网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
A new system of quality control was brought in to overcome the defects in the firm's products.
A: invested
B: introduced
C: installed
D: insisted
B: introduced
C: installed
D: insisted
参考答案
参考解析
解析:句意:质量控制新系统被引进以克服公司生产上的弊端。句中的“bring in”是“引进”的意思,四个选项中:invest意为“投入(资金,时间,精力等)” ; introduce意为“介绍”; install意为“安装”; insist(常与on , that连用)意为“主张、坚持、坚持要求”。
更多 “ A new system of quality control was brought in to overcome the defects in the firm's products.A: invested B: introduced C: installed D: insisted” 相关考题
考题
The key ingredient to a successful quality management program are _____.A . management's quality philosophy, operational quality assurance and operational quality control.B . quality evaluation methods and functional quality integrators.C . technical quality administration, the technical quality specifications, and the quality process review.D . quality evaluation methods, quality progress reviews and the technical quality specifications.E . All of the above.
考题
In the project environment, the individual ultimately responsible for quality control is:A . The line workers who must strive "to do things right the first time" to avoid quality problems.B . the company's quality control manager who must work with the project members to ensure the quality control program is effective.C . The head of the production department who retains ultimate quality control responsibility for all the company's projects.D . The project manager who has ultimate responsibility for the entire project.E . the customer who must ensure that he is receiving a quality product from the vendor.
考题
The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?A . In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.B . the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D . generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E . A and D
考题
The majority of product defects could be prevented in most processes if manufactures would do the following:A . Increase the use of acceptance control charts instead of standard three-sigma control charts.B . Make a concerted effort to eliminate the potential for product defects in the design stage.C . Create a quality control department.D . A and B.E . A and C
考题
Financial compensation is the primary motivational tool for which of the following management theories of programs.A . Zero-defects program.B . theory X management.C . theory Y management.D . Quality control circles.E . A and C
考题
VThe Pareto Principle is a technique used to determine which quality control problems in a particular process should be corrected. Which of the following statements best represents the philosophy employed by this principle?A . In order to minimize financial losses from quality control problems, all problems which have a measureable cost should be correctedB . the majority of defects are caused by a small percentage of the identifiable problems. Improvement efforts should be reserved for these vital problems.C . in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D . generally, 80% of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E . A and D
考题
Japanese quality control has improved dramatically in the last 30 years for all of the following reasons except:A . the use of quality circles.B . small, continuous improvements in quality control.C . the use of worker suggestion systems.D . the use of quality control charts.E . focusing quality control efforts on production outputs.
考题
Which of the following constitute Juran's "quality trilogy":A . planning, inspection, control.B . planning, improvement, control.C . planning, organization, control.D . product, price, customer.E . design, build, deliver.
考题
32 Financial compensation is the primary motivational tool for which of the following management theories of programs.A. Zero-defects program.B. theory X management.C. theory Y management.D. Quality control circles.E. A and C
考题
41 In the project environment, the individual ultimately responsible for quality control is:A. The line workers who must strive "to do things right the first time" to avoid quality problems. B. the company's quality control manager who must work with the project members to ensure the quality control program is effective.C. The head of the production department who retains ultimate quality control responsibility for all the company's projects.D. The project manager who has ultimate responsibility for the entire project.E.the customer who must ensure that he is receiving a quality product from the vendor
考题
48 The majority of product defects could be prevented in most processes if manufactures would do the following:A. Increase the use of acceptance control charts instead of standard three-sigma control charts.B. Make a concerted effort to eliminate the potential for product defects in the design stage.C. Create a quality control department.D. A and B.E. A and C
考题
158 The Pareto Principle is a technique used by quality managers to determine which quality control problems of a particular service or manufacturing process should be corrected. Which of the following statements represents the philosophy of the principle?A. In order to minimize financial losses from quality control problems, all problems which have a measurable cost associated with them should be corrected.B. the majority of defects are caused by a small percentage of the identifiable problems. Improvements efforts should be reserved for these vital few problems.C. in order to achieve zero defects, all quality control problems, including those which do not have a direct financial cost should be corrected.D. generally, 80 % of the quality control problems are justifiable for correction via cost-benefit analysis. The remaining 20% are not financially worthy of improvement efforts.E. A and D
考题
87 The key ingredient to a successful quality management program are _____.A. management's quality philosophy, operational quality assurance and operational quality control. B. quality evaluation methods and functional quality integrators.C. technical quality administration, the technical quality specifications, and the quality process review. D. quality evaluation methods, quality progress reviews and the technical quality specifications.E. All of the above
考题
(ii) Discuss TWO problems that may be faced in implementing quality control procedures in a small firm ofChartered Certified Accountants, and recommend how these problems may be overcome. (4 marks)
考题
new regulations ________ last year to control airline safety.
A. introducedB. were introducedC. introducingD. was introduced
考题
The government introduced new regulations ____inflation(通货膨胀)might be brought under control.A. forB. becauseC. so thatD. as for
考题
A user’s laptop does not produce sound even though the volume settings are at maximum in theoperating system. Which of the following would MOST likely resolve this issue?()
A. A new sound cardB. A new speakerC. A BIOS updateD. A hardware volume control
考题
Change control within information technology(IT)systems is a formal process used to ensure that changes to product or system are introduced in a controlled and coordinated manner.It(74)the possibility that unnecessary changes will be introduced to a systeA.Adds
B.Removes
C.Produces
D.Reduces
考题
A new floppy drive was just installed into a PC. The drive powers on at system boot but the status LED does not turn off during operation. Which of the following is MOST likely the issue?()A、The power cable was installed incorrectly and needs to be flipped.B、The floppy drive was not enabled within the motherboard’s BIOS.C、The FDD cable was installed incorrectly and needs to be flipped.D、A Molex power cable was used instead of a Berg cable.
考题
You work as the IT professional in an international company which is named Wiikigo. You are experiencedin implementing and administering a network operating system. You are specialized in deploying servers,configuring Windows Server 2008 Terminal services and network application services, and configuring aweb services infrastructure. You perform the installation of a new server named S01 that runs WindowsServer 2008. The server has the Streaming Media Services server role installed. You install and activateall Windows Media Services control protocols. Users connect to S01 locally and remotely through afirewall. Now you receive an order from the company management. According to the company requirement, you should make sure that the protocol rollover will occur only if the users are accessing S01from the Internet. What action should you perform?()A、In order to make sure of this, the Reliable Multicast Protocol should be installed on S01.B、In order to make sure of this, users should be enabled to access the streaming media by usingannouncements.C、In order to make sure of this, the Quality of Service (QoS) service should be installed on the networkadapter.D、In order to make sure of this, the firewall should be configured to forward incoming port 1755 traffic toS01.
考题
A user’s laptop does not produce sound even though the volume settings are at maximum in theoperating system. Which of the following would MOST likely resolve this issue?()A、A new sound cardB、A new speakerC、A BIOS updateD、A hardware volume control
考题
A technician is performing a memory upgrade by installing an additional 1GB stick of DDR RAM into a system. When the installation is complete, the computer shows 2GB of RAM at POST; however, it now indicates a lower speed setting for the memory. Which of the following is the MOST likely cause?()A、The newly installed RAM has a lower clock speed than the existing RAM.B、The CPU is not configured to work with the additional RAM.C、The system is incompatible with the new RAM.D、The new RAM is of lower quality, and not dependable at higher speeds.
考题
What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A、The new system requires 1 installed processor card for the GX++ bus adapterB、The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC、The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD、The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
考题
单选题A technician is performing a memory upgrade by installing an additional 1GB stick of DDR RAM into a system. When the installation is complete, the computer shows 2GB of RAM at POST; however, it now indicates a lower speed setting for the memory. Which of the following is the MOST likely cause?()A
The newly installed RAM has a lower clock speed than the existing RAM.B
The CPU is not configured to work with the additional RAM.C
The system is incompatible with the new RAM.D
The new RAM is of lower quality, and not dependable at higher speeds.
考题
单选题What is a design consideration when using existing PCIe I/O drawers in a maximum bandwidth/throughput configuration on a new Power 750 system?()A
The new system requires 1 installed processor card for the GX++ bus adapterB
The new system requires a minimum of 2 installed processor cards for the GX++ bus adapterC
The new system requires a minimum of 3 installed processor cards and the HPC InfiniBand cluster adapterD
The new system requires 1 installed processor card for the GX++ bus adapter and the HPC InfiniBand cluster adapter
热门标签
最新试卷