网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

In anchor orders, “Up and down” means “()”.

  • A、The chain is not upright
  • B、The chain is upright
  • C、The chain is slack
  • D、The chain is not slack

参考答案

更多 “In anchor orders, “Up and down” means “()”.A、The chain is not uprightB、The chain is uprightC、The chain is slackD、The chain is not slack” 相关考题
考题 We are given the orders that the project()before the end of next month. A、has to be drawn upB、be drawn upC、shall be drawn up will be drawn up

考题 After issuing the show interfaces terse command, you notice that the status of one interface is "up down". What does this indicate?"() A.Layer 1 on the interface is up but Layer 2 is down.B.Layer 2 on the interface is up but Layer 3 has not been configured.C.The interface is administratively up but the link status is down.D.The interface is up but has been administratively turned off.

考题 A sea anchor is ______.A.a heavy anchor with an extra long line used to anchor in deep waterB.a cone shaped bag used to slow down the wind drift effectC.a pad eye to which the sea painter is made fastD.made of wood if it is of an approved type

考题 键盘事件的执行顺序是()。AKey Press、Key Down、Key UpBKey Down、Key Press、Key UpCKey Up、Key Down、Key PressDKey Up、Key Press、Key Down

考题 Anchor()(垂直).A、upB、downC、up and downD、up or down

考题 锚马上就要出水了。()A、The anchor will be up in a moment.B、The anchor is clear of the bottom.C、The cable is clear .D、The cables are clear.

考题 下面当主接口由up转为down后哪种说法正确?()A、当主接口由up转为down后,立即切换到备份接口。B、当主接口由down转为up后,立即切换回主接口。C、当主接口由up转为down后,等待一定时间后,若主接口状态仍为down,才切换到备份接口。D、当主接口由down转为up后,等待一定时间后,若主接口状态仍为up,才切换回主接口。

考题 I am weighing up ().A、shacklesB、chainC、anchorageD、anchor

考题 Anchor is across” stands for “()” .A、Anchor is foulingB、Anchor is draggingC、Anchor is up and downD、A and B

考题 锚已抓底了吗?()A、Is the anchor up and down?B、Is the anchor fouling?C、Is the anchor holding?D、Is the anchor across?

考题 锚已离底。()A、Stand by for heaving up!B、Hoist the anchor ball .C、The anchor is clear of the bottom.D、The cable is clear .

考题 When discussing plant maintenance with plant maintenance managers, frequently the topic of using preventive maintenance (PM) comes up. If this is used extensively and the PM work orders are regularly completed, what is told by this about the operation?()A、It is likely that equipment will break down frequently.B、It is likely that equipment will break down infrequently.C、It shows that maintenance is performed on an as needed basis.D、It shows that there are frequent crises when it comes to maintaining equipment.

考题 单选题You are proceeding down a channel and lose the engine(s).You must use the anchors to stop the ship.Which statement is true().A Pay out all of the cable before setting up on the brake to insure the anchors dig in and holdB For a mud,mud and clay,or sandy bottom pay out a scope of 5 to 7 times the depth before setting up on the brakeC Use one or both anchors with a scope of twice the depth before setting the brakeD Drop the anchor to short stay and hold that scope

考题 单选题When discussing plant maintenance with plant maintenance managers, frequently the topic of using preventive maintenance (PM) comes up. If this is used extensively and the PM work orders are regularly completed, what is told by this about the operation?()A It is likely that equipment will break down frequently.B It is likely that equipment will break down infrequently.C It shows that maintenance is performed on an as needed basis.D It shows that there are frequent crises when it comes to maintaining equipment.

考题 单选题锚马上就要出水了。()A The anchor will be up in a moment.B The anchor is clear of the bottom.C The cable is clear .D The cables are clear.

考题 单选题A sea anchor is().A a heavy anchor with an extra long line used to anchor in deep waterB a cone shaped bag used to slow down the wind drift effectC a padeye to which the sea painter is made fastD made of wood if it is of an approved type

考题 单选题In anchor orders, “Up and down” means “()”.A The chain is not uprightB The chain is uprightC The chain is slackD The chain is not slack

考题 单选题Anchor()(垂直).A upB downC up and downD up or down

考题 单选题In anchoring orders, up and down means().A the chain is not uprightB the chain is tightC the chain is uprightD the chain is slack

考题 单选题I am ()up anchor.A weightB heavingC haveD aweigh

考题 单选题In anchoring orders, “Weigh anchor” means “()”.A Pay away the chainB Take in the chainC Check up the chainD Drop the anchor

考题 单选题A sea anchor is().A a heavy anchor with an extra long line used to anchor in deep waterB a cone shaped bag used to slow down the wind drift effectC a pad eye to which the sea painter is made fastD made of wood if it is of an approved type

考题 单选题After deploying the anchor,a permanent chain chaser is().A removed from the anchor chainB connected to a buoy at the anchorC stripped back to the rig and securedD connected to a buoy halfway down the chain

考题 单选题锚已抓底了吗?()A Is the anchor up and down?B Is the anchor fouling?C Is the anchor holding?D Is the anchor across?

考题 单选题键盘事件的执行顺序是()。A Key Press、Key Down、Key UpB Key Down、Key Press、Key UpC Key Up、Key Down、Key PressD Key Up、Key Press、Key Down

考题 单选题Anchor is across” stands for “()” .A Anchor is foulingB Anchor is draggingC Anchor is up and downD A and B

考题 单选题The purpose of storm oil in a sea anchor is to().A weigh down the anchorB lubricate the anchorC repel dangerous fishD smooth the sea