网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()
A
Virtual SCSI
B
Virtual Ethernet
C
Virtual I/O Server
D
Micro-Partitioning
参考答案
参考解析
解析:
暂无解析
更多 “单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()A Virtual SCSIB Virtual EthernetC Virtual I/O ServerD Micro-Partitioning” 相关考题
考题
You are the administrator of two SQL Server 2000 computers. One of these servers contains a 4-GB database named marketing. You want to remove the marketing database from one server and add it to the other as quickly as possible.What should you do?A.Detach the database from the original server by using the sp_detach_db stored procedure. Copy the database and the transaction log files to the new server, and attach them by using the sp_attach_db stored procedure.B.Use the DTS export wizard to transfer all database objects from the original server to the new server. Drop the database from the original server.C.Run a full backup of the database on the original server. Create a new database named marketing on the new server. Restore the backup in the new marketing database. Drop the database from the original server.D.Shut down the original server. Copy the database and the transaction log files to the new server. Use the DISK INIT and DISK REFIT statements to attach the data file to the new server. Drop the database from the original server.
考题
You are the administrator of two Microsoft Windows 2000 advanced server computers. On these servers, you are configuring a database that will store accounting information for your company.The data must be available at all times. Interruptions in data connectivity should not last longer than five minutes. Any changes to the database should not require you to reconfigure the client computers.How should you configure the database?A.Configure the database on the two servers as a SQL Server 2000 cluster.B.Configure the database on one server, and then configure a standby database on the second server.C.Configure the database on each server. Use Microsoft Distributed Transaction Coordinator to keep the two servers perfectly synchronized.D.Configure the database as a federated database, and then partition half the data on each server.
考题
Which components are installed on the middle tier in a WebSphere Commerce V 5.6 three-tier configuration (i.e. in a three-node topology)?()A、WebSphere Commerce Server, WebSphere Application Server and Web server pluginB、WebSphere Application Server, Database Client and Web server pluginC、WebSphere Commerce Server, Database Server and WebSphere Application ServerD、WebSphere Commerce Server, WebSphere Application Server and Database ClientE、Web server, WebSphere Commerce Server and WebSphere Application Server
考题
A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()A、Virtual SCSIB、Virtual EthernetC、Virtual I/O ServerD、Micro-Partitioning
考题
A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()A、Allocate the HBA to a client partition.B、Restart the Virtual I/O Server to detect the changes.C、Install the device driver for the DS8000 in each of the four AIX partitions.D、Allocate the HBA to the VIO server partition and install necessary drivers.
考题
The staff is not able to access a database server. The server has an ’Operating System not found’error and is set to boot from a fiber channel SAN. All other database servers are set to boot from the SAN and access the same switch and data as this database server. Which of the following is the MOST likely cause of the problem?()A、The SAN is offlineB、Fiber channel switchC、Multiple failed drives in the SAND、HBA
考题
The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()A、Add memory to the database partition to improve response time.B、Add additional Host Bus Adapters to the server to improve IO throughput.C、Modify CPU allocations to favor the database partition.D、Increase CPU allocations to the Virtual I/O Server.
考题
The workload requirement for a Web server running in Micro-Partitioned p5-550 has increased 300 percent over the past six months. The initial partition definitions assigned 0.5 processing units and one virtual processor to the Web server partition. Three months previously, an additional 0.5 CPU was added to the Web server partition. When the technical specialist attempted to allocate a further 0.5 CPU to this partition, no additional performance was achieved. Which of the following actions would most likely resolve the problem?()A、Add another virtual Ethernet.B、Change the partition to be uncapped.C、Change the number of virtual processors to 2.D、Increase the amount of memory assigned to the partition by 300 percent.
考题
ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()A、Remove one application server partition and apply its CPU resources to the Web server.B、Reassign the CPU from one of the VIO servers and create the new partition.C、Add 0.6 CPU to one of the application servers and run the Web service with the application. D、Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
考题
Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()A、Create a VLAN between the web server and database server.B、Purchase APV and install the VIOS.C、Increase the priority of the Web server.D、Create separate LPARs for Web and database workloads.
考题
Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()A、Shut down all client partitions before updating the VIO server.B、Disconnect the client partitions from any IP networks before updating the VIO server.C、Update the client partitions to the latest OS maintenance level before updating the VIO Server.D、Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
考题
In a two-tier configuration, it is recommended to put which of the following components on different nodes?()A、Database client and database serverB、WebSphere Application Server and Database ServerC、WebSphere Commerce Server and WebSphere Application ServerD、Web server and WebSphere Application Server
考题
Your SQL Server 2005 database contains a table that has 500 million rows of data. Some of the data is historical and some is current. You need to partition the data on a single server to increase performance and optimize maintenance. What should you do?()A、Implement horizontal partitioning.B、Implement vertical partitioning.C、Implement a raw partition.D、Implement distributed partitioning.
考题
单选题A technical specialist has installed a Host Bus Adapter (HBA) on a p5-550 server. The system has four AIX 5L V5.3 partitions and a Virtual I/O server. The HBA will be used to connect all four partitions to a DS8000 storage array. What else must be performed to make the storage available to the partitions?()A
Allocate the HBA to a client partition.B
Restart the Virtual I/O Server to detect the changes.C
Install the device driver for the DS8000 in each of the four AIX partitions.D
Allocate the HBA to the VIO server partition and install necessary drivers.
考题
单选题Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()A
Shut down all client partitions before updating the VIO server.B
Disconnect the client partitions from any IP networks before updating the VIO server.C
Update the client partitions to the latest OS maintenance level before updating the VIO Server.D
Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
考题
单选题Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()A
Create a VLAN between the web server and database server.B
Purchase APV and install the VIOS.C
Increase the priority of the Web server.D
Create separate LPARs for Web and database workloads.
考题
单选题Company.com has recently received a new p5-570 in the data center and wants to Micro-Partition the server. The customer already has an existing HMC connected to a p690. Which of the following actions should the technical specialist take?()A
Order a POWER5 HMCB
Connect to the existing HMCC
Install an 8-port asynchronous card in the managed server to connect to the existing HMCD
Install an additional network card to the existing HMC and connect to the POWER5 service processor
考题
单选题Company.com has a p5-570 with an application running on each of three Micro-Partitions. The disk I/O is shared through a VIO server. A technical specialist has been asked to upgrade the VIO server. Which of the following procedures should be taken to maintain the integrity of the partitions?()A
Shut down all client partitions before updating the VIO server.B
Disconnect the client partitions from any IP networks before updating the VIO server.C
Update the client partitions to the latest OS maintenance level before updating the VIO Server.D
Update the VIO server while the partitions are running, but reboot each client partition at a convenient time after the update.
考题
单选题The staff is not able to access a database server. The server has an ’Operating System not found’error and is set to boot from a fiber channel SAN. All other database servers are set to boot from the SAN and access the same switch and data as this database server. Which of the following is the MOST likely cause of the problem?()A
The SAN is offlineB
Fiber channel switchC
Multiple failed drives in the SAND
HBA
考题
单选题Company.com has a database application and a Web server application running on the same p5-570 server in a single partition. Recently there have been a number of instances where the increased load on the database server has impacted the performance of the Web server. What can the technical specialist recommend to keep the database application from impacting the performance of the Web server?()A
Create a VLAN between the web server and database server.B
Purchase APV and install the VIOS.C
Increase the priority of the Web server.D
Create separate LPARs for Web and database workloads.
考题
单选题The database on a p5-570 Micro-Partition has grown and backups are not meeting the Service Level Agreement. There are several partitions using the Virtual I/O Server to access the storage array. The database backup has high CPU utilization while the others have low CPU utilization. What adjustment can the technical specialist make to ensure that the Service Level Agreement is achieved?()A
Add memory to the database partition to improve response time.B
Add additional Host Bus Adapters to the server to improve IO throughput.C
Modify CPU allocations to favor the database partition.D
Increase CPU allocations to the Virtual I/O Server.
考题
单选题A system administrator has a pSeries p5-520 2-way with AIX 5L V5.2 with a peak utilization of 50%. There is a request to add a new Web server for a small department. Which of the following solutions is the best fit for this environment?()A
Create a dedicated LPAR for the existing workload and a Micro-Partition for the Web server. B
Create a dedicated LPAR for the existing workload and a dedicated LPAR for the Web server.C
Create a Micro-Partition for the existing workload and a dedicated LPAR for the Web server.D
Create a Micro-Partition for the existing workload and a Micro-Partition for the Web server.
考题
单选题A technical specialist has a requirement to implement a 4-way POWER5 server with a small Web server partition and a high performance database server partition. The Web server provides a client front-end to the database server. The most important concerns are speed of communication between the Web server and the database and I/O speed of the database. Which of the following virtualization features would be most appropriate?()A
Virtual SCSIB
Virtual EthernetC
Virtual I/O ServerD
Micro-Partitioning
考题
单选题ompany.com has a Micro-Partitioned p5-570 4-way with six application partitions and two VIO servers. Each VIO server has been allocated 0.5 CPU and the application servers have been allocated 0.4 CPUs. The marketing department wants to deploy a new Web server to support the release of a product. The systems architect has recommended that the Web server will require a whole CPU. Which of the following should the technical specialist suggest to provide the most cost-effective deployment?()A
Remove one application server partition and apply its CPU resources to the Web server.B
Reassign the CPU from one of the VIO servers and create the new partition.C
Add 0.6 CPU to one of the application servers and run the Web service with the application. D
Reassign a total of 0.4 CPUs from the application servers and create a new partition with awhole CPU for new deployment.
考题
单选题对于Web Server和Database Server同在一台物理服务器上,或者分布在同一个网段内,Web Server访问 Database Server的速度较快,可以把()值设置得小一点.A
ConnectionStringB
ModeC
connectionTimeoutD
Provider
考题
单选题The workload requirement for a Web server running in Micro-Partitioned p5-550 has increased 300 percent over the past six months. The initial partition definitions assigned 0.5 processing units and one virtual processor to the Web server partition. Three months previously, an additional 0.5 CPU was added to the Web server partition. When the technical specialist attempted to allocate a further 0.5 CPU to this partition, no additional performance was achieved. Which of the following actions would most likely resolve the problem?()A
Add another virtual Ethernet.B
Change the partition to be uncapped.C
Change the number of virtual processors to 2.D
Increase the amount of memory assigned to the partition by 300 percent.
考题
单选题Which components are installed on the middle tier in a WebSphere Commerce V 5.6 three-tier configuration (i.e. in a three-node topology)?()A
WebSphere Commerce Server, WebSphere Application Server and Web server pluginB
WebSphere Application Server, Database Client and Web server pluginC
WebSphere Commerce Server, Database Server and WebSphere Application ServerD
WebSphere Commerce Server, WebSphere Application Server and Database ClientE
Web server, WebSphere Commerce Server and WebSphere Application Server
考题
单选题A consultant has been asked to do a performance analysis on a database server. Which subsystem should the consultant first analyze and why?()A
CPU,because the database replication process requires a considerable amount of CPU timeB
Memory,because the buffer cache requires a large amount of memory to maintain the data in system memoryC
Disk,because it is important to configure a sufficient number of disks to match the CPU processing powerD
Network,because the data returned to the client from the server can be a large subset of the total database
热门标签
最新试卷