网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)

from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.

A.Process

B.Milestone

C.Work

D.Deliverables


参考答案

更多 “ from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.A.ProcessB.MilestoneC.WorkD.Deliverables ” 相关考题
考题 — Excuse me, when is the next flight from London due to arrive? — _________ A.In half an hour.B.An hour before.C.Until the next one.D.Before another one.

考题 Make or buy decisions are usually made during the _____ phase of a project.A.ConceptualB.Development.C.ImplementationD.ExecutionE.Close-out

考题 ● Software maintenance is to do necessary modification,supplenemt,and completeness during software life circle.Among the following vary kinds of maintenance,which one has the maximum workload in a general way? (73) .(73) A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

考题 ● (66) from one phase are usually reviewed for completeness and accuracyand approved before work starts on the next phase.A.ProcessB.MilestoneC.Work D.Deliverables

考题 Development is a structured design methodology that proceeds in a sequence from one phase to the next.A.WaterfallB.PhasedC.PrototypingD.Parallel

考题 Many of the activities performed during the preliminary investigation are still being conducted in(71) , but in much greater depth than before. During this phase, the analyst must become fully aware of the(72) and must develop enough knowledge about the(73) and the existing systems to enable an effective solution to be proposed and implemented. Besides the(74) for process and data of current system, the deliverable from this phase also includes the(75) for the proposed system.A.analysis phaseB.design phaseC.implementation phaseD.maintenance phase

考题 Viruses usually have two phases to their execution, the infection phase and the(75)phase. The later phase is optional, since stone viruses simply reproduce.A.reproduceB.proliferationC.defendD.attack

考题 Software maintenance is to do necessary modification, supplenemt, and completeness during software life circle. Among the following vary kinds of maintenance, which one has the maximum workload in a general way?(73).A.relevance maintenanceB.completeness maintenanceC.correctness naintenanceD.other kinds of maintenance

考题 15. From the passage,we can learn _________ .A. one shouldn’t criticize others very oftenB. one should often make his windows cleanC. one must judge himself before he judges othersD. one must look at others through his dirty window

考题 ● (75) Development is a structured design methodology that proceeds in a sequence from one phase to the next.(75)A. WaterfallB. PhasedC. PrototypingD. Parallel

考题 Before operating a non-oceangoing ship greater than 100 gross tons it must have a fixed piping system to discharge oily mixtures ashore. This system must include______.A.approved oily-water separating equipmentB.a fixed or portable containment system at the shore connectionC.a spare pump in case the main pump is inoperativeD.at least one outlet accessible from the weather deck

考题 The minimum amount of lifesaving equipment required aboard an 85-foot uninspected towing vessel consists of ______.A.One approved flotation cushion for each person on boardB.One approved life preserver for each person on board and one life ringC.One approved inflatable vest for each person on boardD.Lifeboat capacity equal to 1 1/2 times the number of persons on board

考题 The life cycle ofa project is a description of the various phases of the project from the beginning to the end.One of the followings is not a phase of the traditional project life cycle,itis_( )A.devclopment B.concept C.system analysis D.implementation

考题 Many of the activities performed during the preliminary investigation are still being conducted in ____, but in much greater depth than before.A.analysis phase B.design phase C.implementation phase D.maintenance phase

考题 The life cycle of a project is a description of the various phases of the project from the beginning to the end. One of the followings is not a phase of the traditional project life cycle, It is( ).A.development B.concept C.system analysis D.implementation

考题 The life cycle of aproject is a description of the various phases of the project from thebeginning to the end. One of the followings is not a phase of the traditionalproject life cycle, It is( ). A.development B.concept C.system analysis D.implementation

考题 Many of the activities performed during the preliminary investigation are still being conducted in ( ), but in much greater depth than before. A.analysis phase B.design phase C.implementation phase D.maintenance phase

考题 Excuse me, when is the next flight from London due to arrive? ()AIn half an hour.BAn hour before.CUntil the next one.DBefore another one.

考题 --Excuse me, when is the next flight from London due to arrive? --().A、An hour beforeB、In half anhour.C、Until the next one.D、Before another one.

考题 Excuse me, when is the next flight from London due to arrive? ()A、In half an hour.B、An hour before.C、Until the next one.D、Before another one.

考题 You are a security administrator for your company. The company has one main office and five branch offices. Network administrators work in the main office and each branch office.    Network administrators in the main office frequently create scripts that automate common  administrative tasks. You review each script to ensure it does not introduce security vulnerabilities. Scripts that do not introduce security vulnerabilities are considered approved. Occasionally, branch office administrators modify these scripts and distribute the modified scripts to other  branch office administrators. Branch office administrators often report that they accidentally run a modified version of a script.    You need to ensure that branch office administrators can verify which scripts are approved scripts.  What should you do?()A、 Maintain a list of the dates that the approved scripts were last modified. lnstruct branch office administrators to verifB、 Digitally sign All approved scripts. Instruct branch office administrators to verify the signature before using a script.C、 Distribute all approved scripts to branch office administrators in an e-mail message.D、 Place all approved scripts on a file server in the main office. Assign All branch office administrators only the Allow -the approved scripts. Instruct administrators to copy scripts from this file server.

考题 Which benefit can be obtained by using the CHANGE management service component in the operate phase? Select exactly 1 answer(s) from the following:()。A、reduced operating costs, due to a consistent framework for making necessary changes in an efficient and accountable mannerB、greater accuracy, completeness, and timeliness of network configuration informationC、notification provided to interested parties regarding problems that have been identified, and a system that scales with customer requirementsD、improved system service quality and fewer disruptions

考题 单选题In the production of freshwater from seawater through a process of heating and cooling, the cooling phase of production is usually called ().A evaporationB distillationC dehydrationD condensation

考题 单选题Excuse me, when is the next flight from London due to arrive? ()A In half an hour.B An hour before.C Until the next one.D Before another one.

考题 单选题Shipboard Oil Pollution Emergency Plans must be reviewed().A annually by the owner,with a letter submitted six months before expirationB only once every five years,with a letter submitted six months before expirationC and the entire plan resubmitted for approval once every five years,six months before expirationD annually by the owner,with a letter submitted to the Coast Guard within one month of the anniversary date of the plan approval

考题 单选题An alternator switchboard has a synchroscope and synchronizing lamps, if the synchroscope is broken, which of the steps listed is the most essential before an alternator can be paralleled with the bus ()A The breaker should be closed when one synchronizing lamp is dark and the other is brightB The breaker should be closed when both synchronizing lamps are brightC The frequency meter should be used to determine that the incoming alternator frequency is slightly higher than the busD A portable phase sequence indicator must be used to verify the information from the lamps

考题 单选题Small floes of rough,hummocky sea ice capable of damaging a vessel().A can usually be detected by radar in a smooth sea at a range of 4 to 6 kilometersB are indistinguishable from sea return on the PPIC are invisible to radar when covered with a thick layer of snowD are usually seen at night before they are close enough to provide a radar echo

考题 单选题() from one phase are usually reviewed for completeness and accuracy and approved before work starts on the next phase.A ProcessB MilestoneC WorkD Deliverables