网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()
A
Micro-Partitioning
B
Partition Load Manager
C
eWLM
D
Grid Toolbox
参考答案
参考解析
解析:
暂无解析
更多 “单选题Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()A Micro-PartitioningB Partition Load ManagerC eWLMD Grid Toolbox” 相关考题
考题
AIX 5L and SUN Solaris have differing approaches at handling processor failures. Which statement best describes how AIX handles processor failures?()A、If AIX discovers a processor with too many recoverable errors during runtime, it will dynamically turn off that processor, while the rest of the system keeps running.B、If AIX detects a failing processor it will automatically move all resources to another processor. The failed processor can be hot-swapped and the new replacement becomes the active processor.C、If AIX determines a processor is failing, it will perform diagnostics to determine which processor function can be disabled and dynamically reallocate all CPU and memory resources thus isolating the failure condition and preventing a reboot.D、If AIX senses a processor level error condition, internal diagnostics are activated to determine the severity of the problem. After the failure threshold is met, a message is broadcast to the service processor informing the operator to perform a system reboot.
考题
You have created a resource plan, PROD_DB_PLAN, with the following consumer groups with the respective plan directives: Consumer group SALES with CPU_P1 as 60 and DEGREE_OF_PARALLELISM as 4. Consumer group MARKET with CPU_P1 as 20. Consumer group DEV with CPU_P1 as 20. Consumer group OTHERS with CPU_P1 as 0 and CPU_P2 as 100. Which two statements are correct in this scenario? ()A、The maximum degree of parallelism for the members of the consumer groups is 4.B、The CPU allocation will always be equal for the consumer groups MARKET and DEV.C、The OTHERS consumer group would get 100% of the CPU if there are unused level 1 CPU resources.D、The SALES and MARKET consumer groups would get 100% of the CPU if there are unused level 2 CPU resources.E、The maximum degree of parallelism for the members of the consumer group SALES is 4 with no restriction for the remaining groups.
考题
A technician would like to ensure that when users connect to a web server in a server farm, they connect to the server with the lowest CPU utilization. Which of the following technologies would accomplish this?()A、Load balancingB、High availabilityC、Virtual machineD、Reverse proxy
考题
Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A、The resources must be unallocated in an LPARB、The microcode on the pSeries must be currentC、All network adapters on the LPAR must be definedD、Network connectivity and name resolution capability between HMC and LPARs
考题
Which of the following is a correct statement about Workload Partitions (WPARs)?()A、WPARs use dedicated cores and shared memory.B、WPARs are restricted to using dedicated resources.C、WPARs share the resources of a single AIX instance.D、WPARs use shared cores, memory, and dedicated network adapters.
考题
Company.com would like to share CPU resources between AIX V5.3 and Linux partitions. Which solution would best satisfy this customer requirement?()A、Micro-PartitioningB、Partition Load ManagerC、eWLMD、Grid Toolbox
考题
A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()A、 Dynamic LPARsB、 On/Off Capacity on DemandC、 Uncapped Micro-PartitioningD、 Enterprise Workload Manager
考题
Companycom wants to deploy WebSphere in an HACMP environment, running on two servers in LPARs. These servers will also host the test and dev LPARs. The customer would like to use the test and dev resources to support an HACMP failover. What is the best way to accomplish this task?()A、Run the test and dev LPARs in an uncapped modeB、Activate COD resources if a failover should occurC、Use DLPAR to move resources between the test and dev and the HACMP LPARD、Stop the test and dev environments, bring up new profile for HACMP failover
考题
A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A、/usr/bin/errmsg "System upgraded to AIX 5.2"B、/usr/bin/errlog "System upgraded to AIX 5.2"C、/usr/bin/errupdate "System upgraded to AIX 5.2"D、/usr/bin/errlogger "System upgraded to AIX 5.2"
考题
Company.com wants to change the resource allocation for their AIX 5L V5.3 micro LPAR system. What is the smallest processor allocation than can be moved between partitions?()A、A full processorB、1% of a processorC、10% of a processorD、25% of a processor
考题
Company.com has a single pSeries server with two shared processor logical partitions. The first partition has peak resource requirements during weekdays. The second partition has peak resource requirements during weekends. During the peak times, the total workload between the partitions does NOT exceed the capacity of the server. However, the partitions are not able to utilize the full capacity of the system during peak times, because the necessary CPU and memory resources are not always allocated to the busiest partition. Which of the following options would best balance these resources?()A、Configure AIX Workload ManagerB、Configure Partition Load ManagerC、Configure eServer Workload ManagerD、Use DLPAR from the HMC
考题
Companycom has a p690 server with unused fiber (HBA) host bus adapters (feature code 6228) that they would like to reuse. They are interested in implementing Advanced Power Virtualization features particularly Virtual IO. What is the best way to proceed?()A、Upgrade the p690 to a p5 590 server running AIX 5.3B、Upgrade the p690 server to AIX 5.3 and implement Advanced Power VirtualizationC、Purchase a p5 590 with minimum resources and simply reuse the p690 unused fiber HBA adaptersD、Purchase a p5 590 that has all the needed resources and adapters for Advanced Power Virtualization
考题
Company.com has purchased a 2-way p5-520 and would like to create three Micro-Partitions on the server. Which feature of Advanced POWER Virtualization would allow them to create the desired number of partitions?()A、Virtual EthernetB、Shared Ethernet AdapterC、Dedicated ProcessorsD、Shared Processor Pool
考题
A customer has just obtained a second data center through the acquisition of a competitor. The IT Director is now seeking to merge,integrate,and rebalance systems across the two data centers over thenext two years. They have just deployed a high-speed point-to-point circuit between the facilities. The IT Director would like a system that could backup their AIX and Win2K servers and electronically vault the data between sites as part of their Disaster Recovery Plan. What product should the pSeries technical specialist recommend for this requirement?()A、CSMB、TSMC、NIMD、Sysback
考题
Company.com would like to configure a virtual Ethernet between an AIX V5.3 LPAR and an AIX V5.2 LPAR. Which of the following options is necessary to complete this task?()A、Remove the physical Ethernet adapters from the LPARsB、Activate Advanced POWER VirtualizationC、Update microcode for the virtual adaptersD、Upgrade AIX V5.2 LPAR to AIX V5.3
考题
Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()A、 Dynamic LPARB、 Micro PartitionsC、 Entitled capacityD、 Multiple Shared Processor Pools
考题
Companycom is considering a partitioned solution with one of the LPARs utilizing 12 CPUs. Multiple applications will be loaded on this large LPAR. However, the customer wants to ensure some tasks will have higher priority access to the CPU and memory resources. Which of the following solutions would best satisfy the requirement?()A、LoadlevelerB、AIX Workload ManagerC、Partition Load ManagerD、Tivoli Provisioning Manager
考题
Companycom has the following: 8 x 1.65GHz CPUs 16GB Memory 4 LPARs LPAR 1: Test/Dev 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 2: QA 1 CPU, 2GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 3: Prod 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, AIX 5.3 LPAR 4: Web App 3 CPUs, 6GB Memory, 1 Fibre Channel HBA, SUSE Linux Utilization over a 30 day period LPAR 1: Average utilization was 15%, Peak utilization was 100% LPAR 2: Average utilization was 25%, Peak utilization was 100% LPAR 3: Average utilization was 50%, Peak utilization was 90% LPAR 4: Average utilization was 35%, Peak utilization was 100% If the customer has a requirement for all four LPARs to be moved to a p5 590 and assigned to a shared pool. Which of the following would best describe the profile requirements?()A、LPARs 1 and 2, capped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0B、LPARs 1 and 2, capped, SMT on, Weights between 100-130, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, uncapped, SMT on, Weights between 25-30, min CPU 2.7, max CPU 3.0 C、LPARs 1 and 2, uncapped, SMT on, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0D、LPARs 1 and 2, uncapped, SMT off, Weights between 25-30, min CPU 0.1, max CPU 1.0 LPARs 3 and 4, capped, SMT on, Weights between 100-130, min CPU 2.7, max CPU 3.0
考题
Company.com would like to have the processor resources on their system efficiently shared between logical partitions, but does not require management of memory or I/O resources. Which of the following would accomplish this requirement?()A、HMC command lineB、Uncapped processorsC、Partition Load ManagerD、Enterprise Workload Manager
考题
单选题A customer would like to share the processor resources automatically between logical partitions. Which of the following would accomplish this requirement without user interaction? ()A
Dynamic LPARsB
On/Off Capacity on DemandC
Uncapped Micro-PartitioningD
Enterprise Workload Manager
考题
单选题Companycom is installing a p5 595 with AIX 5.3. The DLPAR option for the resources cannot be selected on the HMC menus. However, the daemons are running on both the HMC and LPARs. Which of the following is a prerequisite for DLPAR functionality?()A
The resources must be unallocated in an LPARB
The microcode on the pSeries must be currentC
All network adapters on the LPAR must be definedD
Network connectivity and name resolution capability between HMC and LPARs
考题
单选题Company.com with limited AIX skills has purchased a p5-520 2-way which will run Micro-Partitions. To reduce the initial cost of purchase, the customer will be sharing the system resources using a VIO server. The customer is concerned about managing the installation of the operating system. Which of the following should the customer perform?()A
Use alt_disk_install to install AIX on all logical partitions.B
Configure the DVD as a desired resource on all partitions.C
Configure all resources as shared resources between all partitions.D
Create a separate NIM server to manage the installation of all partitions.
考题
单选题Companycom has just purchased a p5 570 with AIX 5.3. The customer would like to add a training LPAR to the system, but no processors are available. All of the partitions are using dedicated resources. The test LPAR is using one processor and has a 90% CPU idle rate. What can be done to setup this training LPAR quickly without disabling their current environment?()A
Use AIX 5.3 which supports micro-partitioning for both the test and training LPARSB
Use DLPAR to move resources from the test LPAR to training when training is activeC
Install Partition Load Manager to share resources between the test and training environmentsD
Install Advanced Power Virtualization and then use micro-partitioning for both the test and training LPARs
考题
单选题Which functionality would a customer use to share available CPU resources between AIX and Linux partitions on a Power system?()A
Dynamic LPARB
Micro PartitionsC
Entitled capacityD
Multiple Shared Processor Pools
考题
单选题A system administrator has just finished upgrading a system to AIX 5.2. If there are future problems, the system administrator would like to add an entry to the AIX errorlog to record this event. Which of the following commands can be issued for this purpose?()A
/usr/bin/errmsg System upgraded to AIX 5.2B
/usr/bin/errlog System upgraded to AIX 5.2C
/usr/bin/errupdate System upgraded to AIX 5.2D
/usr/bin/errlogger System upgraded to AIX 5.2
考题
单选题Company.com wants to change the resource allocation for their AIX 5L V5.3 micro LPAR system. What is the smallest processor allocation than can be moved between partitions?()A
A full processorB
1% of a processorC
10% of a processorD
25% of a processor
考题
单选题Company.com has an EMC disk array and would like to connect it to a Virtual I/O Server on a pSeries p5-520. How can the EMC device drivers be installed?()A
Use smitty install on the client partitions.B
Use padmin command in the VIO Server.C
Use the oem_setup_env environment in the VIO Server.D
Use cfgmgr to detect/configure the devices within the client AIX partition.
考题
单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A
Reserve Capacity on DemandB
Utility Capacity on DemandC
Capacity Upgrade on DemandD
Uncapped Capacity on Demand
热门标签
最新试卷