A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()
- A、On/Off CoD
- B、Reserve CoD
- C、Permanent CUoD
- D、Capacity Backup
参考答案
更多 “A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()A、On/Off CoDB、Reserve CoDC、Permanent CUoDD、Capacity Backup” 相关考题
考题
A customer intends to implement a Fibre Channel SAN at the production site. Replication will take place over a 10 kilometer Ethernet connection to a second site; however, only IP storage connectivity currently exists at the second site.Which is the most appropriate method of replication in this situation?()A. FC routingB. FCoE connectionC. FC-IP tunnelingD. multi-protocol router
考题
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance.Which of the following products best accomplishes this task?()A. Global CopyB. Metro MirrorC. Global MirrorD. Metro/Global Mirror
考题
A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()
A. disaster recovery strategyB. the number of IOPS requiredC. the capacity of each hard driveD. how the database will be backed up
考题
A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A、Reserve Capacity on DemandB、Utility Capacity on DemandC、Capacity Upgrade on DemandD、Uncapped Capacity on Demand
考题
Which of the following disaster recovery sites requires power and cabling to be run before it can be used?()A、 Hot siteB、 Cold siteC、 Warm siteD、 Failover site
考题
Which of the following is the MOST important step in any disaster recovery plan?()A、 Appropriate use of backup media and offsite storageB、 The disaster recovery testing process过程C、 Classifying systems according to operational impactD、 Use appropriate fire suppressant systems
考题
Which of the following is a distinguishing factor between data archiving and data backups?()A、Data archives are kept for disaster recovery purposes while data backups are kept for indefiniteperiods of time so that there is an information record.B、Data archives are kept for documentation purposes to easily recover data while data backupsare kept for immediate server recovery.C、Data archives are kept off-site for data warehousing purposes while data backups are keptlocally for immediate server recovery purposes.D、Data archives are kept for indefinite periods of time so there is a record while data backups arekept for disaster recovery purposes.
考题
Which of the following is the MOST important consideration when looking at distance requirements when planning a hot site?()A、Avoiding more expensive bandwidth costs for data lines between regionsB、Avoiding a regional disaster that affects both the main site and the hot siteC、Avoiding a second location that has high latency between sitesD、Avoiding a location that is too expensive
考题
Which of the following replication methods provides a disaster recovery system with minimal downtime to normal operations?()A、 Cold siteB、 Warm siteC、 GFSD、 Hot site
考题
Which of the following is MOST important to include on the disaster recovery documentation?()A、 Emergency exitsB、 The test planC、 PayrollD、 All IT contact numbers
考题
Which of the following is the MOST important step in preparing for disaster recovery?()A、 Test the disaster recovery plan processB、 Identify key disaster recovery personnelC、 Ensure that all backup data is kept off-siteD、 Assist management with IT backup policy decisions
考题
A customer wants to run VMWare ESX on an x445 with a large number of virtual machines running Windows 2003 Server as a Disaster Recovery (DR) Site for the production environment. Which of the following questions would most impact the memory configuration?()A、What version of VMWare ESX Server is being considered?B、Do the systems currently use Double Data Rate (DDR) memory?C、What is the total number of processors installed in the production systems?D、What is the total amount of memory currently being used across all the production systems?
考题
A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()A、a disk-to-disk backup solution keeping all storage in the data centerB、a backup solution that includes magnetic tape that is shipped to an off-site storage facilityC、a less powerful copy environment at a hot site with asynchronous mirroring and cluster technologyD、an exact copy of the primary environment at a hot site with remote mirroring and cluster technology
考题
A global customer’s IT strategy is based upon two DS8000 systems and an N series gateway. They want to protect their business by implementing a disaster recovery solution. The storage specialist has recommended cascaded mirroring. Which of the following is the business benefit of cascaded replication()A、it is cost efficient, as a single N series or DS8000 can have its controllers split between the primary and secondary site and use semi- synchronousmirroring while using asynchronous mirroring to a third siteB、the second site acts as a repeater station so that greater geographical distances can be achievedC、ITprovides high availability together with disaster recovery by implementing Metro/Global Mirror across three geographically dispersed systemsD、it guarantees data protection by implementing two synchronous copies of the primary site data
考题
A customer intends to implement a Fibre Channel SAN at the production site. Replication will take place over a 10 kilometer Ethernet connection to a second site; however, only IP storage connectivity currently exists at the second site. Which is the most appropriate method of replication in this situation?()A、FC routingB、FCoE connectionC、FC-IP tunnelingD、multi-protocol router
考题
A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()A、compatibility of copy functionsB、difference in capacities in the two systemsC、cache size discrepancies between the two systemsD、the necessity of using two storage management products
考题
A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()A、What is the minimum critical backup window?B、Which server is handling the most critical data?C、How much data is stored on each server?D、What is the throughput of the hard drives?
考题
A customer wants to deploy a centralized storage system to support a new database. Which of the following factors should the storage specialist consider first?()A、disaster recovery strategyB、the number of IOPS requiredC、the capacity of each hard driveD、how the database will be backed up
考题
A customer has an IBM System Storage DS8100 at their primary site and a DS6800 at their recovery site, 9.5 kilometers away. They want to replicate data for disaster recovery backup with the least impact on performance. Which of the following products best accomplishes this task?()A、Global CopyB、Metro MirrorC、Global MirrorD、Metro/Global Mirror
考题
单选题A customer would like to have the ability to permanently activate processor and memory resources as their workload increases. Which of the following supports the customer requirement?()A
Reserve Capacity on DemandB
Utility Capacity on DemandC
Capacity Upgrade on DemandD
Uncapped Capacity on Demand
考题
单选题Which of the following is the MOST important step in any disaster recovery plan?()A
Appropriate use of backup media and offsite storageB
The disaster recovery testing process过程C
Classifying systems according to operational impactD
Use appropriate fire suppressant systems
考题
单选题A customer is considering a second p690 at a second site for Disaster Recovery purposes. Which of the following On Demand offerings is most applicable in this environment?()A
On/Off CoDB
Reserve CoDC
Permanent CUoDD
Capacity Backup
考题
单选题Which of the following is the MOST important step in preparing for disaster recovery?()A
Test the disaster recovery plan processB
Identify key disaster recovery personnelC
Ensure that all backup data is kept off-siteD
Assist management with IT backup policy decisions
考题
单选题A customer has a large amount of data stored on three database servers and is concerned that at present there is no disaster recovery plan in place. They have an existing tape backup solution that meets their backup window. In order to analyze potential disaster recovery plans, which of the following questions is the most important?()A
What is the minimum critical backup window?B
Which server is handling the most critical data?C
How much data is stored on each server?D
What is the throughput of the hard drives?
考题
多选题A Site Administrator is preparing for disaster recovery. In the case that a hard disk fails, which of the following would he need to do to have a complete backup?()AABBCCDDEE
考题
单选题A customer has a requirement for Disaster Recovery for compliance within their industry. Theyhave an RPO of 4 hours and an RTO of 24 hours. Cost is a consideration. What is the most costeffective DR implementation?()A
a disk-to-disk backup solution keeping all storage in the data centerB
a backup solution that includes magnetic tape that is shipped to an off-site storage facilityC
a less powerful copy environment at a hot site with asynchronous mirroring and cluster technologyD
an exact copy of the primary environment at a hot site with remote mirroring and cluster technology
考题
单选题A customer has an IBM System Storage DS8700 at their primary site and an XIV system at their recovery site, which is 9.5 kilometers away. They want to replicate data for disaster recovery backup. Which factor is a primary consideration when proposing a solution for this customer()A
compatibility of copy functionsB
difference in capacities in the two systemsC
cache size discrepancies between the two systemsD
the necessity of using two storage management products