网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().
A
noted by the bridge officer
B
told by last duty engineer
C
observed
D
in the instruction manual
参考答案
参考解析
解析:
暂无解析
更多 “单选题At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().A noted by the bridge officerB told by last duty engineerC observedD in the instruction manual” 相关考题
考题
–What time is it? –____________________.
(A) My watch keeps good time(B) My watch is five minutes fast(C) My watch says three o’clock(D) I say three o’clock
考题
Boston Company, an electing S corporation, has an operating loss of $400,000 for the current year. Hank owns a 40% interest in the company and is a material participant. At the beginning of the year, Hank's adjusted basis in the stock is $30,000. During the year the company borrows $100,000 with a recourse note. How much of the loss can Hank deduct on his current-year income tax return?()A.$0B.$30,000C.$70,000D.$160,000E.$200,000
考题
ClicktheExhibitbutton.Given:10.11.ProductName:12.ProductPrice:13.Foragivenproductinstance,whichthreejsp:setPropertyattributesmustbeusedtoinitializeitspropertiesfromtheHTMLform?()
A.idB.nameC.typeD.paramE.property
考题
AJSPpageneedstosetthepropertyofagivenJavaBeantoavaluethatiscalculatedwiththeJSPpage.Whichthreejsp:setPropertyattributesmustbeusedtoperformthisinitialization?()
A.IdB.ValC.NameD.ParamE.ValueF.Property
考题
听力原文:Other aspects of operational risk include major failure of information technology systems or events such as major fires or other disasters.(6)A.Information technology system can cause operational risk.B.A major fire can be a cause of operational risk.C.The most important types of operational risk involve breakdowns in internal controls and corporate governance.D.Other aspects of operational risk include firing its dealers, lending officers or other staff exceeding their authority or conducting business in an unethical or risky manner.
考题
At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with thoseA.noted by the bridge officerB.told by last duty engineerC.observedD.in the instruction manual
考题
Tested & inspected the steering systems & other navigational equipments & found them in good condition.L'dg & unl'dg finished.This remark is likely made by the OOW ______.A.at the beginning of his watchB.during his watchC.at the end of his watchD.in his cargo watch on deck
考题
In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A、an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB、a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC、an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD、the optimal technologies for supporting its business requirements and objectives
考题
What information does the help reference command provide?()A、A brief description of commands and their default valuesB、The serial number and version number of the device used to open a support case with JTACC、A list of all the active hardware alarms on the deviceD、A display of the current configuration while in operational mode
考题
What is the key objective of the plan phase? Select exactly 1 answer(s) from the following:()。A、identify the activities involved in installing and configuring equipment at a customer’s site or sitesB、Describe the day-to-day activities required to support, manage, and monitor a newly implemented systemC、Assess current network readiness, site readiness, and operational readiness in preparation for designing a solution proposalD、Gain an understanding of high-level business and technical requirement
考题
Which two of these correctly describe asymmetric routing and firewalls?()A、only operational in routed modeB、only operational in transparent modeC、only eight interfaces can belong to an asymmetric routing groupD、operational in both failover and non-failover configurationsE、only operational when the firewall has been configured for failover
考题
A JSP page needs to set the property of a given JavaBean to a value that is calculated with the JSP page. Which three jsp:setProperty attributes must be used to perform this initialization?()A、IdB、ValC、NameD、ParamE、ValueF、Property
考题
Because of a power outage, instance failure has occurred. From what point in the redo log does recovery begin and where does it end?()A、current redo log and inactive redo logB、checkpoint position to end of redo logC、beginning of redo log to end of redo logD、all redo logs before the point of last commitE、beginning of redo log to checkpoint position
考题
填空题Blanc likes to watch football games. He also likes to watch basketball games.→ Blanc likes to watch ____ football games ____ basketball games.
考题
单选题What information does the help reference command provide?()A
A brief description of commands and their default valuesB
The serial number and version number of the device used to open a support case with JTACC
A list of all the active hardware alarms on the deviceD
A display of the current configuration while in operational mode
考题
单选题There will usually be summaries or daily account tables for heavy oil, diesel oil, lubricating oil, and fresh water, which will be compiled()A
at the beginning of every watchB
at the beginning of the first watch every dayC
at the completion of every watchD
at noon every day
考题
单选题What is the key objective of the plan phase?()A
Identify the activities involved in installing and configuring equipment at a customer’s site or sitesB
Describe the day-to-day activities required to support, manage, and monitor a newly implemented systemC
Access current network readiness, site readiness, and operational readiness in preparation for designing a solution proposalD
Gain an understanding of high-level business and technical requirements
考题
单选题驾驶台始终有驾驶员值班。()A
Sailors are always on watch on the bridge.B
Deck officers are always on watch on the bridge.C
Sailors are never on watch on the bridge.D
Deck officers are never on watch on the bridge.
考题
单选题In the plan phase, network readiness assessment addresses which customer need? Select exactly 1 answer(s) from the following:()。A
an assessment of the preparedness of the customers existing system infrastructure to support a propose solutionB
a comprehensive design that has been customized based on the operations processes, network management processes, and tools of its systemC
an in-depth assessment of the operational environment required to support the operation of both the current and planned solutionsD
the optimal technologies for supporting its business requirements and objectives
考题
单选题At an unsheltered anchorage the chief engineer officer shall consult with the master whetheror not to maintain an underway watch“An underway watch” means()A
a watch which is kept with lower standardB
a watch which is kept when the ship isnt sailingC
a watch which is kept when the ship is sailingD
a watch which is kept when the ship is in a restricted visibility area
考题
多选题Which two of these correctly describe asymmetric routing and firewalls?()Aonly operational in routed modeBonly operational in transparent modeConly eight interfaces can belong to an asymmetric routing groupDoperational in both failover and non-failover configurationsEonly operational when the firewall has been configured for failover
考题
单选题At the beginning of the watch the current operational parameters and the condition of all machinery should be verified and also the log readings should correspond with those ().A
noted by the bridge officerB
told by last duty engineerC
observedD
in the instruction manual
考题
单选题Wat is NOT required in the radiotelephone log?()A
Distress and alarm signals transmitted or interceptedB
Times of beginning and end of watch periodC
Routine navigational trafficD
Daily statement about the condition of the required radiotelephone equipment
考题
单选题In the Oil Record Book, a comprehensive list of operational items are grouped into operational sectionsEach section is codified by a/an ().A
numberB
abbreviationC
letterD
All of the above
考题
单选题The SMS should provide for specific measures aimed at promoting the reliability of equipment or systems () may result in hazardous situations.A
which the sudden operational failureB
that the sudden operational failureC
the sudden operational failureD
the sudden operational failure of which
考题
单选题However much______, it will be worth the price.A
does the watch costB
costs the watchC
the watch will costD
the watch costs
热门标签
最新试卷