网友您好, 请在下方输入框内输入要搜索的题目:

题目内容 (请给出正确答案)
You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()

A. The TESTKING VLAN must be created.

B. The desired ports must be added to the new TESTKING VLAN.

C. The TESTKING VLAN must be added to all of the domains.

D. The TESTKING VLAN must be named.

E. An IP address must be configured for the TESTKING VLAN.

F. None of the above. VLAN creations are automatic.


参考答案

更多 “ You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?() A. The TESTKING VLAN must be created.B. The desired ports must be added to the new TESTKING VLAN.C. The TESTKING VLAN must be added to all of the domains.D. The TESTKING VLAN must be named.E. An IP address must be configured for the TESTKING VLAN.F. None of the above. VLAN creations are automatic. ” 相关考题
考题 You are an administrator of the Ezonexam switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in the Ezonexam network.However, you need to share the VLAN information across numerous switches. Which of the following would allow you accomplish this?A. STPB. GVRPC. SNMPD. VTPE. DHCPF. None of the above

考题 Which of the following steps are necessary in order to add a new VLAN to the Ezonexam switched network? (Select all that apply)A.Create the VLAN.B.Name the VLAN.C.Configure an IP address for the VLAN.D.Add the desired ports to the new VLAN.E.Add the VLAN to the VTP domain.

考题 A new Ezonexam switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?A.All defined VLANs are allowed on the trunk by default.B.Each VLAN, or VLAN range, that is specified with the switchport mode command.C.Each VLAN, or VLAN range, that is specified with the vtp domain command.D.Each VLAN, or VLAN range, that is specified with the vlan database command.E.None of the above

考题 You need to create a new VLAN on your Catalyst switch. This VLAN is to be named EZONEXAM. Which of the following need to be completed for the creation of this new VLAN? (Select all that apply)A. The EZONEXAM VLAN must be created.B. The desired ports must be added to the new EZONEXAM VLAN.C. The EZONEXAM VLAN must be added to all of the domains.D. The EZONEXAM VLAN must be named.E. An IP address must be configured for the EZONEXAM VLAN.F. None of the above. VLAN creations are automatic.

考题 A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?() A. The VLAN must be createdB. The VLAN must be namedC. An IP address and subnet mask must be configured for the new VLAND. The desired ports must be added to the new VLANE. The VLAN must be added to the existing VTP Domain

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?() A. All defined VLANs are allowed on the trunk by default.B. Each VLAN, or VLAN range, that is specified with the switchport mode command.C. Each VLAN, or VLAN range, that is specified with the vtp domain command.D. Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 Which of the following steps are necessary in order to add a new VLAN to a switched network?() A. Create the VLAN.B. Name the VLAN.C. Configure an IP address for the VLAN.D. Add the desired ports to the new VLAN.E. Add the VLAN to the VTP domain.

考题 You are an administrator of a switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in your network. However, you need to share the VLAN information across numerous switches throughout your network. Which of the following would allow you accomplish this?()A、STPB、GVRPC、SNMPD、VTPE、DHCP

考题 Which of the following steps are necessary in order to add a new VLAN to a switched network?()A、Create the VLAN.B、Name the VLAN.C、Configure an IP address for the VLAN.D、Add the desired ports to the new VLAN.E、Add the VLAN to the VTP domain.

考题 A Cisco Catalyst switch is part of the CIS network. As an experienced network administrator, you are thinking of filtering the traffic within VLANI00 with the use of a VACL named "test" on that switch. Which of the following command will enable that?() A、interface vlan 100 ip access-group test inB、interface vlan 100 ip access-group testC、vlan access-map test 100D、vlan filter test vlan-list 100

考题 VLAN 3 is not yet configured on your switch. What happens if you set the switchport access vlan3 commmand interface configuration mode?()A、The command is accepted and the respective VLAN is added to vlan dat.B、The command is rejected.C、The command is accepted and you must configure the VLAN manually.D、The port turns amber.

考题 A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()A、The VLAN must be createdB、The VLAN must be namedC、An IP address and subnet mask must be configured for the new VLAND、The desired ports must be added to the new VLANE、The VLAN must be added to the existing VTP Domain

考题 A new switch is installed into an existing LAN and a new VTP trunk is set up with an existing switch. Which VLANs will be allowed on this new trunk?()A、All defined VLANs are allowed on the trunk by default.B、Each VLAN, or VLAN range, that is specified with the switchport mode command.C、Each VLAN, or VLAN range, that is specified with the vtp domain command.D、Each VLAN, or VLAN range, that is specified with the vlan database command.

考题 You need make configuration changes to an existing layer 3 switch in the Company network. On a  multilayer Catalyst switch,  which interface command is used to convert a Layer 3 interface to a  Layer 2 interface?()A、 switchport access vlan vlan-idB、 switchportC、 switchport mode accessD、 no switchportE、 None of the other alternatives apply

考题 You have just created a new VLAN on your network.  What is one step that you should include in your VLAN-based implementation and verification plan? ()A、Verify that trunked links are configured to allow the VLAN traffic.B、Verify that the switch is configured to allow for trunking on the switch ports.C、Verify that each switch port has the correct IP address space assigned to it for the new VLAN.D、Verify that different native VLANs exist between two switches for security purposes.

考题 You need to create a new VLAN on your Catalyst switch. This VLAN is to be named TESTKING. Which of the following need to be completed for the creation of this new VLAN?()A、The TESTKING VLAN must be created.B、The desired ports must be added to the new TESTKING VLAN.C、The TESTKING VLAN must be added to all of the domains.D、The TESTKING VLAN must be named.E、An IP address must be configured for the TESTKING VLAN.F、None of the above. VLAN creations are automatic.

考题 By default, each port in a Cisco Catalyst switch is assigned to VLAN1. Which two recommendations are key to avoid unauthorized management access? ()A、Create an additional ACL to block the access to VLAN 1.B、Move the management VLAN to something other than default.C、Move all ports to another VLAN and deactivate the default VLAN.D、Limit the access in the switch using port security configuration.E、Use static VLAN in trunks and access ports to restrict connections.F、Shutdown all unused ports in the Catalyst switch.

考题 多选题By default, each port in a Cisco Catalyst switch is assigned to VLAN1. Which two recommendations are key to avoid unauthorized management access?()ACreate an additional ACL to block the access to VLAN 1.BMove the management VLAN to something other than default.CMove all ports to another VLAN and deactivate the default VLAN.DLimit the access in the switch using port security configuration.EUse static VLAN in trunks and access ports to restrict connections.FShutdown all unused ports in the Catalyst switch.

考题 单选题You are an administrator of a switched network and your goal is to reduce some of the administrative overhead on your network. You plan on achieving this by configuring a new VLAN for each department in your network. However, you need to share the VLAN information across numerous switches throughout your network. Which of the following would allow you accomplish this?()A STPB GVRPC SNMPD VTPE DHCP

考题 单选题You need make configuration changes to an existing layer 3 switch in the Company network. On a  multilayer Catalyst switch,  which interface command is used to convert a Layer 3 interface to a  Layer 2 interface?()A  switchport access vlan vlan-idB  switchportC  switchport mode accessD  no switchportE  None of the other alternatives apply

考题 单选题A Cisco Catalyst switch is part of the CIS network. As an experienced network administrator, you are thinking of filtering the traffic within VLANI00 with the use of a VACL named "test" on that switch. Which of the following command will enable that?()A interface vlan 100 ip access-group test inB interface vlan 100 ip access-group testC vlan access-map test 100D vlan filter test vlan-list 100

考题 多选题Your network contains a Hyper-V host named Host1 that runs Windows Server 2008 R2. The host is connected to VLAN ID 10. For testing purposes, you plan to deploy several virtual machines (VMs) on the Host1. You need to recommend which virtual networks must be created for the VMs. The solution must ensure that the VMs can only connect to other VMs. Which network configuration or configurations should you recommend?()Aan external network on VLAN ID 10Ban internal network on VLAN ID 11Can external network on VLAN ID 11Da private network on VLAN ID 10Ean internal network on VLAN ID 10

考题 多选题Which of the following steps are necessary in order to add a new VLAN to a switched network?()ACreate the VLAN.BName the VLAN.CConfigure an IP address for the VLAN.DAdd the desired ports to the new VLAN.EAdd the VLAN to the VTP domain.

考题 多选题You need to configure a new Company Catalyst 3560 switch for a VOIP-enabled office.  Which  three statements are true about the voice VLAN feature on this switch?()AThe default CoS value for incoming traffic is set up to 0.BThe CoS value is trusted for 802.1p or 802.1q tagged traffic.CPortFast is automatically disabled when a voice VLAN is configured.DThe voice VLAN feature is disabled by default.EThe IP phone accepts the priority of all tagged and untagged traffic and sets the CoS value to 4.FWhen the voice VLAN feature is enabled, all untagged traffic is sent according to the default  CoS priority of the port

考题 单选题You have just created a new VLAN on your network for inter-VLAN routing.  What is one step that you should include in your VLAN-based implementation and verification plan?()A Verify that different native VLANs exist between two switches for security purposes.B Verify that the switch is configured to allow for trunking on the switch ports.C Verify that each switch port has the proper IP address space assigned to it for the new VLAN. D Verify that the VLAN virtual interface has been correctly created and enabled.

考题 多选题A new VLAN needs to be created for an existing network. Which of the following are the minimum tasks that must be accomplished in order to create the new VLAN?()AThe VLAN must be createdBThe VLAN must be namedCAn IP address and subnet mask must be configured for the new VLANDThe desired ports must be added to the new VLANEThe VLAN must be added to the existing VTP Domain

考题 单选题You have just created a new VLAN on your network.  What is one step that  you should include in your VLAN based implementation and verification plan? ()A Verify that different native VLANs exist between two switches for security purposes.B Verify that the VLAN was added on all switches with the use of the show vlan command. C Verify that the switch is configured to allow for trunking on the switch ports.D Verify that each switch port has the correct IP address space assigned to it for the new VLAN.

考题 单选题VLAN 3 is not yet configured on your switch. What happens if you set the switchport access vlan3 commmand interface configuration mode?()A The command is accepted and the respective VLAN is added to vlan dat.B The command is rejected.C The command is accepted and you must configure the VLAN manually.D The port turns amber.