网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
They will ()out a more detailed inspection.
A

carried

B

carrying

C

to carry

D

carry


参考答案

参考解析
解析: 暂无解析
更多 “单选题They will ()out a more detailed inspection.A carriedB carryingC to carryD carry” 相关考题
考题 The prfessor prepares his lectures carefully before trying to carry ( )in hisclass. A. it outB. out itC. them outD. out them

考题 There is no point to try to change his mind once he is determined to carry out the plan.()

考题 During PSC inspection related to the ISM Code,_____of the Safety Management System (SMS) should be carried out if clear grounds are establishedA.a less favorable inspectionB.a more favorable inspectionC.a less detailed inspectionD.a more detailed inspection

考题 According to the author,handwritten notes _______.A. are harder to teach in schoolsB. attract more attentionC. are used only between friendsD. carry more message

考题 It is much easier to make a plan than it out.A. carryingB. carryC. to carryD. carried

考题 Please arrange the survey ______ early.A.to be carried outB.carry outC.be carried outD.will carry out

考题 Tom shut everyone out of the lab ____________ out the physical experiment.A.carry B.carried C.and carry D.carrying

考题 The managers were discussing the plan which they all wanted to see ____________ out that month.A.to be carried B.to carry C.carrying D.carry

考题 He hasn't the funds to carry out his design.A:makeB:keepC:changeD:implement

考题 进行安全检查。()A、Carry out safety inspection.B、Carry out more detailed inspection.C、Carry out important inspection.D、Carry out relevant inspection.

考题 We are going to carry out an emergency ().A、practiseB、practiceC、drillD、drills

考题 We should give the PSC officers a good impression, or they will carry out a more detailed inspection.()A、港口国监督检查官员给我们留了个好印象,否则他们将进行更详细的检查。B、我们应给港口国监督检查官员留个好印象,否则他们将进行更详细的检查。C、港口国监督检查官员将进行更详细的检查,因为我们没给他们留下好印象。D、因为我们没给港口国监督检查官员留个好印象,他们将进行更详细的检查。

考题 They will ()out a more detailed inspection.A、carriedB、carryingC、to carryD、carry

考题 单选题If the PSCO has clear grounds for carrying out a more detailed inspection,()A the master should be immediately informedB the master will be prohibited from contacting the Administration or other organizationC he will carry out the inspection after the master be informed and be readyD he will carry out the inspection without informing the master

考题 单选题进行安全检查。()A Carry out safety inspection.B Carry out more detailed inspection.C Carry out important inspection.D Carry out relevant inspection.

考题 单选题If we carry out our plan with()we will surely achieve our goal sooner or later.A conditionsB determinationC competitionD frowns

考题 单选题I tried to get out of the business _____ I found impossible to carry on.A whyB whichC whatD where

考题 单选题If the PSCO has clear grounds for carrying out a more detailed inspection, ()should be immediately informed of these grounds.A the masterB the chief engineerC the owner of the shipD the manager who assumes the responsibility for operation of the ship

考题 单选题What can NOT be concluded from the passage?A More and more young people are volunteering to carry out suicide bombings since the conflict according to militant groups’ data.B Israel’s intensified blockade has brought Gaza a darker sky.C All the Palestinian militant groups are united against Israel.D Young Palestinian men are feeling depressed but sense a hopeful future.

考题 单选题If he _____ to this project, we will not go on to carry it out.A will objectB objectsC had objectedD objected

考题 单选题0perational tests of ship’s equipment should()out.A be carriedB carryC carryingD to carry

考题 单选题He failed to carry out some of the provisions of the contract, and now he has to _____ the consequences.A answer forB run intoC abide byD step into

考题 单选题During PSC inspection related to the ISM Code, of the Safety Management System (SMS) should be carried out if clear grounds are established()A a less favorable inspectionB a more favorable inspectionC a less detailed inspectionD a more detailed inspection

考题 单选题Every deck officer should be able efficiently carry out:()A ConningB Navigation/Collision AvoidanceC AdministrationD Above of all

考题 单选题No navigational aids are shown and chart is not kept corrected for alterations in depths inside the pecked lines. For more detailed information, the larger scale charts must be().A boughtB analyzedC consultedD published

考题 单选题We should give the PSC officers a good impression, or they will carry out a more detailed inspection.()A 港口国监督检查官员给我们留了个好印象,否则他们将进行更详细的检查。B 我们应给港口国监督检查官员留个好印象,否则他们将进行更详细的检查。C 港口国监督检查官员将进行更详细的检查,因为我们没给他们留下好印象。D 因为我们没给港口国监督检查官员留个好印象,他们将进行更详细的检查。

考题 单选题We are going to carry out an emergency ().A practiseB practiceC drillD drills