The purpose of a main switchboard circuit breakers reverse-power trip is to ().
A

prevent main circuit overload

B

protect the circuit breaker blowout coil

C

prevent alternator motorization

D

prevent low voltage tripout


参考答案

参考解析
解析: 暂无解析
更多 “单选题The purpose of a main switchboard circuit breakers reverse-power trip is to ().A prevent main circuit overloadB protect the circuit breaker blowout coilC prevent alternator motorizationD prevent low voltage tripout” 相关考题
考题 Where could you monitor the correct instant for synchronizing without aid of synchroscope or synchronizing lamp? A.Distribution boardB.Section boardC.Emergency switchboardD.Main switchboard

考题 The "main storage" normally means that part of internal storage into which instructions and other data must be loaded for subsequent execution or processing. In large computing systems, the term "main storage" is(71) to "memory". "Buffer" mainly indicates a special-purpose storage or storage area allowing, through(72) storage, the data transfer between two functional units having different transfer characteristics. A buffer storage is used between non-synchronized devices or where one is(73) and the other is parallel or between those having different trans far rates. "(74) (memory)" is also a special-purpose buffer storage, smaller and faster than main storage, used to hold a copy of instructions and data obtained from main storage and likely to be needed next by the processor. "Register" is commonly composed of a part of internal storage having a specified storage(75) and usually intended for a specific purpose.A.suitableB.optionalC.choiceD.preferred

考题 Ensuring that data is transmitted securely over an IP network is the main purpose of:()A、TelnetB、FTPC、SIPD、TLS

考题 Open in TRC brake main relay circuit的中文意思是()。

考题 单选题What is the main purpose of dunnage().A To act as ballast for light vesselsB To provide ventilation and drainage for cargoC To secure the tarpaulins in placeD To support weakened bulkheads

考题 单选题()is not installed on the main switchboard.A Ammeter and changeover switchB Power factor meterC SynchroscopeD Reverse sequence relay

考题 单选题The main purpose of warming the parts of the main engine is ()A to reduce heat stressB to reduce low temperature corrosionC to improve firing and starting performanceD fuel saving

考题 单选题The frequency of an alternator is controlled from the main switchboard by adjusting the()A frequency meterB voltage regulatorC governor controlD sychroscope switch

考题 单选题An indicator on the main switchboard should show () the emergency battery is in service or not.A thatB whenC ifD whether

考题 单选题What is the main purpose of this letter?A To remind residents to vote in an electionB To assess the main contenders for city mayorC To report on political developments in the regionD To promote a political candidate

考题 单选题What is the purpose of the intermediate spring?()A Serves as a backup for the main tow hawser in case of failureB Provides weight and flexibility to the total tow makeupC Lengthens the main tow hawser to keep the tow in stepD Distributes the towing load

考题 单选题A “dead front” switchboard is one ().A without switches on itB with insulated switches and no exposed terminalsC without circuit breakersD without safety hand nails nor rubber mats

考题 单选题()are located on the road panel of main switchboard.A Megohm meter, insulation light and synchroscopeB Synchroscope, synchro light and megohm meterC Shore power switch, insulation light and synchroscopeD Megohm meter, insulation light and shore power switch

考题 填空题What is the main purpose of this Call for Expression of Interest?To invite ____ to participate in the Beijing 2008 Olympic Games.

考题 单选题Before any work on electrical or electronic equipment is performed, which of the following precautions should be carried out ()A De-energize the applicable switchboard busB Bypass the interlocksC Secure and tag the supply circuit breaker in the open positionD Station a man at the circuit supply switch

考题 单选题() is a machine by which electrical energy is transformed into mechanical energy.A An alternatorB An electric motorC A diesel engineD A main switchboard

考题 单选题()is not a part of the main switchboard.A BusbarB Load panel of main generatorC Paralleling panelD Shore connection box

考题 单选题()is power supplied by main switchboard directly not through sub-board.A Deck machineryB Little power loadC Some important loadD stationary submersible pump

考题 单选题Emergency generator is installed on board mainly to ()A connect to the busbar when the load increasingB supply power specially to charging panelC be put into operation during the ship arriving at or leaving portD ensure the power supply to critical equipment after the main switchboard out of power

考题 单选题The main purpose of the Customs supervision and control is to ()China’s economic, trade,scientific, technological and cultural exchanges with other countries。A superviseB controlC promoteD limit

考题 单选题A ground in an electrical circuit outside the engine room ().A cannot be detected tinder normal conditionsB is of no consequence to engineering personnelC is indicated at the branch circuit breaker panelD is indicated by the ground detecting lamps on the main switchboard

考题 单选题The purpose of the commutator and brushes on a DC generator is to()A change AC to DCcurrentB change DC to AC currentC neutralize a armature reactionD carry current to the outside circuit

考题 单选题To () , the power is supplied by main switchboard directly not though sub-board.A save network costB improve the reliability of supplying power to important loadC prevent sequence reverseD increase the power factor of important load

考题 单选题() is (are) not power supplied by main switchboard directly.A Steering gear and windlassB Navigation light and radio power panelC Navigation device power boxD Daily fresh water pump

考题 单选题The main purpose of asking questions about the topic before listening is toA meet students' expectationB increase students' confidenceC activate students' schemataD provide feedback on tasks

考题 单选题Main engine room control console alarms are to be of the self monitoring type, meaning that an open circuit to a particular alarm circuit will ()A cause an alarm conditionB secure power to the indicatorC secure power to the monitored deviceD automatically recluse within 10 seconds

考题 单选题When working on a high voltage circuit, you should always have another person present with you.This person should have a good working knowledge of ()A the circuit being worked on and the location of all switches and circuit breakers controlling itB first-aid techniques for treating electrical shockC cardiopulmonary resuscitation (CPR)D All of the above