网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
When the railway is completed, we()get to town much easily.
- A、must
- B、would
- C、are able to
- D、will be able to
参考答案
更多 “When the railway is completed, we()get to town much easily.A、mustB、wouldC、are able toD、will be able to” 相关考题
考题
It has been over a century _______ the railway was completed.
(A)when(B) once(C) which(D) since
考题
Which of the following might be the best title for the passage?A.New Railway StandardsB.Big Railway DreamsC.High—speed Bullet TrainsD.International Railway Network
考题
Hardly _______ the railway station when the train started.A.did I reachB.had I reachedC.I reachedD.I had reached
考题
The rocket will weigh about 200 tons when _____.A. being completedB. completedC. completingD. have been completed
考题
The railway ______________ in three years.
A. is completeB. will completedC. has completedD. will be completed
考题
When the railway is completed, we _____ get to town much easily.
A、is able toB、will be able toC、shall be able toD、would be able to
考题
According to those who welcomed the railway, the railway itself should include all the following except that ______.A) the railway enables people travel fastB) the railway brings comfort to peopleC) the railway makes the world peacefulD) the railway leads the world to war as well
考题
健康教育计划总体目标的三个"W"是指A、when,why,whichB、who,what,whenC、when,why,whatD、when,where,whatE、who,what,why
考题
I travel to the Binhai New Area by light railway every day, _____ do many businessmen who live in downtown Tianjin.A. as B. which C. when D. though
考题
When the copying process is __________ , a small "Done" window appears on the computerscreen,A.entire
B.total
C.complete
D.whole
考题
When the railway is completed, we()get to town much easily.AmustBwouldCare able toDwill be able to
考题
什么是5W1H?()A、What,Where,When,Who,Which,HowB、What,Where,When,Who,Why,HowC、What,Where,When,Which,Why,HowD、以上全部
考题
The Acme company has determined that during its busiest hours, the average number of internal VoIP calls across the WAN link is four (4). Since this is an average, the WAN link has been sized for six (6) calls with no call admission control. What will happen when a seventh call is attempted across the WAN link? ()A、the seventh call is routed via the PSTNB、the call is denied and the original six (6) calls remainC、the call is completed and the first call is droppedD、the call is completed, but all calls have quality issuesE、the call is completed but the seventh call has quality issues
考题
健康计划的总体目标中的三个"W"指()A、who,what,whenB、what,when,whyC、who,what,whichD、what,when,whereE、when,where,which
考题
消费者购买行为的“5W1H”研究方法中,“5W”指的是()A、WHAT、WHICH、WHEN、WHEREandWHOB、WHAT、WHY、WHEN、WHEREandWHOC、WHAT、WHY、WHICH、WHEREandWHOD、WHAT、WHY、WHEN、WHEREandWHICH
考题
单选题A
She felt embarrassed when giving a presentation in class.B
Her presentation received a poor grade.C
She had not completed her assignment.D
She was unable to attend her psychology class.
考题
单选题When the railway is completed, we()get to town much easily.A
mustB
wouldC
are able toD
will be able to
考题
单选题()at the railway station when it began to rain.A
Hardly had he arrivedB
Hardly he had arrivedC
No sooner did he arriveD
No sooner arrived he
考题
单选题The Master of a vessel may tender a Notice of Readiness to the charterer when the vessel ().A
has completed the terms of the charter partyB
is in all respects ready to loadC
is in all respects ready to sailD
is safely moored or at a suitable anchorage
考题
单选题Two MAG4610s are running in an active/passive cluster configuration. The system administrator is planning to apply a service package to the cluster.Which process should the administrator follow?()A
Perform the upgrade on the active node of the cluster. When completed, the node reboots and then pushes the service package to the passive node automatically.B
Perform the upgrade on the passive node of the cluster. When completed, the node reboots and then pushes the service package to the active node automatically.C
On the clustering status page, disable the active node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the passive node.D
On the clustering status page, disable the passive node. Perform the upgrade on the disabled node. When completed and the node reboots, enable the node on the clustering status page.Repeat the process on the active node.
考题
单选题When______, the small factory will make 5 cars a day.A
be completedB
completingC
completedD
to be completed
考题
单选题The distance a vessel moves at right angles to the original course,when a turn of 180°has been completed,is called the().A
advanceB
pivoting pointC
tactical diameterD
kick
考题
填空题When will the installation be completed according to the letter?By ____.
热门标签
最新试卷