网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.

A.Two to four feet by the bow

B.Slightly by the bow

C.No trim should be permitted

D.Slightly by the stern


参考答案

更多 “ Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner ________.A.Two to four feet by the bowB.Slightly by the bowC.No trim should be permittedD.Slightly by the stern ” 相关考题
考题 A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind ______.A.comes over the bowB.blows the fire back toward the vesselC.comes over the sternD.comes over either beam

考题 Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel?A.Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holdsB.Turn on ventilation for cargo holds,raise/open the stern door,lower the stern rampC.Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern doorD.Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds

考题 To determine which grades of cargo a tank vessel is permitted to carry you should ______.A.refer to the vessel's Certificate of InspectionB.examine the cargo tanks and fittingsC.ask the terminal supervisor or his representativeD.check the loading order

考题 That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that ______.A.any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB.the vessel should not be removedC.any and all lists on board the vessel should be taken offD.the inclination of the vessel should be corrected prior to ending his watch by the OOW

考题 A vessel trimmed by the stern has a ______.A.ListB.DragC.SetD.Sheer

考题 What should be done after putting down the ramp on a Ro-Ro vessel,prior to loading or discharging cargo ________.A.Turn on red cargo lightB.Turn on ventilation for cargo holdsC.Call out the deck department for all handsD.None of the above

考题 While off-loading from an offshore supply vessel with the crane,the wind increases in strength and changes direction significantly,you should ______.A.Expedite off-loadingB.Stop off-loading,but keep the offshore supply vessel in the present locationC.Continue off-loading with no changesD.Move the offshore supply vessel to the downwind side

考题 Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?______.A.GM – available and requiredB.Longitudinal stress numeralC.Tons per inch immersion numeralD.Draft

考题 翻译:shore tallyman to be employed by the vessel at the expenses to the vessel ,both at loading and discharging port

考题 单选题A vessel trimmed by the stern has a().A listB dragC setD sheer

考题 单选题Prior to being able to sail in a US port,each vessel that carries grain in bulk must have a certificate of loading issued by the().A American Bureau of ShippingB Lloyds of LondonC National Cargo BureauD US Salvage

考题 单选题How should you try to right a capsized small sailing vessel?()A Position all personnel at the stern and rock the vessel uprightB Position all personnel around the mast and lift the vessel uprightC Lock the centerboard in the down position,stand on the centerboard,and pull on a shroud or a halyardD Put the centerboard in the up position and have all personnel haul in on the line attached to the mast

考题 单选题You are transporting dangerous cargo on your vessel.You must inspect this cargo().A DailyB Daily,at sea onlyC After encountering rough weatherD After loading and prior to arrival in port only

考题 单选题Prior to loading barges over the stern of a LASH vessel,the vessel should be trimmed in what manner?().A Two to four feet by the bowB Slightly by the bowC No trim should be permittedD Slightly by the stern

考题 单选题In astern towing,a tow span,also called the tow bar or towing arch,is used to().A insure that the hawser leads directly aft as it passes over the stern of the towing vesselB increase the stability of the towing vessel by raising the hawser off the deckC reduce chafing of the towing hawserD prevent fouling of the hawser on deck gear located on the stern of the towing vessel

考题 单选题To determine which grades of cargo a tank vessel is permitted to carry you should().A refer to the vessel's Certificate of InspectionB examine the cargo tanks and fittingsC ask the terminal supervisor or his representativeD check the loading order

考题 单选题When the tail-shaft is drawn from a vessel in dry-dock, which of the following inspections is required to be carried out?()A The propeller hub taper and shaft keyway should be inspected for cracks or corrosionB The stern bearing alignment with the stern frame should be checkedC The interior of the stern tube should be inspected for leaksD The shaft liner should be removed and inspected

考题 单选题Two barges are being pushed ahead by a tugboat.Which statement is TRUE concerning lights on the barges().A Each vessel should show sidelightsB Each vessel should show at least one white lightC The barges should be lighted as separate unitsD The barges should be lighted as one vessel

考题 单选题When evacuating a seaman by helicopter lift,which statement is TRUE?()A Evacuation should be from an area forward of the bridgeB The vessel should be slowed to bare steeragewayC If the hoist is at the stern,booms extending aft at the stern should be cradled with the topping lifts hove tautD The litter should not be touched until it has been grounded

考题 单选题Concentrated heavy loads are involved in loading a LASH vessel. What does NOT require close attention due to such loads while working cargo?() .A GM - available and requiredB Longitudinal stress numeralC Tons per inch immersion numeralD Draft

考题 单选题Connentrated heavy loads are involved in loading a lash vessel. What does not require close attention due to such loads while working cargo?().A GM-available and requiredB Longitudinal stress numberalC Tons per inch immersion numeralD Draft

考题 单选题What is NOT a problem area when loading barges on a LASH type vessel? ()A Frequent stability calculations requiredB Thorough pre-planning requiredC Limiting depths alongside berths restrict barge draftsD Minimum trim and 0°list are required for optimum operations

考题 单选题A situation has occurred in which your vessel must be towed. When the towing vessel passes the towing line to you,you should secure the line().A to the base of the foremastB to the forward-most bittsC to the forward part of the deckhouseD at the stern

考题 单选题A fire has broken out on the stern of your vessel. You should maneuver your vessel so the wind ().A comes over the bowB blows the fire back toward the vesselC comes over the sternD comes over either beam

考题 单选题Which of the following actions are stated in the correct order prior to loading or discharging cargo on a Ro-Ro vessel? ()A Lower the stern ramp,raise/open the stern door,turn on ventilation for cargo holdsB Turn on ventilation for cargo holds,raise/open the stern door,lower the stern rampC Turn on ventilation for cargo holds,lower the stern ramp,raise/open the stern doorD Raise/open the stern door,lower the stern ramp,turn on ventilation for cargo holds

考题 单选题If your vessel is dragging her anchor in a strong wind,you should().A shorten the scope of anchor cableB increase the scope of anchor cableC put over the sea anchorD put over a stern anchor

考题 单选题That REMOVE ANY LIST ON THE V/L AFTER EACH WATCH END means that().A any list,no matter where it is posted,shall be removed prior to ending his watch by the OOWB the vessel should not be removedC any and all lists on board the vessel should be taken offD the inclination of the vessel should be corrected prior to ending his watch by the OOW