网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().
A

noted by the bridge officer

B

told by last duty engineer

C

observed

D

in the instruction manual


参考答案

参考解析
解析: 暂无解析
更多 “单选题At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().A noted by the bridge officerB told by last duty engineerC observedD in the instruction manual” 相关考题
考题 –What time is it? –____________________. (A) My watch keeps good time(B) My watch is five minutes fast(C) My watch says three o’clock(D) I say three o’clock

考题 That is my watch.(改为否定句)________ ________ my watch.

考题 Boston Company, an electing S corporation, has an operating loss of $400,000 for the current year. Hank owns a 40% interest in the company and is a material participant. At the beginning of the year, Hank's adjusted basis in the stock is $30,000. During the year the company borrows $100,000 with a recourse note. How much of the loss can Hank deduct on his current-year income tax return?()A.$0B.$30,000C.$70,000D.$160,000E.$200,000

考题 ClicktheExhibitbutton.Given:10.11.ProductName:12.ProductPrice:13.Foragivenproductinstance,whichthreejsp:setPropertyattributesmustbeusedtoinitializeitspropertiesfromtheHTMLform?() A.idB.nameC.typeD.paramE.property

考题 AJSPpageneedstosetthepropertyofagivenJavaBeantoavaluethatiscalculatedwiththeJSPpage.Whichthreejsp:setPropertyattributesmustbeusedtoperformthisinitialization?() A.IdB.ValC.NameD.ParamE.ValueF.Property

考题 听力原文:Other aspects of operational risk include major failure of information technology systems or events such as major fires or other disasters.(6)A.Information technology system can cause operational risk.B.A major fire can be a cause of operational risk.C.The most important types of operational risk involve breakdowns in internal controls and corporate governance.D.Other aspects of operational risk include firing its dealers, lending officers or other staff exceeding their authority or conducting business in an unethical or risky manner.

考题 At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with thoseA.noted by the bridge officerB.told by last duty engineerC.observedD.in the instruction manual

考题 Tested & inspected the steering systems & other navigational equipments & found them in good condition.L'dg & unl'dg finished.This remark is likely made by the OOW ______.A.at the beginning of his watchB.during his watchC.at the end of his watchD.in his cargo watch on deck

考题 小心碰头!()A、Mind your head.B、Watch your head.C、Watch your step.D、Watch your walking.

考题 In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD、the optimal technologies for supporting its business requirements and objectives

考题 What information does the help reference command provide?()A、A brief description of commands and their default valuesB、The serial number and version number of the device used to open a support case with JTACC、A list of all the active hardware alarms on the deviceD、A display of the current configuration while in operational mode

考题 What is the key objective of the plan phase? Select exactly 1 answer(s) from the following:()。A、identify the activities involved in installing and configuring equipment at a customer’s site or sitesB、Describe the day-to-day activities required to support, manage, and monitor a newly implemented systemC、Assess current network readiness, site readiness, and operational readiness in preparation for designing a solution proposalD、Gain an understanding of high-level business and technical requirement

考题 Which two of these correctly describe asymmetric routing and firewalls?()A、only operational in routed modeB、only operational in transparent modeC、only eight interfaces can belong to an asymmetric routing groupD、operational in both failover and non-failover configurationsE、only operational when the firewall has been configured for failover

考题 A JSP page needs to set the property of a given JavaBean to a value that is calculated with the JSP page. Which three jsp:setProperty attributes must be used to perform this initialization?()A、IdB、ValC、NameD、ParamE、ValueF、Property

考题 Because of a power outage, instance failure has occurred. From what point in the redo log does recovery begin and where does it end?()A、current redo log and inactive redo logB、checkpoint position to end of redo logC、beginning of redo log to end of redo logD、all redo logs before the point of last commitE、beginning of redo log to checkpoint position

考题 填空题Blanc likes to watch football games. He also likes to watch basketball games.→ Blanc likes to watch ____ football games ____ basketball games.

考题 单选题What information does the help reference command provide?()A A brief description of commands and their default valuesB The serial number and version number of the device used to open a support case with JTACC A list of all the active hardware alarms on the deviceD A display of the current configuration while in operational mode

考题 单选题There will usually be summaries or daily account tables for heavy oil, diesel oil, lubricating oil, and fresh water, which will be compiled()A at the beginning of every watchB at the beginning of the first watch every dayC at the completion of every watchD at noon every day

考题 单选题What is the key objective of the plan phase?()A Identify the activities involved in installing and configuring equipment at a customer’s site or sitesB Describe the day-to-day activities required to support, manage, and monitor a newly implemented systemC Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposalD Gain an understanding of high-level business and technical requirements

考题 单选题驾驶台始终有驾驶员值班。()A Sailors are always on watch on the bridge.B Deck officers are always on watch on the bridge.C Sailors are never on watch on the bridge.D Deck officers are never on watch on the bridge.

考题 单选题In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD the optimal technologies for supporting its business requirements and objectives

考题 单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()A a watch which is kept with lower standardB a watch which is kept when the ship isnt sailingC a watch which is kept when the ship is sailingD a watch which is kept when the ship is in a restricted visibility area

考题 多选题Which two of these correctly describe asymmetric routing and firewalls?()Aonly operational in routed modeBonly operational in transparent modeConly eight interfaces can belong to an asymmetric routing groupDoperational in both failover and non-failover configurationsEonly operational when the firewall has been configured for failover

考题 单选题At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().A noted by the bridge officerB told by last duty engineerC observedD in the instruction manual

考题 单选题Wat is NOT required in the radiotelephone log?()A Distress and alarm signals transmitted or interceptedB Times of beginning and end of watch periodC Routine navigational trafficD Daily statement about the condition of the required radiotelephone equipment

考题 单选题In the Oil Record Book, a comprehensive list of operational items are grouped into operational sectionsEach section is codified by a/an ().A numberB abbreviationC letterD All of the above

考题 单选题The SMS should provide for specific measures aimed at promoting the reliability of equipment or systems () may result in hazardous situations.A which the sudden operational failureB that the sudden operational failureC the sudden operational failureD the sudden operational failure of which

考题 单选题However much______, it will be worth the price.A does the watch costB costs the watchC the watch will costD the watch costs