网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
单选题
In which phase should a TDA be performed?()
A
Server deployment
B
Installation and server configuration
C
Problem determination/resolution
D
Needs analysis and design
参考答案
参考解析
解析:
暂无解析
更多 “单选题In which phase should a TDA be performed?()A Server deployment B Installation and server configuration C Problem determination/resolution D Needs analysis and design” 相关考题
考题
A parallel printer has just been connected. There are not selections in the SMIT menu to configure the printer. Which of the following procedures should be performed to complete the configuration?()
A.chdevB.rebootC.lpstat -QD.smit install
考题
Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
考题
Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before. A.analysis phase
B.design phase
C.implementation phase
D.maintenance phase
考题
Which two service components are performed during the wireless implement phase?()A、project planningB、configuration managementC、wireless readiness assessmentD、systems acceptance testingE、site readiness specification
考题
Which service component in the implement phase is typically performed prior to the handover of a wireless solution to the customer’s operations organization?()A、systems integrationB、skill assessmentC、systems acceptance testingD、wireless check E、project close out
考题
During the TDA, it is determined that Global Mirror will be implemented. The IBM team wants to ensure that they have enough DS8800 fiber links to handle the mirroring workload. Which tool should be used to determine the number of fiber links needed()A、RMF MagicB、Capacity MagicC、Disk MagicD、PerfMon
考题
Which service component in the implement phase is typically performed prior to the handover of a wirelesssolution to the customer’s operations organization?()A、Systems IntegrationB、Systems Acceptance TestingC、Skill AssessmentD、Project Close OutE、Wireless Check
考题
During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A、PrepareB、DesignC、PositionD、DevelopE、PlanF、Perform
考题
You need to design the VLAN scheme for the Company network. Which two statements are true about best practices in VLAN design?()A、Routing should occur at the access layer ifvoice VLANs are utilized. Otherwise, routing should occur at the distribution layer.B、Routing should always be performed at the distribution layer.C、VLANs should be localized to a switch.D、VLANs should be localized to a single switch unlessvoice VLANs are being utilized.E、Routing should not be performed between VLANs located on separate switches.
考题
Which of the following should be done before and after a service or repair is performed on a server?()A、 DefragB、 IPCONFIG /releaseC、 Firmware updateD、 Baseline
考题
Which of the following is an environmental server maintenance task that should be performed every three months?()A、Replace the rubber mats in the server roomB、Clean the servers to limit dust buildupC、Wash the outside of the serversD、Replace the server fans
考题
In which phase should a TDA be performed?() A、Server deployment B、Installation and server configuration C、Problem determination/resolution D、Needs analysis and design
考题
After putting together a configuration that meets customer’s requirements, a TDA is suggested. The customer is not familiar with the TDA process and asks why this should be done. This of the following is the benefit of TDA?()A、 A TDA are recommended only for high end hardware and very large or complex business opportunitiesB、 A TDA will ensure the solution and configuration are complete and technically sound and meet customer requirementsC、 A TDA will guarantee that the hardware will work in customer’s environment at the volumes projectedD、 A TDA brings an IBM technician onsite to properly inspect and installed hardware and related software
考题
A parallel printer has just been connected. There are not selections in the SMIT menu to configure the printer. Which of the following procedures should be performed to complete the configuration?()A、chdevB、rebootC、lpstat -QD、smit install
考题
During which boot phase is the rootvg first activated()A、Phase 1B、Phase 2C、Phase 3D、POST Phase
考题
In which phase should a TDA be performed of the following?()A、Server deploymentB、Installation and server configurationC、Problem determination / resolutionD、Needs analysis and design
考题
You work in a company which is named Wiikigo Corp. The company uses SQL Server 2008. You are the administrator of the company database. Now you are in charge of a SQL Server 2008 instance. There is a database named DB1 in the instance. At present about 90 GB of data is stored in DB1. You made some rough calculations that every day about 1 GB of data is modified or inserted. You set the recovery model of DB1 to Simple. According to the company requirements, during business hours, data loss of more than 120 minutes worth of transactions is unacceptable. You have to choose a backup strategy which must comply with the following two requirements: Using as little disk space as possible Complying with the company requirements. So what action should you perform to achieve this goal?() A、A full database backup should be performed once daily. During business hour, a transaction log backup should be performed every two hours. B、A full database backup should be performed once daily C、A full database backup should be performed once daily. During business hours, a differential backup should be performed every two hours D、Perform a full database backup should be performed once every week. A differential backup should be performed once daily. During business hours a transaction log backup should be performed every two hours.
考题
In order to change the system runlevel and execute /etc/inittab entries based on the new runlevel, which of the following commands should be performed?()A、telinitB、runinitC、sysinitD、startinit
考题
多选题Which three business requirements development activities are performed in the prepare phase before creating a technology strategy? ()Aidentifying and assessing customer business requirementsBdocumenting and categorizing customer business requirements in terms of performance, availability, capacity and securityCproducing a documented technology strategyDcreating a bill of materialsEpresenting documented business requirements to a customer and having the customer validate themFcompleting a site survey
考题
单选题Which service component in the implement phase is typically performed prior to the handover of a wirelesssolution to the customer’s operations organization?()A
Systems IntegrationB
Systems Acceptance TestingC
Skill AssessmentD
Project Close OutE
Wireless Check
考题
单选题During which phase of the steps to success methodology for Cisco SMB Security Solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which,if any modification should be prior to implementation?()A
PrepareB
DesignC
PositionD
DevelopE
PlanF
Perform
考题
多选题Which two service components are performed during the wireless implement phase?()Aproject planningBconfiguration managementCwireless readiness assessmentDsystems acceptance testingEsite readiness specification
考题
单选题Which of the following is an environmental server maintenance task that should be performed every three months?()A
Replace the rubber mats in the server roomB
Clean the servers to limit dust buildupC
Wash the outside of the serversD
Replace the server fans
考题
单选题During which phase of the steps to success methodology for Cisco SMB security solutions would the Network Readiness Assessment be used to assess the readiness of an existing network infrastructure and determine which, if any, modification should be made prior to implementation?()A
PositionB
PrepareC
DesignD
PerformE
Plan
考题
单选题Which service component in the implement phase is typically performed prior to the handover of a wireless solution to the customer’s operations organization?()A
systems integrationB
skill assessmentC
systems acceptance testingD
wireless check E
project close out
考题
多选题You need to design the VLAN scheme for the Company network. Which two statements are true about best practices in VLAN design?()ARouting should occur at the access layer ifvoice VLANs are utilized. Otherwise, routing should occur at the distribution layer.BRouting should always be performed at the distribution layer.CVLANs should be localized to a switch.DVLANs should be localized to a single switch unlessvoice VLANs are being utilized.ERouting should not be performed between VLANs located on separate switches.
考题
单选题Which of the following should be done before and after a service or repair is performed on a server?()A
DefragB
IPCONFIG /releaseC
Firmware updateD
Baseline
考题
单选题Which of the following should be performed after a maintenance kit has been applied and fullfunctionality tested?()A
Roller regenerator appliedB
Page count resetC
New network settings appliedD
Printer drum replacement
热门标签
最新试卷