DS4300 Turbo with Fibre Attached Tape LibraryB
A DS4500 with EXP700’s and Fibre Attached Tape LibraryC
A DS4500 with EXP710’s and Fibre Attached Tape LibraryD
A DS4300 with Additional EXP710’s and a SCSI Attached Tape Library
考题
单选题During initial cluster planning session, a requirement is mandated that application monitoring will Be used to monitor the production database and three application servers. Since all the application servers rely on the database being active, only one resource group has been planned to manage the starting/stopping of the cluster resources. How ill the initial design impact the use of application monitoring?()A
Only one application server per resource group can be monitored.B
Process monitoring is part of RSCT and requires no special scripts.C
Any application can be monitored as long as it has an application server.D
Having all application servers in one resource group improves recovery time.
热门标签
最新试卷