Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):
A should be deflected to the contracting officer
B should be handled via contingency allowances
C should be ignored, since they cannot be identified
D should be ignored, since they are not covered in the Project Risk Assessment
E C and D
参考答案
更多 “ Risk classified as unknown unknowns (i.e., those which cannot be identified or evaluated):A should be deflected to the contracting officerB should be handled via contingency allowancesC should be ignored, since they cannot be identifiedD should be ignored, since they are not covered in the Project Risk AssessmentE C and D ” 相关考题
考题
Since your supervisor has _____ the time for a talk, you must make sure that you will be there on time.
A.predictedB.specifiedC.yieldedD.classified
考题
I really am not qualified to ()the safety or lack of safety in drinking this water.A、valuateB、measureC、evaluateD、vaulte
考题
The teacher ______ be in the office; maybe he is in the library.A、mightB、couldC、may notD、can not
考题
Click the Exhibit button.In the exhibit, you decided to change myHosts addresses.What will happen to the new sessions matching the policy and in-progress sessions that had already matched the policy?()A. New sessions will be evaluated. In-progress sessions will be re-evaluated.B. New sessions will be evaluated. All in-progress sessions will continue.C. New sessions will be evaluated. All in-progress sessions will be dropped.D. New sessions will halt until all in-progress sessions are re-evaluated. In-progress sessions will be re-evaluated.
考题
AllofthefollowingclassesoferrorsareloggedintheerrorreportEXCEPT().
A.MessagesB.SoftwareC.HardwareD.Unknown
考题
Without the instrument,we__________A.cannot’hardly do nothingB.cannot hardly do anythingC.can hardly do nothingD.can hardly do anything
考题
New York is rated second in the production of 850,000,000 dollars this year.A:ranked
B:occupied
C:arranged
D:classified
考题
()are?those?costs?that?cannot?be?directly?traced?to?a specific?project?and?therefore?will?be?accumulated?and allocated?equitably?over?multiple?projects?by?some?approved and?documented?accounting?procedure.A.Direct costs
B.Operation costs