An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()
- A、The bosinst_data has an incorrect console defined.
- B、The bosinst_data is incompatible with the level of spot.
- C、The bosinst_data has an incorrect disk location defined.
- D、The bosinst_data has an incorrect language option defined.
参考答案
更多 “ An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()A、The bosinst_data has an incorrect console defined.B、The bosinst_data is incompatible with the level of spot.C、The bosinst_data has an incorrect disk location defined.D、The bosinst_data has an incorrect language option defined.” 相关考题
考题
During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()
A.A failure to NFS mount filesystems from the NIM clientB.A failure to NFS mount filesystems from the NIM masterC.A failure to retrieve the tftp client info from the NIM masterD.A failure to retrieve the tftp server info from the NIM master
考题
WhataretheminimalresourcestoperformaNIMBOSinstall?()
A.spot,lpp_sourceB.mksysb,lpp_sourceC.boot,bundle,nim_scriptD.aixdisks,spot,lpp_source
考题
A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A、DLPAR functions are not available for cloned partitionsB、The new partition has the same node number as the original LPARC、Additional filesets need to be reinstalled after the alt_disk_install cloningD、The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
考题
A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server. Which of the following provide post install diagnostics()A、SPOTB、lpp_sourceC、mksysbD、install CD
考题
During a NIM install, the system stops with the LED code 611.What is the cause of the issue?()A、A failure to NFS mount filesystems from the NIM clientB、A failure to NFS mount filesystems from the NIM masterC、A failure to retrieve the tftp client info from the NIM masterD、A failure to retrieve the tftp server info from the NIM master
考题
After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()A、The cfgmgr command was not run to reconfigure the devicesB、The machine was not booted into SMS MultiBoot mode after configurationC、The machine was not in full system partition mode when the volume was createdD、The alt_disk_install command was not run with the -O option to remove references in the ODM
考题
An install of cluster .es software failed. Output from the failure indicates missing system requisites. Every subsequent attempt to install the software abended. In order for the cluster to install,the most likely way for the administrator to resolve this problem is to install the "bos.data" and which other fileset(s)?() A、 "rsct.*"B、 "xIC*" and "rsct.*"C、 "bos.adt.*" and "rsct.*"D、 "csm.*.rte" and "rsct.*"
考题
To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
考题
A customer is in the process of testing their configuration prior to going live. The administrator discovers thatPowerHA is taking 31 seconds to deal with a standard NIC failure. What can the administrator do to speed upthe process of NIC failure detection and diagnosis?()A、Tune the topsvcs NIM settingsB、Tune the grpsvcs NIM settingsC、Activate the fast failure detection (FFD) featureD、Activate the Gigabit fast failover feature on the physical adapters
考题
An administrator has mirrored the root volume group to a second disk, but ’bootlist’ is failing to correctly add the second disk. What is the likely cause of the problem?() A、The administrator has failed to run ’bosboot -ad 2nd disk’ prior to the bootlist command.B、The administrator has failed to run ’bootinfo -B 2nd disk’ prior to the bootlist command.C、The administrator has failed to run ’mirrorvg -m rootvg 2nd disk’ prior to the bootlist command.D、The administrator has failed to run ’bosboot -ad /dev/ipldevice 2nd disk’ prior to the bootlist command.
考题
An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()A、The bosinst_data has an incorrect console defined.B、The bosinst_data is incompatible with the level of spot.C、The bosinst_data has an incorrect disk location defined.D、The bosinst_data has an incorrect language option defined.
考题
What are the minimal resources to perform a NIM BOS install?()A、spot, lpp_sourceB、mksysb, lpp_sourceC、boot, bundle, nim_scriptD、aix disks, spot, lpp_source
考题
For NIM to install client machines located in a non-adjacent network, which routing must be defined?() A、Boot/install servers will be required on each intermediate network.B、When an install is initiated by the client, routing is only required from the LPAR back to the NIM master.C、When an install is initiated by the NIM master, routing is only required from the NIM master to the client.D、Appropriate network NIM resources need to be defined to the NIM master to allow routing in both directions.
考题
If a restore from a NIM mksysb install hung on C54, which debug output would be best to investigate the problem?()A、export INST_DEBUG =yesB、bosboot -aID -d /dev/ipldevicC、nim - to check -a debug =yesD、 type 911 at -Welcome to BOS install- menu
考题
An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?() A、The lpp_AIX6 is not a valid lpp_source NIM resource.B、The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.C、The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.D、The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ
考题
What are the steps required to perform a Preservation install on a server?()A、Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Preservation install for the install type,and allow upgrade to runB、Shut down the server and perform a network boot from a local NIM server.Select Presevation install for the install type,and allow upgrade to runC、Shutdown the server and boot it into SMS.Select SMS menu option OS Upgrade,Presevation install for the install type,and allow for upgrade to runD、Re-boot the server and NFS mount the bos images from a local NIM server.Run smit install.Select Presevation install for the install type,and allow upgrade to run
考题
To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()A、A mksysb resource, a SPOT resource, and an lpp_source resourceB、A SPOT resource, an lpp_source resource, and a machine definitionC、An lpp_source resource, a mksysb resource, and a machine definitionD、A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
考题
While attempting to load a base operating system to a machine, an administrator is receiving bootp timeout error messages. What steps should be followed to troubleshoot communications between the NIM master and the client machine?()A、View debug logs on NIM master for errors or failures.B、Boot the client machine to SMS, and view the POST Error log.C、Boot the client machine to SMS, setup remote IPL, and execute a ping test.D、Boot the client machine to diagnostics, and ping the client from the NIM master.
考题
单选题A client is experiencing issues after cloning an LPAR using alt_disk_install. DLPAR functions are not available for the new LPAR. Also, there is a lot of network traffic to the HMC. What is the most probable cause of this problem?()A
DLPAR functions are not available for cloned partitionsB
The new partition has the same node number as the original LPARC
Additional filesets need to be reinstalled after the alt_disk_install cloningD
The speed and duplex settings on the Ethernet adapter on the new LPAR is misconfigured
考题
单选题To load the base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed()A
A mksysb resource, a SPOT resource, and an lpp_source resourceB
A SPOT resource, an lpp_source resource, and a machine definitionC
An lpp_source resource, a mksysb resource, and a machine definitionD
A SPOT resource, an lpp_source resource, a bosinst_data resource, and a machine definition
考题
单选题An administrator is defining an lpp_source calledlpp_AIX6 in NIM when the following warning message is displayed in the output:warning: 0042-267 c_mk_lpp_source: The defined lpp_source does not have the 'simages' attribute because one or more of the following packages are missing: Bos bos.net bos.diag bos.sysmgtbos.terminfo bos.terminfo.all.data bos.mp64 devices.common bos.64bit. What does this warning message mean?()A
The lpp_AIX6 is not a valid lpp_source NIM resource.B
The lpp_AIX6 can be used in NIM BOS operations to install AIX only on standalone clients.C
The lpp_AIX6 can be used in NIM CUST operations to install software on SPOTs and running machines.D
The lpp_AIX6 does not contain all of the required software packages for NIM CUST installation operations.WArialCourier NewTimes New RomanZ
考题
单选题An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data. What is the most likely cause of the install failure?()A
The bosinst_data has an incorrect console defined.B
The bosinst_data is incompatible with the level of spot.C
The bosinst_data has an incorrect disk location defined.D
The bosinst_data has an incorrect language option defined.
考题
单选题A System p administrator plans to install a new system with AIX 5.3 TL5 using a NIM server. Which of the following provide post install diagnostics()A
SPOTB
lpp_sourceC
mksysbD
install CD
考题
单选题After using the alt_disk_install command to clone a system image to another disk, the system administrator noticed a large number of defined devices not allocated to the LPAR. Which of the following is the most likely cause of this situation?()A
The cfgmgr command was not run to reconfigure the devicesB
The machine was not booted into SMS MultiBoot mode after configurationC
The machine was not in full system partition mode when the volume was createdD
The alt_disk_install command was not run with the -O option to remove references in the ODM
考题
单选题What are the minimal resources to perform a NIM BOS install?()A
spot, lpp_sourceB
mksysb, lpp_sourceC
boot, bundle, nim_scriptD
aix disks, spot, lpp_source
考题
单选题An administrator is investigating why a non-prompted NIM rte install is failing after the successful netboot of the spot. A matching spot and lpp_source are correctly allocated to the NIM client in addition to a bosinst_data.What is the most likely cause of the install failure?()A
The bosinst_data has an incorrect console defined.B
The bosinst_data is incompatible with the level of spot.C
The bosinst_data has an incorrect disk location defined.D
The bosinst_data has an incorrect language option defined.
考题
单选题To load a base operating system on a machine using NIM, what are the minimum NIM resources that must be defined for the installation to succeed?()A
A mksysb resource, a SPOT resource, and an lpp_source resourceB
A SPOT resource, an lpp_source resource, and a machine definitionC
An lpp_source resource, a mksysb resource, and a machine definitionD
A SPOT resource, an lpp_source resource, a machine definition, and a bootable CD
热门标签
最新试卷