网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
单选题
We’ll finish ()cargo before long.
A

loading

B

load

C

loaded

D

loads


参考答案

参考解析
解析: 暂无解析
更多 “单选题We’ll finish ()cargo before long.A loadingB loadC loadedD loads” 相关考题
考题 We’ll finish loading the trucks soon. Please get ready for ________A.lashingB.dischargingC.loadingD.tightening

考题 I guess we’ve already talked about this before but I’ll as you again just .A.by natureB.in returnC.in caseD.by chance

考题 I'll go with you as soon as I will finish my homework.()

考题 Don’t worry. We have enough time to finish ____ the food and drinks before the guests arrive.A. setting asideB. laying outC. smoothing outD. taking over

考题 Third Mate, we’ll enter the harbour, you should ring “________”now.A.Stand byB.Ring off engineC.Finished with engineD.Finish it

考题 It is fixed ________ at seven tomorrow morning.A、if we’ll start outB、that we’ll start outC、when we’ll start outD、are we going to start out

考题 I______ all my work before I________.A、finish, leaveB、finishes, leavesC、will finish, will leaveD、will finish, leave

考题 The following diagram denotes dependency between two activities A and B,It says()A.B can’t start before A is finishedB.B can’t finish before A is finishedC.B can’t start before A startsD.B can’t finish before A starts

考题 I guess we’ve already talked about this before but I’ll ask you again just .A.by natureB.in returnC.in caseD.by chance

考题 If the shippers insist on ________ the cargo in unsound condition, remarks to that effect must be inserted in their Mate's Receipt, unless they issue us the letter of guarantee.A.to loadB.loadingC.being loadedD.being loading

考题 In accordance with LOF,the owners of the vessel their Servants and Agents shall use their best endeavours to ensure that ______.A.the cargo owners provide their proportion of security before the cargo is releasedB.the cargo owners provide their proportion of security after the cargo is releasedC.the cargo owners dose not provide their proportion of security before the cargo is releasedD.the cargo owners does not provide their proportion of security after the cargo is released

考题 During the planning stage of cargo operations,stress and displacement calculations should be carried out at incremental steps commensurate with the number of _____ and loading sequence of the proposed operation.A.coefficient of loadingB.stowage factorsC.ordersD.pours

考题 The following diagram denotes dependency between two activities A and B,It says ( ) A.B can’t start before a is finished B.B can’t finish before a is finisheD. C.B can’t start before a starts D.B can’t finish before a starts

考题 We’ll finish ()the hull this morning.A、paintB、paintedC、paintingD、to paint

考题 We need the clean shipped bills of ( ) in complete set issued to order and blank endorsed marked “freight paid”A、loadingB、ladingC、inspectingD、packing

考题 我们正在装危险货。()A、We are loading flammable cargo.B、We are loading dangerous cargo.C、We are discharging flammable cargo.D、We are discharging dangerous cargo.

考题 We’ll finish ()cargo before long.A、loadingB、loadC、loadedD、loads

考题 We’ll finish loading the trucks soon. Please get ready for ().A、lashingB、dischargingC、cleaningD、loading

考题 Third Mate, we’ll enter the harbour, you should ring “()”now.A、Stand byB、Ring off engineC、Finished with engineD、Finish it

考题 So far 2,000 tons of reefer cargo().A、is loadedB、are loadedC、have loadedD、have been loaded

考题 单选题The purpose of a preventer as it is used on a conventional yard and stay cargo rig is to().A allow greater than normal loads to be handled by the gearB act as an inboard guy in the event the inboard guy parts during cargo handlingC assist the outboard guy in supporting stresses during cargo handlingD prevent the inboard guy from parting due to stresses during cargo handling

考题 单选题Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?() .A GM - available and requiredB Longitudinal stress numeralC Tons per inch immersion numeralD Draft

考题 单选题Connentrated heavy loads are involved in loading a lash vessel. What does not require close attention due to such loads while working cargo?().A GM-available and requiredB Longitudinal stress numberalC Tons per inch immersion numeralD Draft

考题 单选题We’ll have to finish the job, _____.A long it takes howeverB it takes however longC long however it takesD however long it takes

考题 单选题We have to finish the work now, ______?A don’t weB haven’t weC have weD do we

考题 单选题We’ll finish loading the trucks soon. Please get ready for ().A lashingB dischargingC cleaningD loading

考题 单选题We’ll finish ()the hull this morning.A paintB paintedC paintingD to paint