网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
Node Manager is a WebLogic Server () that enables you to start, shut down, and restart Administration Server and Managed Server from a remote location.
- A、 Instance
- B、 Utility
- C、 Destination
- D、 Ouster
参考答案
更多 “Node Manager is a WebLogic Server () that enables you to start, shut down, and restart Administration Server and Managed Server from a remote location.A、 InstanceB、 UtilityC、 DestinationD、 Ouster” 相关考题
考题
NodeManagerisaWebLogicServer()thatenablesyoutostart,shutdown,andrestartAdministrationServerandManagedServerfromaremotelocation.
A.InstanceB.UtilityC.DestinationD.Ouster
考题
An application is using WebLogic JMS Store and Forward to forward messages from a local JMS queue a remote WebLogic JMS destination. You need to determine if the messages are being sent from the local Weblogic Server. Where do you find information and metrics about Store and Forward components in the WebLogic Admin Console?()A、JMS Persistent StoreB、JMS Server C、JMS Distributed DestinationD、JMS Store and Forward E、Automatic Service Migration
考题
Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()A、 Shut down one node at a time and let the other node serve the applicationB、 Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC、 Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD、 Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
考题
A highly available WebLogic cluster in UNIX is configured for automatic server migration. Node Managed is configured on both machines to start managed servers. How should you simulate a managed server failure to test whether automatic server migration is working?()A、Shut down the managed server from the WebLogic console.B、Shut down the managed server using the WLST command through Node Manager.C、Run "kill -9" once to kill the managed server process.D、Run "kill -9" to kill the managed server process, and run "kill -9" one more time if the managed server is restarting.
考题
Which two statements are true regarding the WebLogic domain?()A、A WebLogic domain can have more than one Administration server.B、A WebLogic domain has at least one WebLogic server.C、A WebLogic domain can have at the most one cluster. D、A WebLogic domain can cross multiple physical machines. E、Each WebLogic domain is associated with a different Node Manager.
考题
()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA、 farmB、 beanC、 unitD、 node
考题
WebLogic Node Manager can be used to manage the life cycle of WebLogic servers. WebLogic Node Manager is installed and started ().A、Per MachineB、Per DomainC、Per Managed ServerD、Per Admin Server
考题
You have been recently hired as a database administrator. Your senior manager asks you to study the production database server and submit a report on the settings done by the previous DBA. While observing the server settings, you find that the following parameter has been set in the parameter file of the database: REMOTE_OS_AUTHENT = TRUE What could have been the reason to set this parameter as TRUE?()A、to enable operating system authentication for a remote clientB、to restrict the scope of administration to identical operating systemsC、to allow the start up and shut down of the database from a remote clientD、to enable the administration of the operating system from a remote clientE、to disable the administration of the operating system from a remote client
考题
You want to configure WebLogic so that Managed Servers are restarted when they are in a FAILED state. Which three steps are necessary to accomplish this?()A、Configure Node Manager on the machines where WebLogic Managed Servers need to be started/restarted.B、Enable "Auto Restart" in the Node Manager Configuration.C、Enable "Auto Kill if Failed" in the Node Manager Configuration.D、Enable "Auto Kill if Failed" for the Managed Server in question.E、Enable "Auto Restart" for the Managed Server in question.
考题
In a typical production environment, which server(s) hosts the application ?()A、 Node ServerB、 Administration ServerC、 Managed ServerD、 Configuration Server
考题
This is a special WebLogic Server instance included by the WebLogic Server Domains. It represents a central point from which you configure and manage all resource domain. ()A、 Managed ServerB、 Web ServerC、 Administration ServerD、 Node Server
考题
Oracle Fusion Middleware Control runs as:()A、 a module in Oracle HTTP ServerB、 a PL/SQL module in Oracle DatabaseC、 an application in WebLogic Server Administration ServerD、 an application in WebLogic Server Managed Server
考题
You need to recommend a backup strategy for Hyper-V. What should you recommend?()A、Take a snapshot of each VM, and then run a full backup of the Hyper-V hosts by using Windows Server Backup.B、Shut down the VMs,and then run a full backup of the Hyper-V hosts by using Windows Server Backup. Restart the VMs when the backup is complete.C、From each VM,run a full backup by using Windows Server Backup, and then run a full backup of the Hyper-V hosts by using Windows Server Backup.D、From each VM,run a full backup by using Windows Server Backup. Shut down the VMs, and then run a full backup of the Hyper-V hosts by using Windows Server Backup. Restart the VMs when the backup is complete.
考题
You are the domain administrator for TestKing's Active Directory domain. All servers run Windows Server 2003. All client computers run Windows XP Professional. A newly installed server was added to your domain. You need to administer this server remotely from your client computer. You need to configure the new server to ensure that it can be administered remotely. What should you do?()A、Install Terminal Server Licensing. Restart the server.B、Modify the system properties for the server. Enable Remote Desktop for the server by selecting the Allow users to connect remotely to this system check box.C、Start the Remote Access Connection Manager service and then configure the service to start automatically.D、Modify your user account properties to enable you to connect to the terminal server
考题
You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1 experiences a power failure and shuts down unexpectedly. You start the server and receive the following error message; “NTLDR is missing. Press Ctrl+Alt+Del to restart.” You need to ensure that you can run Windows Server 2003 on Server1. What should you do first? ()A、Start Server1 and press F8.B、Start Server1 by using the Windows Server 2003 SP2 installation media and access the Recovery Console.C、Create a MS-DOS startup disk. Start Server1 from the MS-DOS startup disk.D、Create an Automated System Recovery (ASR) floppy disk from a different Windows Server 2003 SP2 server. Start Server1 from the ASR floppy disk.
考题
Which of the following options allows for the remote administration of a Core installation of Windows Server 2012 R2 from another server running Windows Server 2012 R2?()A、Configure Router Guard.B、Configure Port Mirroring.C、Enable Remote Management.D、Enable Remote Desktop.E、Using Server Manager.
考题
单选题You have a server named Server1 that runs Windows Server 2003 Service Pack 2 (SP2). Server1 experiences a power failure and shuts down unexpectedly. You start the server and receive the following error message; “NTLDR is missing. Press Ctrl+Alt+Del to restart.” You need to ensure that you can run Windows Server 2003 on Server1. What should you do first? ()A
Start Server1 and press F8.B
Start Server1 by using the Windows Server 2003 SP2 installation media and access the Recovery Console.C
Create a MS-DOS startup disk. Start Server1 from the MS-DOS startup disk.D
Create an Automated System Recovery (ASR) floppy disk from a different Windows Server 2003 SP2 server. Start Server1 from the ASR floppy disk.
考题
单选题You have been recently hired as a database administrator. Your senior manager asks you to study the production database server and submit a report on the settings done by the previous DBA. While observing the server settings, you find that the following parameter has been set in the parameter file of the database: REMOTE_OS_AUTHENT = TRUE What could have been the reason to set this parameter as TRUE?()A
to enable operating system authentication for a remote clientB
to restrict the scope of administration to identical operating systemsC
to allow the start up and shut down of the database from a remote clientD
to enable the administration of the operating system from a remote clientE
to disable the administration of the operating system from a remote client
考题
单选题Which of the following options allows for the remote administration of a Core installation of Windows Server 2012 R2 from another server running Windows Server 2012 R2?()A
Configure Router Guard.B
Configure Port Mirroring.C
Enable Remote Management.D
Enable Remote Desktop.E
Using Server Manager.
考题
多选题Which action cannot be done in a scripted, automated fashion using WLST?()Acollecting run-time metrics and sending an email if user-defined thresholds are exceededBconfiguring Clusters and Managed ServersCstarting Managed Servers using the Node ManagerDinstalling WebLogic binaries on a remote machine using Node ManagerEconfiguring a Managed Server on a remote machine where the Node Manager is installed but no other Managed Servers from the domain exist
考题
单选题A highly available WebLogic cluster in UNIX is configured for automatic server migration. Node Managed is configured on both machines to start managed servers. How should you simulate a managed server failure to test whether automatic server migration is working?()A
Shut down the managed server from the WebLogic console.B
Shut down the managed server using the WLST command through Node Manager.C
Run kill -9 once to kill the managed server process.D
Run kill -9 to kill the managed server process, and run kill -9 one more time if the managed server is restarting.
考题
单选题This is a special WebLogic Server instance included by the WebLogic Server Domains. It represents a central point from which you configure and manage all resource domain. ()A
Managed ServerB
Web ServerC
Administration ServerD
Node Server
考题
单选题()is a collection of components managed by Fusion Middleware Control. It can contain Oracle WebLogic Server domains, one Administration Server, one or more Managed Servers, clusters, and the Oracle Fusion Middleware components that are installed, configured, and running in the domainA
farmB
beanC
unitD
node
考题
单选题Node Manager is a WebLogic Server () that enables you to start, shut down, and restart Administration Server and Managed Server from a remote location.A
InstanceB
UtilityC
DestinationD
Ouster
考题
单选题You are the domain administrator for TestKing's Active Directory domain. All servers run Windows Server 2003. All client computers run Windows XP Professional. A newly installed server was added to your domain. You need to administer this server remotely from your client computer. You need to configure the new server to ensure that it can be administered remotely. What should you do?()A
Install Terminal Server Licensing. Restart the server.B
Modify the system properties for the server. Enable Remote Desktop for the server by selecting the Allow users to connect remotely to this system check box.C
Start the Remote Access Connection Manager service and then configure the service to start automatically.D
Modify your user account properties to enable you to connect to the terminal server
考题
单选题Company.com is migrating from a third party managed disk subsystem to an IBM TotalStorage Enterprise Storage Server. Connection of the new storage server is complete, and it has been tested on all of the nodes in the three node HACMP cluster. How does the customer migrate to the new storage server with minimum down time?()A
Shut down one node at a time and let the other node serve the applicationB
Stop HACMP with the forced option and perform migration of the disks on one node,then restart HACMPC
Stop both nodes and perform the migration all at once using standard AIX commands in parallel, then restart the clusterD
Use C-SPOC to add the new disks to the cluster and migrate the information off the existing disks, then remove the old disks with C-SPOC
考题
单选题Oracle Fusion Middleware Control runs as:()A
a module in Oracle HTTP ServerB
a PL/SQL module in Oracle DatabaseC
an application in WebLogic Server Administration ServerD
an application in WebLogic Server Managed Server
热门标签
最新试卷