网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
143 For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:
A. 1.4"
B. 1.2".
C. 1.0"
D. 0.8"
E. 0.2"
参考答案
更多 “ 143 For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:A. 1.4"B. 1.2".C. 1.0"D. 0.8"E. 0.2" ” 相关考题
考题
Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard deviation of task duration.A . 0.5B . 1C . 1.8D . 2.2E . 2.8
考题
The specification for a particular part is 10" + or - 0.015". The standard associated process produces parts with a means of 10" and standard deviation of 0.002'. The process capability index is:A . 0.002B . 1C . 2.5D . 7.5E . None of the above
考题
Quality control charts show a characteristic of the product or service against:A . the specification limitsB . customer requirementsC . control limits based on three standard deviations in each directionD . control limits based on six standard deviations in each directionE . A and D only
考题
A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is:A . 0.2B . 0.8C . 4D . 5E . 7.5
考题
Two sources of variation in the length of hex bolts exist. Production variation and measurement error. The QC manager knows that the standard deviation from these sources is 0.24" and 0.43" , respectively. What is the total standard deviation.A . .10 inch.B . .19 inch.C . .34 inch.D . .49 inch.E . .67 inch.
考题
For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:A . 1.4"B . 1.2".C . 1.0"D . 0.8"E . 0.2"
考题
Standard deviation of project completion is _____ .A a relationship of the uncertainty of critical path activities.B an indicator of project end date target confidenceC a function of critical path, leveling and project costs.D A and BE All of the above.
考题
Amount at Stake is the _____ .A function of planned time/real time project costs.B risk identified in successful project completions.C (Standard Project Deviation + Expected Costs)/6D cost of investment loss + least cost to restore status quo.E inherent risk at conception altered by standard project deviations.
考题
147 A process characteristic has a true mean of 150 and a true standard deviation of 20. A sample of 25 items is taken from this process. The standard error of the estimate is:A. 0.2B. 0.8C. 4D. 5E. 7.5
考题
130 Standard deviation of project completion is _____ .A. a relationship of the uncertainty of critical path activities.B. an indicator of project end date target confidenceC. a function of critical path, leveling and project costs.D. A and BE. All of the above
考题
200 The specification for a particular part is 10" + or - 0.015". The standard associated process produces parts with a means of 10" and standard deviation of 0.002'. The process capability index is: A. 0.002B. 1.0C. 2.5D. 7.5E. None of the above
考题
25 For a given characteristic in a construction process, the standard deviation associated with production variation is 0.8", and the standard deviation associated with measurement variation is 0.6". The total standard deviation for this characteristic is:A. 1.4"B. 1.2".C. 1.0"D. 0.8"E. 0.2"
考题
123 Using the problem stated in the Special window, Calculate the deviation of duration for the task, using the PERT concept of standard deviation of task duration.A. 0.5B. 1.0C. 1.8D. 2.2E. 2.8
考题
When an azimuth of the Sun has been taken and the deviation of the standard magnetic compass computed,the watch officer should record the results ______.A.in the vessel's Official LogbookB.on the compass deviation cardC.in the compass deviation logD.on a Napier diagram
考题
Your vessel is proceeding down a channel,and you see a pair of range lights that are in line dead ahead.The chart indicates that the direction of this pair of lights is 229°T,and variation is 6°W.If the heading of your vessel at the time of the sighting is 232°per standard magnetic compass,what is the correct deviation ________.A.3°EB.9°EC.3°WD.9°W
考题
Compass error is equal to the ______.A.deviation minus variationB.variation plus compass courseC.combined variation and deviationD.difference between true and magnetic heading
考题
A.mean
B.variance
C.percentile
D.standard deviation
E.coefficient of variation表示正态分布资料中的集中趋势最好采用
考题
A.mean
B.variance
C.percentile
D.standard deviation
E.coefficient of variation求偏态分布资料的正常值范围时,应计算
考题
求偏态分布资料的正常值范围时,应计算()A、meanB、varianceC、percentileD、standard deviationE、coefficient of variation
考题
问答题Kara attends a university where students study for an average (arithmetic mean) of 13.4 hours per week. How many hours per week does Kara study? (1) The standard deviation of study time at Kara’s school is 2.8. (2) Kara’s study time is one standard deviation away from the mean.
考题
单选题The principal purpose of magnetic compass adjustment is to().A
reduce the variation as much as possibleB
reduce the deviation as much as possibleC
reduce the magnetic dip as much as possibleD
allow the compass bowl to swing freely on its gimbals
考题
单选题If the set S is composed of the following numbers {99, 100, 100, 105, 106, 116, 123}, which of the following is largest?A
The average (arithmetic mean) of set SB
The median of set SC
The mode of set SD
The range of set SE
The standard deviation of set S
热门标签
最新试卷