以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.
- A、1)严格按配载计划要求执行;2)申请理货;
- B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;
- C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。
- D、以上都对
参考答案
更多 “以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4) No.1 hold bilge, lay wood block; 5) No.1 hold bilge ,lay wood block on tungsten iron and pave canvas on wood block; 6)No.4 hold tweendeck,using rope net separate commodity from stationary.A、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.1舱底舱铺木板;C、5)No.2舱底舱钨铁上铺木板,上面再铺帆布;6)No.4舱二层舱日用品和文具间用绳网隔票。D、以上都对” 相关考题
考题
At which lay er of the OSI model does the Spanning Tree Protocol (STP) operate at()
A.Lay er 5B.Lay er 4C.Lay er 3D.Lay er 2E.Lay er 1
考题
A "chock" is a ______.A.deck fitting used to secure mooring linesB.casting fitted at the side of a weather deck,used as a fairleadC.sharp block of wood used to support hygroscopic cargoD.smoke pipe for the galley stove
考题
You have a quantity of bagged cargo to stow in a block in No.3 UTD.Which stow will provide the maximum block stability ________.A.Half-bag stowB.Bag-on-bag stowC.Alternate layer directionsD.Bilge and cantline
考题
______ refers to the stowage of cargo in a block of two or more adjoining cargo holds with the cargo holds adjacent to the block of loaded cargo holds empty.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Homogeneous hold loading condition
考题
______ is not one of the more commonly adopted solid bulk cargo distributions.A.Alternate hold loading conditionB.Block hold loading conditionC.Part hold loading conditionD.Inhomogeneous hold loading condition
考题
材料:Early on 5 November 1996,the 140,086 tonnes deadweight Malaysian flag bulk carrier Giga 2 was nearing completion of discharge of a cargo of iron ore at No.2 discharge berth,Port KemblA、Due to the vessels light condition,the unloader could not be positioned over No.1 hold,to remove the 1080 tonnes of cargo remaining in that particular hold.At the suggestion of the shift supervisor,ballast was pumped into No.4 hold,which was permissible under the vessels operations manual.Pumping of ballast into No.4 hold commenced at 0530.After the lunch break,two terminal workers descended into No.5 hold,where the unloader was working,to clear iron ore from around the bottom of the forward spiral access ladder.The spiral ladder terminated at the top of the lower stool,six metres above the tank top.They had just completed this task and were about to climb the ladder when the bulkhead to the starboard side of the centre line,between No.5 hold and the ballasted No.4 hold,collapsed.Both workers were immediately engulfed by the deluge and,although one was able to haul himself clear,the other remained submerged.The shift supervisor was working in his office ashore and,alerted by calls over the radio from the Hatchman,dashed on board and immediately descended the ladder into No.5 hold.Up to his neck in the swirling water and guided by the Hatchman above,he was able to grab hold of the submerged worker.Assisted by another terminal worker,who had followed him into the hold,he was able to haul the unconscious and apparently lifeless worker clear of the water.The shift supervisor then administered cardio-pulmonary resuscitation(CPR),which was successful in restoring breathing in the worker.Very shortly afterwards an ambulance officer arrived on the scene and administered oxygen,before the worker was lifted from the hold and taken to hospital.问题:The most probable reason that the unloader could not be positioned over No.1 hold was that ________.A.the trim was too smallB.the trim was too bigC.the draft was too smallD.the draft was too bigNo.4 hold into which ballast water was pumped was a ________.A.special hold which could only be used to adjust the trim and/or draft in cargo operationB.double bottom tank usually not used as ballast tankC.ballast tankD.cargo holdIt is concluded that the depth of ballast water in No.4 Hold ________ before the bulkhead was collapsed.A.less than 1 meterB.around 1 meterC.around 2 metersD.more than 3 metersOf the following,it is ________ that prevented the submerged worker from hauling himself clear when the bulkhead collapsed.A.his weakness or,possibly,his small figureB.the big depth of the ballast waterC.the big distance from the lower stool of the spiral ladder to the tank-top in No.5 HoldD.the strong or swirling current in the ballast water请帮忙给出每个问题的正确答案和分析,谢谢!
考题
According to Paragraph 5,the EEOB’s decoration details( ) A.had almost no cast iron and plaster
B.hardly use of wood for fireproofing
C.are with the materials of granite,bronze,and glass
D.are with carved wood,oriental rugs,and stenciled wall patterns
考题
以下为某散矿船配载图的英文备注,对其识读正确的是() 1)Implement the requirement of Stowage plan strictly; 2)Two round Loading; 3)First round 1000t each hold, separation loading; 4) second round 8000t each hold, separation loading; 5)load evenly as far as possible in the vicinity of hatchway; 6) During loading , care about list and heeling angle do not exceed 3; 7) After loading 800t (flexible weight), please pay attention to satisfy the requirement of draft difference in trim 0.5~ 1.0m .A、1)严格按配载计划要求执行;2)分两轮隔舱装;B、3)第一轮每舱1000t,隔舱装载;4)第二轮每舱8000t,隔舱装载;5)在舱口范围内尽量装平;C、6)装货过程中注意左右均横,横倾角不超过3°;7)装载最后800t(机动重量)时,请注意满足尾倾0.5~1.0m的吃水差要求。D、以上都对
考题
英文备注“Implement the requirement of Stowage plan strictly”的中文意思是:()A、 严格按配载计划要求执行B、 请进行相应的积载工作C、 请根据要求制作积载计D、 积载计划的要求已经确定
考题
以下为某杂货船配载图英文备注,对其识读正确的是() 1) Implement the requirement of Stowage plan strictly; 2) apply tally; 3) the derrick safe working load 3t; 4)No.3 hold tweendeck, fumigation of ship's holds, leave ventilation duct 30 centimeters and lay wood block on it; 5)lay two tiers wood block and one tier mat on China wood oil 、 bauxite 、 sausage skin 、 flint clayA、1)严格按配载计划要求执行;2)申请理货;B、3)吊杆安全负荷量3t;4)No.3舱二层舱烤烟留通风道30厘米,上铺木板;C、5)桐油、铝矾土、肠衣、焦宝石上铺二层木板,一层席子。D、以上都对
考题
英文备注“the derrick safe working load 3t”的中文意思是:()A、吊杆的重量为3tB、吊杆吊起的重量是3tC、吊杆工作时不能吊起3t的货物D、吊杆安全负荷量3t
考题
At which lay er of the OSI model does the Spanning Tree Protocol (STP) operate at()A、Lay er 5B、Lay er 4C、Lay er 3D、Lay er 2E、Lay er 1
考题
In your web application,you need to execute a block of code whenever the session object is first created. Which design will accomplish this goal?()A、Create an HttpSessionListener class and implement the sessionInitialized method with that block ofcode.B、Create an HttpSessionActivationListener class and implement the sessionCreated method with thatblock of code.C、Create a Filter class, call the getSession(false) method, and if the result was null, then execute that block of code.D、Create an HttpSessionListener class and implement the sessionCreated method with that block of code.
考题
When you want to saw metal, ()will be used.A、the hack sawB、the hand sawC、the wood working sawD、wood saw
考题
在1个突发脉冲(burst)中,可能会传送()A、1/8个无线块(Radio Block);B、1/4个无线块(Radio Block);C、1个无线块(Radio Block);D、4个无线块(Radio Block);
考题
While working on the database, you receive the following error: 01578: ORACLE data block corrupted (file# 6, block # 54) ORA-01110 : data file 6: ’u01/oracle/oradata/data1.dbf’ You decide to recover the corrupted data block by using the Block Media Recovery feature. Which option is NOT a disadvantage of using block media recovery?()A、 Block Media Recovery must be used with RMAN.B、 You must perform complete recovery of individual blocks.C、 You must have a full RMAN backup, not an incremental backup.D、 You must use the DBVERIFY utility before using the Block Media Recovery feature.
考题
You need to display a very large single-record data block. Since it will be so large, a convenient means of navigation is needed between items. Which type of canvas would you use to display the data block? ()A、Tab canvas. B、Pop up canvas. C、Spread table canvas. D、Vertical toolbar canvas.
考题
A customer has a requirement for a storage solution that meets the following criteria: (1)Heterogeneous hosts attached (2)Support for block I/O (3)High Speed (4)Scalable Which solution would satisfy the customer’s requirement?()A、SANB、NASC、SCSID、iSCSI
考题
单选题A chock is a().A
deck fitting used to secured mooring linesB
casting fitting at the side of a weatherdeck, used as a fairleadC
sharp block of wood used to support hygroscopic cargoD
smoke pipe for the galley stove
考题
单选题Wood or steel hatch covers are made()by tarpaulins.A
watertightB
resistant to waterC
so safe that no water will affect the holdD
so strong that no water will come into the hold
考题
单选题A chock is a().A
deck fitting used to secure mooring linesB
casting fitted at the side of a weather deck,used as a fairleadC
sharp block of wood used to support hygroscopic cargoD
smoke pipe for the galley stove
考题
单选题An independent bilge suction is required for ().A
ballast tanksB
sludge tanksC
machinery space bilgesD
cargo hold bilges
考题
单选题The space in No.1 lower hold is nearly full up but there is still some()side.A
cabinB
cabinsC
roomD
rooms
考题
单选题It’s()to stow optional cargo in the lower hold.You’d better give it block stowage in the tweendecks,then it can be easily discharged either at Shanghai,or Dalian or Tianjin.A
possibleB
impossibleC
properD
improper
热门标签
最新试卷