网友您好, 请在下方输入框内输入要搜索的题目:
题目内容
(请给出正确答案)
During which condition should the operator of a pedestal crane shutdown operations ________.
A.Bunkering barge alongside
B.Potable water spill on deck
C.Crane hydraulic hose bursts
D.Trim greater than 4 feet
参考答案
更多 “ During which condition should the operator of a pedestal crane shutdown operations ________.A.Bunkering barge alongsideB.Potable water spill on deckC.Crane hydraulic hose burstsD.Trim greater than 4 feet ” 相关考题
考题
Which of the following can an operator use to shutdown a system into single-user mode?()
A.shutdown -dB.shutdown -sC.shutdown -mD.shutdown -Fr -s 1
考题
Which statement(s) is/are TRUE concerning crane cargo operations?A.Do not exceed rated load capacity of crane and container spreader or slingsB.During any cargo handling operation,the safety of personnel is paramountC.Cargo handlers must be outfitted with adequate protection from personal injuryD.All the above
考题
Which safety precaution(s)should be observed during crane operations ________.A.Checking for proper lifting from beneath the load during cargo operationsB.Using the proper slings or other lifting devices during cargo operationsC.Relaying communications to port agents on the pier during cargo hoistsD.All of the above
考题
Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set ________.A.The cranes may be operated independentlyB.The cranes may be interconnected for twin operationC.When twinned,the crane rotation on the foundation assembly is unlimitedD.All of the above
考题
Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane ________.A.Taglines are wire rope purchases that raise and lower the jibB.Taglines are wire ropes for horizontal positioning of the rider blockC.Taglines can be fastened to corners of vehicles or containersD.The crane might not have taglines installed in its rigging system
考题
Which wire rope purchases may be used with a 30-ton pedestal crane ________.A.HoistB.LuffC.Rider blockD.All of the above
考题
Which statement comparing a shipboard crane to conventional gear is TRUE ________.A.Cranes are more difficult to secure for seaB.The spotting area of the conventional gear is largerC.A crane operator requires more training than the winch operator of a yard and stay rigD.The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes
考题
Which of the following statements is TRUE regarding crane operations ________.A.Radio communications allow the crane operator to disregard the use of hand signalsB.The crane operators and signalman must be familiar with the correct hand signalsC.The forward cranes can be operated from the bridgeD.The aft cranes can be operated from the aft steering station
考题
During which condition should be operator of a pedestal crane shutdown operations?A.BunkeringB.High windsC.Potable water spill on deckD.More than 3°list
考题
Which of the following can an operator use to shutdown a system into single-user mode?()A、shutdown -dB、shutdown -sC、shutdown -mD、shutdown -Fr -s 1
考题
单选题Which statement comparing a shipboard crane to conventional gear is TRUE().A
Cranes are more difficult to secure for seaB
The spotting area of the conventional gear is largerC
A crane operator requires more training than the winch operator of a yard and stay rigD
The yard and stay rig is more flexible in its ability to handle a wider variety of cargoes
考题
单选题Which statement is FALSE concerning a tagline as used with a 30-ton pedestal crane().A
Taglines are wire rope purchases that raise and lower the jibB
Taglines are wire ropes for horizontal positioning of the rider blockC
Taglines can be fastened to corners of vehicles or containersD
The crane might not have taglines installed in its rigging system
考题
单选题During which condition should the operator of a pedestal crane shutdown operations?()A
Lightning in the vicinityB
An approaching squall lineC
A fire on the pierD
All of the above
考题
单选题Which action(s) is/are included in crane operations?()A
Normal boom stowage and shutdown operationsB
Emergency shutdown operationC
Removing booms from stowageD
All of the above
考题
单选题Which of the following statement(s)is/are TRUE regarding a twin pedestal crane set().A
The cranes may be operated independentlyB
The cranes may be interconnected for twin operationC
When twinned,the crane rotation on the foundation assembly is unlimitedD
All of the above
考题
单选题Which of the following statements is TRUE regarding crane operations().A
Radio communications allow the crane operator to disregard the use of hand signalsB
The crane operators and signalman must be familiar with the correct hand signalsC
The forward cranes can be operated from the bridgeD
The aft cranes can be operated from the aft steering station
考题
单选题During which condition should the operator of a pedestal crane shutdown operations?()A
LightningB
High windsC
Fire aboardD
All of the above
考题
单选题The crane is usually mounted on a pedestal to offer adequate () to the operator.A
timeB
spaceC
lengthD
visibility
考题
单选题During which condition should the operator of a pedestal crane shutdown operations?()A
BunkeringB
High windsC
Potable water spill on deck
考题
单选题Which of the following statement(s)is/are FALSE regarding a twin pedestal crane set ().A
The cranes may be operated independentlyB
The cranes may be interconnected for twin operationC
The cranes are powered by independent internal combustion power unitsD
All of the above
考题
单选题Which action(s) should the operator of a pedestal crane take if crane control is lost?()A
Let go of both control levers and return to neutral positionB
Press the emergency stopC
Notify the mate on watchD
All of the above
考题
单选题During which condition should the operator of a pedestal crane shutdown operations?()A
Bunkering barge alongsideB
Potable water spill on deckC
Crane hydraulic hose burstsD
Trim greater than 4 feet
考题
单选题During operation, the ()should check the working condition of the derrick.A
foremanB
operatorC
openerD
stevedore
考题
单选题If you observe any situation which presents a safety or pollution hazard during fuel transfer operations, which of the following actions should be taken FIRST?()A
Close the valves at the transfer manifoldB
Notify the person in charge of the shore facilityC
Shut down the transfer operationD
Sound the fire alarm
考题
单选题The()should ensure that the holds in which chemical packages are stowed are properly supervised during the loading operations and these packages are regularly inspected for leakage or damage on the voyage.A
berth operatorB
harbour supervisorC
master of a shipD
port authority
考题
单选题The temperature of the fuel oil received during bunkering operations is critical in determining the()A
expansion space to leave in a tankB
flash point at which the fuel will burnC
temperature to which the fuel must be heatedD
rate at which the fuel can be pumped during transfer operations
考题
单选题Which statement is FALSE concerning precautions during fueling operations?()A
All engines,motors,fans,etc. should be shut down when fuelingB
All windows,doors,hatches,etc. should be closedC
A fire extinguisher should be kept nearbyD
Fuel tanks should be topped off with no room for expansion
热门标签
最新试卷