网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()
A
Approved (APPR)
B
Waiting on Materials (WMATL)
C
Waiting to be Scheduled (WSCH)
D
Waiting on Plant Condition (WPCOND)
参考答案
参考解析
解析:
暂无解析
更多 “单选题A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A Approved (APPR)B Waiting on Materials (WMATL)C Waiting to be Scheduled (WSCH)D Waiting on Plant Condition (WPCOND)” 相关考题
考题
What do you think of the work Tom has done recently? I feel ()that the work shouldn‘t have been done so carelessly.
A、badlyB、directlyC、stronglyD、hardly
考题
● Project (69) Management includes the processes required to ensure thatthe project includes all the work required, and only the work required, tocomplete the project successfully.tA.IntegrationB.ScopeC.ConfigurationD.Requiremen
考题
All the money ______, Frederick started looking for work.A. having spentB. has been spentC. having been spentD. had been spent
考题
Within the team, a work plan can tell each member what()and why.A. is being doneB. has doneC. has been done
考题
Project(69)Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A.IntegrationB.ScopeC.ConfigurationD.Requirement
考题
The project budget has been finalized.Additional work has been discovered that was not planned for in the budget or project scope. (74) could provide the fund to cover the newly discovered work item.A.Contingency reserve
B.Project profit
C.Management reserve
D.Special fund
考题
—have to go to work by taxi because my ear__________at the garage.A.will be repaired
B.is repaired
C.is being repaired
D.has been repaired
考题
()includes the processes required to ensure that the project includes all the work required,and only the work required,to compete the project successfully.Managing the project scope is primarily concerned with defining and controlling what is not included in the project.A:Create scopE
B:Project stakeholder management
C:Project scope management
D:Project cost management
考题
The work()by the time you get there.A、will have been doneB、was doneC、had been doneD、has done
考题
A system administrator has been instructed to verify that all filesets have all required requisites and are completely installed. Which command will provide this information?()A、lslppB、lppchkC、instfixD、installp
考题
Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A、IntegrationB、ScopeC、ConfigurationD、Requirement
考题
A customer has just purchased six x346 servers running Windows 2003 Web Edition.They are expecting to add six additional x346’s in three months.They have a requirement to automatically deploy the current server image upon the new servers. What TWO actions are required to complete this task?()A、Ensure Director Agent is installed on the new servers.B、Ensure a DHCP Sever is installed and configured in the environment.C、Ensure Server Plus Pack option has been installed and configured.D、Ensure Software Distribution has been installed on the IBM Director Server and an image has been created.E、Ensure Remote Deployment Manager has been installed on the IBM Director Server and an image has been created.
考题
A System p administrator has been instructed to verify that all filesets have all required requisitesand are completely installed. Which of the following commands will provide this information()A、lslppB、lppchkC、geninstallD、installp
考题
A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()A、All maintenance personnel have full access to all records.B、All maintenance personnel have read-only access to all data. C、Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.D、Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.
考题
Which two applications can be used to view actual costs for labor, materials, services, and tools?()A、 Labor ReportingB、 Quick ReportingC、 Work Order TrackingD、 Assignment ManagerE、 Work Order Management
考题
A work order has been created to perform corrective maintenance on a defective generator. All required information has been provided in the work order, but required materials are not in stock and have to be ordered. What is the status of the work order, after a maintenance manager has approved the work order? ()A、 Approved (APPR)B、 Waiting on Materials (WMATL)C、 Waiting to be Scheduled (WSCH)D、 Waiting on Plant Condition (WPCOND)
考题
单选题Which of the following is required to ensure the completion of all tests within the automated procedure of thecluster test tool?()A
Application monitoring has been configuredB
Only disk heartbeat networks have been usedC
Cluster nodes are attached to two IP networksD
Resource Group dependencies have been configured
考题
单选题A System p administrator has been instructed to verify that all filesets have all required requisitesand are completely installed. Which of the following commands will provide this information()A
lslppB
lppchkC
geninstallD
installp
考题
单选题A company just hired a new plant maintenance manager, and they are concerned about the number of corrupt asset records in the present system. In future they want to prevent this from happening. When implementing the new solution, what is recommended?()A
All maintenance personnel have full access to all records.B
All maintenance personnel have read-only access to all data. C
Only a very limited number of personnel have full access to static data records, but all maintenance personnel are able to enter work order data.D
Maintenance personnel should not be using the system, and should only write entries on printed work orders and hire input clerks to enter these into the system.
考题
单选题A system administrator has been instructed to verify that all filesets have all required requisites and are completely installed. Which command will provide this information?()A
lslppB
lppchkC
instfixD
installp
考题
单选题Project () Management includes the processes required to ensure that the project includes all the work required, and only the work required, to complete the project successfully.A
IntegrationB
ScopeC
ConfigurationD
Requirement
考题
单选题What are the conditions,under GMDSS,whereby a ship is NOT allowed to depart from any port? ()A
The vessel is not capable of performing all required distress and safety functionsB
The vessel is carrying more than the required number of qualified GMDSS radio operatorsC
The vessel has a temporary waiver of its radio license and Safety CertificateD
The vessel is not carrying a GMDSS radio maintainer,but has provided for shoreside maintenance plus duplication of equipment if required
考题
单选题Project()Management includes the processes required to ensure that theproj ect includes all the work required, and only the work required, to complete the project successfully.A
IntegrationB
ScopeC
ConfigurationD
Requirement
考题
单选题Using the C-SPOC utilities, an administrator has created a new volume group and filesytems. Theadministrator performs an Isvg -I command on the volume group and notices that the log logical volume created in C-SPOC is closed/syncd and loglv01 has been created and is in use. What step was required in order for the logfile created by C-SPOC to be used.()A
Perform the C-SPOC logform utility option prior to creating any filesystems.B
Manually perform a logform outside of C-SPOC prior to creating any filesystems.C
Run a logredo command and select log logical volume created in C-SPOC as the preferred jfslog.D
Use C-SPOC to delete and recreate the log logical volume,set the perform logform option to true.
考题
单选题What does the review state about the book?A
It has been comprehensively researched.B
It is not a professional piece of work.C
It deals with the subject impartially.D
It does not have a list of sources.
热门标签
最新试卷