A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()
A
The p5-570 is rack mounted but the p5-550 is not.
B
The p5-570 will provide more growth, but at a higher cost.
C
The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.
D
The p5-570 needs a special feature to become a deskside machine.
参考答案
参考解析
解析:
暂无解析
更多 “单选题A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A The p5-570 is rack mounted but the p5-550 is not.B The p5-570 will provide more growth, but at a higher cost.C The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D The p5-570 needs a special feature to become a deskside machine.” 相关考题
考题
Which Oracle Database component is audited by default if the unified Auditing option is enabled?()A、Oracle Data PumpB、Oracle Recovery Manager (RMAN)C、Oracle Label SecurityD、Oracle Database VaultE、Oracle Real Application Security
考题
You have two databases, FINDB and PAYDB, on single operating system and using Optimal Flexible architecture (OFA). FINDB is functional and is currently being accessed by the users. While starting up the instance for the PAYDB database you get the following error: ORA-01081: cannot start - already running ORACLE - shut it down first Which environmental variable would you set before starting up the PAYDB database to overcome this error?()A、ORA_PATHB、ORACLE_SIDC、ORACLE_BASED、ORACLE_HOMEE、LD_LIBRARY_PATH
考题
What are two components of the Discovery Guide in the Cisco sales approach?()A、calculating the customer's businessneed prioritiesB、recommending a business needs-based solutionC、ranking customer business needsD、probing more deeply into the customer's business challenges
考题
A major account is considering migrating from a proprietary Unix server to a Linux and Intel-based platform. They are not sure if the Intel-based server will be able to handle the workload of the Unix server. What would be the best strategy to win with an IBM solution?()A、Suggest to the customer to send their administrator to IBM System x training class to learn more about IBM Intel based servers.B、Propose a try and buy option and offer to help the customer in sizing the new Linux server. Engage the system Engineer on this opportunity.C、Introduce the IBM pSeries Unix product specialist to the account because IBM operating system (AIX) offers an open Unix solution.D、Direct the customer to the IBM Web site to help with sizing and System x server models and types. Follow-up with the customer to answer any sizing question.
考题
A company needs additional storage for a block I/O based database application. The application has low I/O bandwidth requirements across the campus. The customer has a TCP/IP infrastructure and is interested in low-cost products that are compatible with its environment. Which technology is most appropriate for this customer?()A、SANB、FCoEC、FCIPD、iSCSI
考题
A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A、An IBM BladeCenter H chassis for the JS22 Blade serversB、A concurrent KVM daughter cardC、A pair of IBM BladeCenter Power SuppliesD、A second Management Module
考题
A customer needs a new database server. Their third-party application requires Microsoft SQL Server. They have 100 users who will login to the network and store their data files on the network server. They will also require the server to be an email server and to deploy a central antivirus solution. Which of the following network operating systems would satisfy these requirements?()A、SuSE Linux Enterprise 9B、Red Hat Linux Advanced Server 3C、Microsoft Windows 2003 Server Web EditionD、Microsoft Windows 2003 Server Standard Edition
考题
A customer is planning on establishing a Global Mirror between two Storwize V7000 storagearrays. The customer is planning to lease an IP WAN connection between sites for the tasks andis running a SAP (database) application on Oracle. Which of the following planning considerationsis most important?()A、the distance between sites needs to be less than 100 kilometersB、consistency groups should be created to maintain write order on the remote mirrorC、ensure sufficient bandwidth exists on the link based on average application workloadsD、ensuring a low round trip latency of less than 30ms on the WAN connection is required
考题
A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A、Configure a 2 node x3950 X5 B、Customer needs a System p server to support Oracle applications C、Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D、Configure a system that meets the minimum requirements
考题
An online retailer is considering deploying a database application on xSeries and Windows to serve their Web-based transactions. The database will need about 4TB of usable storage. Downtime costs the customer tens of thousands of dollars per minute, so system availability will be of highest priority. The customer needs to acquire the system within a certain budget but will pay for things that provide higher system availability. Which of the following will be the most appropriate solution?()A、A dual pathed switched DS4000 Solution with Clustering, Remote replication, Redundant NICs, and Fibre attached backupB、A single path Direct attach DS4000 solution implemented with Clustering and SAN Based Backup combined with IBM Director for PFA managementC、A dual pathed Direct Attach fibre solution, along with dual NICs and memory mirroringD、An iSCSI solution with dual NIC’s with the Flashcopy option enabled on the DS300
考题
A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A、The p5-570 is rack mounted but the p5-550 is not.B、The p5-570 will provide more growth, but at a higher cost.C、The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D、The p5-570 needs a special feature to become a deskside machine.
考题
A customer needs to implement a Highly Available solution for JMS that has a primary data center and a backup. Which three steps would you perform when designing your solution?()A、Store Transaction Logs in a database and use Database stores for JMS to make replication between sites easier.B、Use file based Transaction Logs and JMS stores and implement a separate replication solution for files in addition to database in case database replication fails.C、Implement Oracle RAC at each site to provide a highly available solution within each datacenter.D、Configure Whole Server Migration to migrate WebLogic Managed Servers from the primary to the secondary site.E、Configure Automatic Service Migration for JMS high availability within a datacenter.
考题
You write a procedure that will be called from two level triggers and a database trigger. Where should you store this code? ()A、On the Oracle server. B、Locally in each form module. C、In an attached PL/SQL library D、On your file network server.
考题
单选题A customer needs to add three JS22 blade servers. The customer currently has three HS21 Blade servers and one LS41 4-socket Blade Server. Based upon this information, what additional items does the customer need to purchase? ()A
An IBM BladeCenter H chassis for the JS22 Blade serversB
A concurrent KVM daughter cardC
A pair of IBM BladeCenter Power SuppliesD
A second Management Module
考题
单选题An online retailer is considering deploying a database application on xSeries and Windows to serve their Web-based transactions. The database will need about 4TB of usable storage. Downtime costs the customer tens of thousands of dollars per minute, so system availability will be of highest priority. The customer needs to acquire the system within a certain budget but will pay for things that provide higher system availability. Which of the following will be the most appropriate solution?()A
A dual pathed switched DS4000 Solution with Clustering, Remote replication, Redundant NICs, and Fibre attached backupB
A single path Direct attach DS4000 solution implemented with Clustering and SAN Based Backup combined with IBM Director for PFA managementC
A dual pathed Direct Attach fibre solution, along with dual NICs and memory mirroringD
An iSCSI solution with dual NIC’s with the Flashcopy option enabled on the DS300
考题
多选题You support Oracle Database 12c Oracle Database 11g, and Oracle Database log on the same server. All databases of all versions use Automatic Storage Management (ASM). Which three statements are true about the ASM disk group compatibility attributes that are set for a disk group?()AThe ASM compatibility attribute controls the format of the disk group metadata.BRDBMS compatibility together with the database version determines whether a database Instance can mount the ASM disk group.CThe RDBMS compatibility setting allows only databases set to the same version as the compatibility value, to mount the ASM disk group.DThe ASM compatibility attribute determines some of the ASM features that may be used by the Oracle disk group.EThe ADVM compatibility attribute determines the ACFS features that may be used by the Oracle 10g database.
考题
多选题SQ L*Loader is a utility that can perform which two tasks?()ALoad data from a disk, tape, or named pipes.BLoad data into an Oracle database using DML statements.CExtract, reorganize, and insert data within an Oracle database.DLoad data from external files into tables in an Oracle database.ELoad data into an Oracle database using operating system commands.FLoad data directly from a non-Oracle database to an Oracle database.
考题
单选题Oracle Grid Infrastructure for a stand-alone server is installed on your production host before installing the Oracle Database server. The database and listener are configured by using Oracle Restart. Examine the following command and its output: $ crsctl config has CRS-4622: Oracle High Availability Services auto start is enabled. What does this imply?()A
When you start an instance on a high with SQL *Plus dependent listeners and ASM disk groups are automatically started.B
When a database instance is started by using the SRVCTL utility and listener startup fails, the instance is still started.C
When a database is created by using SQL* Plus, it is automatically added to the Oracle Restart configuration.D
When you create a database service by modifying the SERVICE_NAMES initialization parameter, it is automatically added to the Oracle Restart configuration.
考题
单选题A customer needs an Oracle Database Server. Based on the customer’s sizing data, the IBM Oracle Competency Center has determined that the server requirements can be met with a 4-way p5-550 or a 4-way p5-570. If the pSeries technical specialist proposes a p5-570 versus a p5-550 system, what key differences should be pointed out to the customer?()A
The p5-570 is rack mounted but the p5-550 is not.B
The p5-570 will provide more growth, but at a higher cost.C
The p5-570 is 200-240 volt only and the p5-550 is 110 volt only.D
The p5-570 needs a special feature to become a deskside machine.
考题
单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A
Create capped partitions for the database servers.B
Create workload partitions for the database servers.C
Create a separate shared processor pool for the database servers.D
Create virtual processors equal to the entitlement for database servers.
考题
单选题You write a procedure that will be called from two level triggers and a database trigger. Where should you store this code? ()A
On the Oracle server. B
Locally in each form module. C
In an attached PL/SQL library D
On your file network server.
考题
单选题You are using the Database Configuration Assistant to configure your Oracle database. Which of the following terms pertains to the creation of an object from which creation of the other database can be based? ()A
Clone B
Copy C
Template D
Terminal
考题
单选题A customer needs to install a database on a server. Which of the following statements describes how to modify the RAID configuration for optimal performance?()A
Place both the database and transaction log on two logical drives in one RAID-10 arrayB
Place both the database and transaction log on two logical drives in one RAID-1E arrayC
Place the database on a RAID-1E array and place the transaction log on a separate RAID-5 arrayD
Place the database on a RAID-5 array and place the transaction log on a separate RAID-1E array
考题
单选题Note the following points describing various utilities in Oracle Database 11g: 1:It enables the high-speed transfer of data from one database to another. 2:It provides a complete solution for the backup, restoration, and recovery needs of the entire database. 3:It enables the loading of data from an external file into an Oracle database. 4:It provides a tape backup management for the Oracle ecosystem. Which point describes Oracle Secure Backup()A
1B
2C
3D
4E
1,2,and 4F
1,2,3,and 4
考题
单选题A customer is looking at an Oracle eBusiness solution. They would like to know what hardware they will need for the solution. They have some preliminary information from Oracle, including hardware requirements and specifics for their environment. Which of the following should be done next?()A
Configure a 2 node x3950 X5 B
Customer needs a System p server to support Oracle applications C
Download the Oracle eBusiness sizing questionnaire from IBM, fill out with customer and submit to IBM for System x sizing D
Configure a system that meets the minimum requirements
考题
多选题A customer needs to implement a Highly Available solution for JMS that has a primary data center and a backup. Which three steps would you perform when designing your solution?()AStore Transaction Logs in a database and use Database stores for JMS to make replication between sites easier.BUse file based Transaction Logs and JMS stores and implement a separate replication solution for files in addition to database in case database replication fails.CImplement Oracle RAC at each site to provide a highly available solution within each datacenter.DConfigure Whole Server Migration to migrate WebLogic Managed Servers from the primary to the secondary site.EConfigure Automatic Service Migration for JMS high availability within a datacenter.
考题
单选题Note the following points describing various utilities in Oracle Database 1g:1. It enables the high-speed transfer of data from one database to another. 2. It provides a complete solution for the backup, restoration, and recovery needs of the entire database.3. It enables the loading of data from an external file into an Oracle database.4. It provides a tape backup management for the Oracle ecosystem. Which point describes Oracle Secure Backup()A
1B
2C
3D
4E
1, 2, and 4F
1, 2, 3, and 4
考题
单选题A customer has 4 application and 2 database servers that will be installed in partitions on a Power 750. They are concerned that the database software vendor will charge based on every processor core in the server. Which action will reduce the potential vendor software costs?()A
Create capped partitions for the database servers.B
Create workload partitions for the database servers.C
Create a separate shared processor pool for the database servers.D
Create virtual processors equal to the entitlement for database servers.